Focused Engineering Inspection: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page with "'''Focused Engineering Inspection (has acronym::FEI)''' * letter::VR-SECY-22-0053, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections Periodicity (Baran) * URL::https://www.nrc.gov/docs/ML2132/ML21323A049.pdf ==List of FEI== * inspection procedure::IP 7111.21N.02, Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements * inspection procedure::IP 7111.21N.03, Commercial Grade Dedication * i...") |
(No difference)
|
Revision as of 07:48, 13 November 2023
Focused Engineering Inspection (FEI)
- VR-SECY-22-0053, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections Periodicity (Baran)
- https://www.nrc.gov/docs/ML2132/ML21323A049.pdf
List of FEI
- IP 7111.21N.02, Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements
- IP 7111.21N.03, Commercial Grade Dedication
- IP 7111.21N.04, Age-Related Degradation
- IP 7111.21N.05, Fire Protection Team Inspection (FTPI)\