ML20063F150: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[W3P82-2309, Informs That Response to NRC 820327 Questions Re Rapid Depressurization & Decay Heat Removal Capability of Facility Design Will Be Provided by 830815]]
| number = ML20063F150
| issue date = 08/25/1982
| title = Informs That Response to NRC 820327 Questions Re Rapid Depressurization & Decay Heat Removal Capability of Facility Design Will Be Provided by 830815
| author name = Maurin L
| author affiliation = LOUISIANA POWER & LIGHT CO.
| addressee name = Tedesco R
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000382
| license number =
| contact person =
| document report number = W3P82-2309, NUDOCS 8208310154
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
}}
 
=Text=
{{#Wiki_filter:I l
I OUISIANA          i4a OuAnONOc Sinca P O W E R. & L 1 G H T! P O BOX *0008 NEW ORLcANS. LOUISIANA 70174 * (504) 366 2345
    's00SysY[0 u                                                                            L V. MAURIN Vice President Nuclear Operations August 25, 1982 W3P82-2309 3-A1.01.04 3-A20.20 Mr. R. L. Tedesco Assistant Director for Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
 
==SUBJECT:==
Waterford SES 3 Depressurization and Decay IIcat Removal
 
==References:==
(1) R. L. Tedesco to L. V. Maurin dated 3/27/82 (2) L. V. Maurin to R. L. Tedesco, W3P82-1107, dated 5/6/82 Reference (1) transmitted questions regarding the rapid depressurization and decay heat removal capability of the Waterford 3 design and requested a schedule for response. Reference (2) indicated that we would provide you with a finalized schedule when the CE Owners Group (CEOG) developed a program and schedule for answering the questions.
The CEOG has now begun work on the subject questions. As you know, a good deal of the work is plant specific, requiring a staggered schedule for completion on a plant by plant basis. The lead plant is San Onofre, Unit 2, which has scheduled its submission for June 30, 1983.
Waterford 3 will follow San Onofre. Based on their schedule we expect to provide the response for Waterford by August 15, 1983.
e'  .
9 Nkt L. V. Maurin u
LVM/FUM/pco cc:  W. M. Stevenson, E. L. Blake, S. Black 00/
8208310154 820825 PDR ADOCK 05000382                                                                                l A                  PDR                                                                          l 1
 
1 1
i sa                                                                                '
i bec: Ebasco (2), J. M. Brooks, R. J. Milhiser (2), D. B. Lester, F. J. Drummond, R. W. Prados, T. F. Gerrets, C. J. Decareaux, T. K. Armington, P. V. Prasankumar, J. R. McGaha, D. C. Gibbs, Richard llumes, L. L. Bass, M. I. Meyer, K. R. Iyengar, L. V. Maurin, R. M. Foley, J. Ilart, M. Meisner, Central Records, Nuclear Records (3),