ML20136A684: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[TXX-4624, Forwards 3-D Response Spectrum Analysis & Verification of Multimode Response Multiplier Equal to 1.25, Per Request During NRC 851025 Audit of Cable Tray Hanger Design Verification Program]]
| number = ML20136A684
| issue date = 11/14/1985
| title = Forwards 3-D Response Spectrum Analysis & Verification of Multimode Response Multiplier Equal to 1.25, Per Request During NRC 851025 Audit of Cable Tray Hanger Design Verification Program
| author name = Counsil W
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| addressee name = Noonan V
| addressee affiliation = NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM), NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000445, 05000446
| license number =
| contact person =
| document report number = CPPA-47-527, TXX-4624, NUDOCS 8511200007
| package number = ML20136A689
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
}}
 
=Text=
{{#Wiki_filter:I CPPA-47,527                TEXAS UTILITIES GENERATING COMPANY                                FN!lIhhig624 RKYWAY TOWER . 400 NORT,5 OIJVE NTREET. I.R at . DAI.LAN, TEXAN 78308 wauAM O CoWNSIL                                          November 14, 1985 EEECuflVE VICE P4E$lOENT Director of Nuclear Reactor Regulation Attention: Mr. Vincent S. Noonan, Director Comanche Peak Project Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.            20555
 
==SUBJECT:==
COMANCllE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 CABLE TRAY HANGER DESIGN ADEQUACY
 
==Dear Mr. Noonan:==
 
Enclosed is a copy of EBASCO's study on the multi-mode response multiplier used in cable tray hanger design verification activities. This information was requested by Messrs. L. Shao and D. Jeng of your staff during the NRC audit of CPSES cable tray hanger design verification program held in EBASCO's New York office on October 25, 1985.
If there are any questions regarding the study, please contact H. A. Harrison at extension (817) 897-8691.
Very truly yours, s
W. G. Counsil WGC/        /JMD/gh cc      J. W. Beck J. T. Merritt R. E. Camp C. R. Hooton (w/ attachment)
R. M. Kissinger
                ,  T. Tyler (w/ attachment)
ARMS 8511200007 851114
                              $DR ADOCK 05000445          PDR
                                                                                                                    \ b A DIVISION OF TEXAN UTELETIER ELECTRIC COMPANY
: u.                                                                                                                      a}}

Latest revision as of 02:12, 13 July 2023