ML20136C422: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[TXX-4615, Deficiency Rept SDAR-201 Re Installed Conduit to Equipment Interface Not Being Specified Per Design Documents.Initially Reported on 850918.Completion of Evaluation Expected by 860212]]
| number = ML20136C422
| issue date = 11/07/1985
| title = Deficiency Rept SDAR-201 Re Installed Conduit to Equipment Interface Not Being Specified Per Design Documents.Initially Reported on 850918.Completion of Evaluation Expected by 860212
| author name = Counsil W
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| addressee name = Denise R
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| docket = 05000446
| license number =
| contact person =
| document report number = SDAR-201, TXX-4615, NUDOCS 8511210085
| document type = DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21), TEXT-SAFETY REPORT
| page count = 1
}}
 
=Text=
{{#Wiki_filter:.-l , ,
Log # TXX-4615 TEXAS UTILITIES GENERATING COMPANY                              File # 10110 SKYWAY TOWER = 400 NORTH 01JVE STREE"F. L.B. 51 e DAILAN. TEXAM 78201 WILLIAM 0, COUNSIL EZEcuTIVE VICE PREstOEse?
Mr. R. P. Denise, Director                                                                  h D Q//{=+,, r, Division of Reactor Safety and Projects U.S. Nuclear Regulatory Commission                                                                        j 'l:
Region IV                                                                                gig / 2B85        /
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 x.s!) ';
 
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NO. 50-446 EQUIPMENT CONDUIT INTERFACE QA FILE: CP-85-39, SDAR-201 I
 
==Dear Mr. Denise:==
 
On September 18, 1985, we verbally notified your Mr. T. F. Westerman of a deficiency involving the installed conduit.to equipment interface which may not be as specified per design documents. We have submitted an interim report logged TX :~4589, dated October 10, 1985.
We are continuir:9 our evaluation and anticipate completion by February 12,
[                    1986.
Very taly yours,
[
W. G. Counsil JCH/grr c-        NRC Region IV (0 + 1 copy)
Director, Inspection and Enforcement (i5 copids)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 0                            s 999                                                                                                                  Q2
                                                                                                                              )(o n n .. - . , - - . _ ,c _
                                  .                                                                                  _.    ..      . .}}

Latest revision as of 01:37, 13 July 2023