#REDIRECT [[TXX-3999, Responds to NRC Re Initial Preoperational Radiation Protection Insp Repts 50-445/83-16 & 50-446/83-10. Detailed Planned Actions to Suppl Present Radiation Protection Staff W/Experienced Personnel Encl]]
| number = ML20196H091
| issue date = 07/06/1983
| title = Responds to NRC Re Initial Preoperational Radiation Protection Insp Repts 50-445/83-16 & 50-446/83-10. Detailed Planned Actions to Suppl Present Radiation Protection Staff W/Experienced Personnel Encl
| author name = Gary R
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| addressee name = Madsen G
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| docket = 05000445, 05000446
| license number =
| contact person =
| case reference number = FOIA-87-669
| document report number = TXX-3999, NUDOCS 8803100076
| title reference date = 06-09-1983
| package number = ML20196H050
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
}}
 
=Text=
{{#Wiki_filter:.
h TENAS UTILITIES GENERATING COMPANY
                                                    .,.. mnss nnse,.i,su - 1, w v.o. .o.
tstt              ts ts *
      ..;  ra . . .a..s.u.
July 6,1983 TXX-3999 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U.S. Nuclear Regulatory Comission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000                Docket Nos.: 50-445 Arlington, TX 76012                                            50-446 COMANCHE PEAK STEAM ELECTRIC STATION RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION INSPECTION REPORT N0.83-16/10 FILE NO.: 10130
 
==Dear Mr. Madsen:==
 
We have reviewed your {{letter dated|date=June 9, 1983|text=letter dated June 9,1983}} on the initial preoperational radiation protection inspection conducted by Messrs.
H. D. Chaney and B. Murray of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for Comanche Peak, Units 1 and 2. As requested, we have detailed our planned actions to supplement the present radiation protection staff with personnel tnat have actual power plant experience.
Prior to unit one fuel load, TUGC0 will augment the present Radiation Protecion Staff with either permanent or contract personnel that meet the ANSI 18.1 criteria and have a minimum of
,                          two years of operating experience at commercial nuclear power
:                            facilities.
l If contract technicians are used, the duration of their assignments will be based upon completion of all power escalation activities and tests or six months onsite. As a minimum, a qualified individual will be onsite, twenty-four hours of the day, seven days a week.
Very truly yours, l
8g 31 g 6 880307 WILLIAM 87-669          PDR                                    ,  .
En 1  urt.s l                            cc:  NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, DC 20555
 
  ~  *
        -bec: R. J. Gary (2)
: 8. R. Clements D. N. Chapman R. L. Ramsey J. C. Kuykendall R. A. Jones J. T. Merritt D. Frankum H. C. Schmidt B. S. Dacko R. G. Tolson R. G. Taylor D. L. Kelley F. B. Shants J. B. George M. R. McBay Teri Smart R. E. Kahler N. S. Reynolds (D&L) p
                                    .---,---..~,-~-u --- - --+}}