ML20065M936: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[BECO-90-148, Forwards Revised Pages 1 & 219 of Proposed Tech Spec Change Submitted on 901108]]
| number = ML20065M936
| issue date = 12/03/1990
| title = Forwards Revised Pages 1 & 219 of Proposed Tech Spec Change Submitted on 901108
| author name = Davis G
| author affiliation = BOSTON EDISON CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000293
| license number =
| contact person =
| document report number = BECO-90-148, NUDOCS 9012110260
| package number = ML20065M940
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:_._      __        . _ _ _ _ . _ _ . . _ . _ _ _ . . .        . - _ -_ . _ _ . _ .              . . . _ _ _ .      _ . _  . - . . _ . . _ _ _ . _
10CFR50.90
              .                                                                          O BOSTON EOISON Pilgrim Nuclear Power Station Rocky Hdi Road Plymouth, Massachusetts o230o 1
George W. Davis sener vice President - Nuc6 ear                                                                December 3, 1990 BECo 90-148 U.S. Nuclear Regulatory Commission Document Control Desk Hashington, D.C. 20555 t
License DPR                                                                                                                    Docket 50-293 t
                                                          -MINOR REVISIONS TO PROPOSED TECHNICAL SPECIFICATION CHANGE CONCERNING FUEL PARAMETERS Boston Edison Company (BECo) submitted a proposed change to Pilgrim Nuclear
* Power Station's (PNPS) Technical Specifications concerning fuel parameters by BECo letter 90-135 dated November 8, 1990.
The attachment to this letter consists of two pages from that submittal revised for clarity. Revision to page 1 deletes the sentence "It shall be administratively controlled by the licensee" from definition "D. Car _t ODeratina limits Reoort". The revision to page 219 deletes "...as amended"                                                                  .
from the end of.section 6.9.A.4.b and substitutes "...(the approved version at the time the reload analyses are performed shall be identified in the Core-Operating Limits Report)".
These page revisions are minor and administrative in nature and are encompassed by the " Determination of No Significant Hazards Considerations" of the November 8, 1990-proposed change. Please substitute the attached pages 1 and 219 in Attachment D of the November 8,1990 letter.
H Attachment PHK/ rec /5137
                        ?9012110260-901203 PDR. ADOCK 0500C293 PDC                                                                l p,-        _,
                        ;P                                                                                                                .
 
i                              BOSTON EDISON C' 4!PANY b.S. Nuclear Regulatory Commission Page 2 i
I cc:            Mr. R. Eaton, Project Manager i                                              Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Mail Stop: 14D1                  .
U. S. Nuclear Regulatory Commission                                                                                                  .
~
1 White Flint North                                                                                                                !
11555 Rockville Pike                                                                                                                -
I                                              Rockville, MD -20852 i
U. S. Nuclear Regulatory Commission                                                                                                  -
Region I 475-Allendale Road King of Prussia, PA 19406 4
Senior NRC Resident Inspector Pilgrim Nuclear Power Station d                                              Mr. Robert H. Hallisey. Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, MA 02111 1
1-8 i
4 3..
l t
i
                        .,0..,...,._.._.._            . ..  . .,m.. ...  . . _  _  . . _ . . , . , . . _      .._, , ,                , , , ,  , . , , , , . . , . _ , _ , _ ,}}

Latest revision as of 19:03, 31 May 2023