NEI 99-04, 2021 Biennial 10 CFR 50.59 Summary Report & Post-Defueling Monitored Storage (Pdms) Safety Analysis Report (SAR) Change Summary Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NEI 99-04, Commitment Revision Summary Report]]
| number = ML22115A019
| issue date = 04/21/2022
| title = 2021 Biennial 10 CFR 50.59 Summary Report & Post-Defueling Monitored Storage (Pdms) Safety Analysis Report (SAR) Change Summary Report
| author name = Van Noordennen G
| author affiliation = TMI-2 Solutions, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000320
| license number = DPR-073
| contact person =
| case reference number = NEI 99-04, TMI2-RA-COR-2022-0011
| document type = Letter type:NEI
| page count = 3
}}
 
=Text=
{{#Wiki_filter:.          ~
TMl-2 SOLUTIONS April 21, 2022 TMl2-RA-COR-2022-0011 10 CFR 50.59(d)(2)
NEI 99-04 TS 6.8.1.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island, Unit 2 (TMl-2)
NRG Possession Only License No. DPR-73 NRC Docket No. 50-320
 
==Subject:==
BIENNIAL 10 CFR 50.59
 
==SUMMARY==
REPORT AND PDMS SAR CHANGE REPORT This letter submits the 2020-2021 Biennial 10 CFR 50.59 Summary Report required by 10 CFR 50.59(d)(2) and Technical Specification (TS) 6.8.1.4.b, and the Post-Defueling Monitored Storage (PDMS) Safety Analysis Report (SAR) change summary report required by TS 6.8.1 .4.a.
The Attachment provides a report containing a brief description of any changes, tests or experiments that required a 50.59 evaluation during the reporting period, and a summary of any changes made to the PDMS SAR during the previous update.
As required by SECY-00-0045 (NEI 99-04) for Three Mile Island Nuclear Station, Unit 2 (TMl-2),
based on a review of commitment tracking documentation, it has been determined that no new commitment changes were processed and implemented in calendar year 2021.
There are no new regulatory commitments contained in this submittal.
                                                                                                                              \
Should you have any questions concerning this letter, please contact Mr. Craig W Smith at (717) 948-8776.
Respectfully,
(; Digitally signed by Gerard van Noordennen Gerard van NO O rd en n eI'',:'_1-'Aff~s,  ,/
                                                \.._ DN: :n=Ger~rd van Noordennen, o=EnergySol~tions, ou=Regulatory ema1l=gpvannoordennen@energysolut1ons.com, c=US Date:2022.04.21 07:59:34 -04'00'
(,,/
Gerard van Noordennen Senior Vice President Regulatory Affairs TM 1-2 Solutions, LLC
 
==Attachment:==
2020-2021 Biennial TMl-2 50.59 Summary Report and PDMS SAR Change Report cc: w/Attachment NRC Regional Administrator, Region I NRG Project Manager, Three Mile Island
 
TMl-2 Service List Ken Robuck                              Director, Bureau of Radiation Protection President and CEO                        Department of Environmental Protection' Energy Solutions                        Commonwealth of Pennsylvania            '
299 South Main Street, Suite 1700        Rachel Carson State Office BLDG.
Salt Lake City, UT 84111                13TH Floor P.O. Box 8469 John Sauger                              Harrisburg, PA 17105-8469 President and Chief Nuclear Officer Chief, Division of Nuclear Safety, Bureau of Reactor D&D Radiation Protection, Energy Solutions Department of Environmental Protection 121 W. Trade Street, Suite 2700 Commonwealth of Pennsylvania            '
Charlotte, NC 28202 Rachael Carson State Office BLDG.
13TH Floor Mike Lackey P.O. BOX 8469 Senior Vice President Harrisburg, PA 17105-8469 D&D Operations Energy Solutions Chairman, Board of County Commissioners 121 W. Trade Street, Suite 2700 Dauphin County                              '
Charlotte, NC 28202 112 Market Street 7th Floor Gerard van Noordennen Harrisburg, PA 17101 Senior Vice President Regulatory Affairs Energy Solutions Chairman, Board of Supervisors of 121 W. Trade Street, Suite 2700 Londonderry Township Charlotte, NC 28202 783 S. Geyers Church Rd.
Middletown, PA 17057 Frank Helin Project Director Trevor Orth TMl-2 Solutions Site Decommissioning Director 121 W. Trade Street, Suite 2700 Three Mile Island Generating Station Charlotte, NC 28202 Route 441 South Middletown, PA 17057 Russ Workman General Counsel Craig W Smith Energy Solutions Site Decommissioning Regulatory Assurance 299 South Main Street, Suite 1700 Lead Salt Lake City, UT 84111 Three Mile Island Generating Station Route 441 South Daniel F. Stenger Middletown, PA 17057 Hogan Lovells US LLP 555 13th St NW Washington, D.C. 20004
 
Attachment
                        -
* 2020-2021 Biennial TMl-2 50.59 Summary Report During the calendar years 2020 to 2021 there were no changes, tests, or experiments meeting the requirements of 10 CFR 50.59 requiring a written evaluation.
PDMS SAR Change Report The PDMS SAR was updated (Update 14) and submitted to the NRC in TMl-2 Solutions letter, TMl2-RA-COR-2021-0012, dated August 10, 2021. PDMS SAR Update 14 revised the PDMS SAR to reflect the current plant configuration, administrative processes, and editorial changes. There have been no changes to the PDMS SAR implemented since the Update 14 submittal.}}

Latest revision as of 09:42, 8 May 2023