ML20078K378: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[PLA-1834, Monthly Operating Rept for Aug 1983]]
| number = ML20078K378
| issue date = 09/08/1983
| title = Monthly Operating Rept for Aug 1983
| author name = Kenyon B, Kuczynski L
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = Beebe M
| addressee affiliation = NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
| docket = 05000387
| license number =
| contact person =
| document report number = PLA-1834, NUDOCS 8310190080
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 5
}}
 
=Text=
{{#Wiki_filter:[                                    AVERAGE DAILY UNIT POWER LEVEL D                    /
50-387 r/)          =....              3                                                        DOCKET NO.
L,                "    ' 2 UNIT One f                                                                                              DATE 09-08-83 hgg gY                                                                        COMPLETED BY        L.A. Kuczynski TELEPHONE      (717)542-2181 MONTH      August, 1983 DAY        AVERAGE DAILY POWER LEVEL                            DAY      AVERAGE DAILY POWER LEVEL (MWe-Net)                                                  (MWe-Net) 3 1034                                g7                      1036 1037                                                          1032 2                                                            18 3                        958                                39                      1030 4                        1032                                20                      1013 3                        1034                                21                      1038 6                        1036                                22                      1031 7                        1033                                23                      1033 8                        1032                                24                      1037 9                        1010                                25                      1031 10                        1044                                26                        1032 33 1636                                27                        1030 32                        1042                                gg                          88 13                        1045                                29                            0 14 1044                                30                            0 15                        1027                                33                            0 16                        1040 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole meswatt.
(9/77) 8310190080 830908 PDR ADOCK 05000387 R                          PDR
 
  ,-        y l  I o    )  $@
d      l    Nv              Y W    /i_  _  _  _l      3 L Cl-          RM l                        OPERATING DATA REPORT DOCKET NO. 50-387 p                                                                                        DATE 09-08-83 h NIC Sif                                                                    COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-2181 OPERATING STATUS Unit 1 Notes
: 1. Unit Name: Susauchanna Steam Electric Station
* Year to date and cumulative
: 2. Reporting Period: Au;ust, 1983                                        values for Item 16 adjusted
: 3. Licensed Thermal Power (MWt):
3293 due to availability of better
: 4. Nameplate Rating (Gross MWe): 1152                                    data for June and July, 1983.
: 5. Design Electrical Rating (Net MWe):    1065
: 6. Maximum Dependable Capacity (Gross MWe):        1068
: 7. Maximum Dependable Capacity (Net MWe):          1032
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Items 6 and 7 may vary month-to-month until sufficient operating data has been gathered.
: 9. Power Level To Which Restricted,If Any (Net MWe): None
: 10. Reasons For Restrictions,If Any:    None
                                                                                                      .t This Month            i r.-to.Date          Cumulative I1. Hours In Reporting Period                              744                  2040                  2040
: 12. Number Of Hours Reactor Was Critical                    650.5                1664.1                1664.1
: 13. Reactor Reserve Shutdown Hours                            0                    156.7                156.7
: 14. Hours Generator On-Line                                650.5                1625.8                1625.8
: 15. Unit Reserve Shutdown Hours                              0                      0                    0 l      16. Gross Thermal Energy Generated (MWH)          2,100,610              *4,554.685              *4.554.685
: 17. Cross Electrical Energy Generated (MWH) 693,580              1,469,790              1,469,790 l
: 18. Net Electrical Energy Generated (MWH)            669,973              1,414.965              1;414.965 l
: 19. Unit Service Factor                                      87.4                      79.7                79.7 l
: 20. Unit Availability Factor                                87.4                      79.7                79.7 l
l      21. Unit Capacity Factor (Using MDC Net)                    87.2                      67.2                67.2 l      22. Unit Capacity Factor (Using DER Net)                    84.6                      65.1                65.1
: 23. Unit Forced Outage Rate                                  12.6                      20.3                20.3
: 24. Shutdowns Scheduled Over Next 6 Mont'h s (Type. Date.and Duration of Each):
l Unit 1/ Unit 2 Tie-in Outage to commence November 15, 1983. Scheduled to i
last 29 days.
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:    September 2, 1983
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast              Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77 )
 
gANN4 yf                                                                                )g M                                UNIT SHUTDOWNS AND POWER REDUCTIONS                        DOCKET NO.      50-387 ef                                                            ppg 0
R                                                                                          UNIT NAME One p                                                                                                                                                                    DATE    09-08-81 4
kic N                                                                REPORT MONT11 August, 1983                      COMPLE D BY T                t z i
e.
                                                                                                                            -    E                              E No.                                                                    Date p.
                                                                                                            .$ E 3g
                                                                                                                      };;  }y5 Y5        Licensee Event 5%
uy          %
Q Cause & Corrective Action to F
                                                                                                            $E        5    j di y      Report #    NU            V Prevent Recurrence S
W 16                                              830828                                          F      93.5      A      3            NA      CC        INSTRU    With the unit at 100% power, scheduled main turbine stop valve testing was being performed. When the last main turbine stop valve opened, an MSIV isolation occurred. A scram followed due to the MSIV's being less than 94%
full open. Spurious actuation of main steam line pressure switches is con-sidered to be the cause of the scram.
One switch was replaced and the switch's operation will be monitored during plant opera t io n .        In addition, pulsation dampeners were installed on the sensing lines to the main steam line pressure switches to reduce susceptibility of the switches to pressure oscillations.
I                                                                                              2                                                  3 F: Forced S: Scheduled Reason:                                          Method:                        4} Exhibit G -Instructions
                                                                                                                                                                                        ~1 A Equipment Failure (Explain)                    1 -Manual                            for Preparation of Data B. Maintenance of Test                            2 Manual Scram.                      Entry Sheets fo Licensee C-Refueling                                      3-Automatic Scram.                    Event Report (LER) File (NUREG-
                                                                                                  'D-Regulatory Restriction                          4-Ot her (Explain)                    0161)
E-Operator Training & License Examination F Administrative                                                                  5 G-Operational Error (Explain)                                                          Exhibit I - Same Source (9/77)                                                                                            Il4)ther (Explain)
 
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 09-08-83 Completed by L.A. Kuczynski  Telephone (717)542-2181 Challenges to Main Steam Safety Relief Valves SRV 'B' automatically actuated to provide pressure control at 7.5 minutes after the August 28 scram. The SRV was open for approximately 3 minutes, during which RPV pressure decreased from 1078 psig to 913 psig. The valve rescated properly.
Changes to the Offsite Dose Calculation Manual None.
Major Changes to Radioactive Water Treatment Systems None.
 
i QM Pennsylvania Power & Light Company Two North Ninth Street
* Allentown, PA 18101
* 215 / 770L5151 Bruce D. Kenyon Vice President-Nucleat Operations 215/770-7502 SEP 121983 Director, Data Autcmation &
Management Information Division Attention: Mr. M. R. Beebe Managenent Information Branch Office of Resource Management U.S. Nuclear Regulatory Ca mission Washington, D.C. 20555 SUSQUEHANNA STEAM ELDCTRIC STATICN NNIHLY OPERATING REPORT - AUGUST 1983 ER 100450                              FIIE 841 PIA-1834                                                                          Docket No. 50-387
 
==Dear Mr. Beebe:==
 
The August 1983 nonthly operating report for Susquehanna SES Unit 1 is attached.
Very truly yours,
      ~
        . D. Kenyon Vice President-Nuclear Operations Attachment cc: Dr.Thcmas E. Murley                                            INPO Records Center Regional Administrator-Region I                                Suite 1500 U.S. Nuclear Regulatory Ccumission                            1100 Circle 75 Parkvay 631 Park Avenue                                                Atlanta, Georgia 30339 King of Prussia, PA 19406 Director                                                      Mr. Thcmas E. Pollog Office of Inspection and Enforcement                          Department of Environmental U.S. Nuclear Regulatory Ccnmission                                    Resources Washington, D.C. 20555                                        Bureau of Radiation Protection Attn: Document Control Desk (12 copies)                        P.O. Box 2063 Harrisburg, PA 17120 Mr. G. Rhoads - IRC Mr. R. Perch - NRC
                                                                                              <}}

Latest revision as of 03:18, 27 September 2022