ML20080H036: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20080H036
| number = ML20080H036
| issue date = 01/31/1995
| issue date = 01/31/1995
| title = Monthly Operating Rept for Jan 1995 for Waterford 3 Ses.W/ 950213 Ltr
| title = Monthly Operating Rept for Jan 1995 for Waterford 3 Ses.W/
| author name = Becker T, Burski R
| author name = Becker T, Burski R
| author affiliation = ENTERGY OPERATIONS, INC.
| author affiliation = ENTERGY OPERATIONS, INC.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = W3F1-95-0020, W3F1-95-20, NUDOCS 9502140379
| document report number = W3F1-95-0020, W3F1-95-20, NUDOCS 9502140379
| title reference date = 02-13-1995
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 7
| page count = 7

Latest revision as of 19:24, 26 September 2022

Monthly Operating Rept for Jan 1995 for Waterford 3 Ses.W/
ML20080H036
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/31/1995
From: Becker T, Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0020, W3F1-95-20, NUDOCS 9502140379
Download: ML20080H036 (7)


Text

,

~; ~ ENTERGY E'E"e """ " ""

, K61orta. LA 70066 Tet 504 739 6774

n. F. surski Deior Nilear Savy VACerford 3 W3F1-95-0020 A4.05 PR February 13, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 '

License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating l statistics for the month of January,1995. This report is submitted per l Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility l Operating License No. NPF-38.

Very truly yours, e

zt R.F. Burski Director Nuclear Safety i

RFB/DFL/ssf i Attachment cc: L.J. Callan (NRC Region IV) l C.P. Patel, NRC-NRR i' R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Resident Inspectors Office 7 ' n c c-

"~ d ..,n

.4 t

9502140379 950131 Mi PDR ADDCK 050003B2 R PDR l

]

  • 1 I

l s

1 i

NRC MONTHLY OPERATING REPORT f

SUMMARY

OF OPERATIONS i WATERFORD 3  ;

JANUARY 1995  :

P

.)

The unit operated at an average reactor power of 99.8% and experienced no shutdowns or significant power reductions during the period. i i

i s

I f

i i

i i

i

}

i f

l i

f i

i t

l

, i

(

, t PRESSURIZER SAFETY VALVE  !

FAILURES AND CHALLENGES .

t WATERFORD 3 .!

During the month of January 1995, there were no pressurizer safety valve failures or challenges.

I i'

F h

'I I

i i

h i

I

OPERATING DATA REPORT DOCKET NUMBER: 50-382  !

UNIT NAME: WATERFORD 3 DATE OF REPORT: FEBRUARY,1995 ,

COMPLETED BY: T.S. BECKER t TELEPHONE: 504-739-6683 j OPERATING STATUS I

1. Reporting Period: January,1995  ;

Gross Hours in Reporting Period: 744

2. Currently Authorized Power Level (MWt): 3390 ,

Maximum Dependable Capacity (Net MWe): 1075 i Design Electrical Rating (Net MWe): 1104

3. Power Level to which Restricted (if any) (Net MWe): N/A
4. Reasons for Restriction (if any): N/A
  • THIS MONTH YR TO DATE CUMULATIVE .
5. Number of Hours Reactorwas Critical l 744.0 744 69,466.8
6. neactor Reserve Shutdown Hours  !
7. Hours Generator was On-line 744.0 744 68,588.3
8. Unit Reserve Shutdown Hours  !
9. Gross Thermal Energy .

Generated (MWH) 2,517,937 2,517,937 226,847,546 '

i

10. Gross Electrical Energy l' Generated (MWH) 838,480 838,480 75,572,940
11. Net Electrical Energy Generated (MWH) 804,313 804,313 72,046,679
12. Reactor Service Factor 100.0 100.0 84.7'
13. Reactor Availability Factor 100.0 100.0 84.7
14. Unit Service Factor 100.0 100.0 83.6 i
15. Unit Availability Factor 100.0 100.0 83.6  !
16. Unit Capacity Factor (using MDC) 100.6 100.6 81.7
17. Unit Capacity Factor (Using DER) 97.9 97.9 79.6
18. Unit Forced Outage Rate 0.0 0.0 3.1

.#4 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: FEBRUARY,1995 i-COMPLETED BY: T.S. BECKER TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Con't)

19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):

N/A

20. If Shutdown at end of report period, estimated date of startup: *
21. Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
22. Hours in Reporting Period 744.0 744.0 82,009.0
23. Unit Forced Outage Hours 0.0 0.0 2,210.2
24. Nameplate Rating (Gross MWe): 1200
25. If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons: N/A t

6 k

t

l l

l AVERAGE DAILY UNIT POWER LEVEL 1 l

DOCKET NUMBER: 50-382  :

UNIT NAME: WATERFORD 3 l DATE OF REPORT: FEBRUARY,1995 COMPLETED BY: T.S. BECKER  ;

TELEPHONE: 504-739-6683 i MONTH JANUARY.1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWe-NET) 1 1084 17 1082 ,

2 1082 18 1083 3 1082 19 1082 4 1082 20 1082 5 1082 21 1082 6 1081 22 1083 7

7 1042 23 1082 8 1080 24 1083 t

9 1084 25 1083

^

10 1083 26 1082 11 1082 27 1081 _

12 1081 28 1082 13 1082 29 1083  !

14 1083 30 1082 15 1083 31 1083 l 16' 1084 1

)

INSTRUCTIONS l l

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. l Compute to the nearest whole megawatt. )

b

' UNIT SHUTDOWNS AND POWER REDUCTIONS -

DOCKET NUMBER: 50-382 4

UNIT NAME: WATERFORD 3 -

DATE OF REPORT: FEBRUARY,1995 COMPLETED BY: T.S. BECKER .

TELEPHONE: .504-739-6683 REPORT FOR JANUARY.1995 j Type Method of Shutting i F = Forced Duration Down the Reactor or Cause, Comments and Number Date - S = Scheduled (Hours) Reason (1) Reducina Power (2) Corrective Actions NONE l

l 1

j 4

(1) REASON (2) METHOD A= Equipment Failure (explain) 1= Manual B= Maintenance or Test 2= Manual Scram C= Refueling 3= - Automatic Scram l D= Regulatory Restriction 4= Continuation from Previous Period i E= Operator Training and 5= Power Reduction .;

License Examination 6= Other(explain)  ;

F= Administrative l G= Operational Error (explain)

H= Other(explain)