ML20080Q582: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[3F0284-11, NPDES Noncompliance Notification Re Rise in Delta T Temp to 3 H Limit of 21.0 F.Epa to Util Questioning Util Actions Encl]]
| number = ML20080Q582
| issue date = 02/20/1984
| title = NPDES Noncompliance Notification Re Rise in Delta T Temp to 3 H Limit of 21.0 F.Epa 840206 Ltr to Util Questioning Util Actions Encl
| author name = Westafer G
| author affiliation = FLORIDA POWER CORP.
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000302
| license number =
| contact person =
| document report number = 3F0284-11, 3F284-11, NUDOCS 8402240121
| document type = NPDES NONCOMPLIANCE NOTIFICATION, TEXT-ENVIRONMENTAL REPORTS
| page count = 3
}}
 
=Text=
{{#Wiki_filter:_-
Cr$$
p M
P.o. . .w. .e. . .r.
February 20, 1984 3F0284-11 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 j                 
 
==Subject:==
Crystal River Unit 3
{                                      Docket No. 50-302 Operating License No. DPR-72 NPDES Permit Reporting to the Environmental Protection Agency
 
==Dear Sir:==
 
Florida Power Corporation hereby submits a copy of a letter from the Environmental Protection Agency concerning the exceeding of the temperature limits as set forth in the NPDES permit. This submittal is made in accor-dance with Crystal River Unit 3 Technical Specifications, Appendix B, Part II, Section 3.2.
If there are any questions concerning this submittal, please contact this office.
Sincerely,
                        ,  fo                          >>
                                                      -j W
G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management
,                  Attachments Westafer(M02)C1-1 I'                cc: Mr. J. P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900                                                                h/6 h
<                          Atlanta, GA 30303 8402240121 840220
                                                                                    ,                      gg/7 PDR ADOCK 05000302                                        /
g                                                        S                PM u-              General Office 320 Tnirty-fourin street soutn . e o. som 14o42. st. Petersburg. Florida 33733 e 813-866-5151
 
f o s re,,
!        5 I
g y                          UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Sa g ,g/'                                                          REGICN IV 345 COURTLAND STREET ATLANT A. GEORGIA 303 6 5 gg            {g j PEF: 4VM-FP Mr. Walter S. Wilgus Vice President, Nuclear Operations Florida Power Corporation P. O. Box 14042 St. Petersburg, Florida                                    33733 Re: Notice of Violation Florida Pown Corporation-Crystal River NPDES Permit No. FL0000159
 
==Dear Mr. Wilgus:==
 
Your letter dated January 5,1984, cancerning non-compliance with this permit, has lef t unanswered several questions.
Your permit limits the rise in temperature (delta T) to a three hour limit of 17.50F and a one hour limit of 21.00F. The temperature rise problem must have been evident before 2000 hours December 26, yet no apparent action was taken for over four hours. Also, delta T dropped after 2200 hours, although cleaning did not start until over two hours later. Finally, the word ' cooling" in paragraph 2, line 4, appears to not belong in the sentence.
Therefore, we request that you provide this office with detailed answers on these questions:
: 1. Why did it take so long to clean the intake screens af ter the excessive rise in temperature was noticed? What actions did Florida Power Corporation take once the problem was noted?
: 2. Why did the rise in temperature drop after 2200 hours but prior to cleaning?
: 3. How should the sentence in paragraph 2 read?
In addition to these answers, please provide specifics on any plans to prevent recurrence of these violations in the future.
Until such time as you achieve cmpliance with all conditions of your NPDES permit, you are considered to be in violation of and subject to enforcement action pursuant to Section 309 of the Clean Water Act.
t
 
1 e Should you require more information or have any questions, please contact Tan Grubbs at 404/881-7428.                                                                                                                  ,
Sincerely yours, i
                      '#/ 2 #/h6S Peter T. McGarry,    P.E., Chief                                                                                                            )
Florida / Mississippi Unit Industrial Operations Section Facilitles Performance Branch i
                                                                                                                                *                    \
l
_ . .                _ _ _ _ . . _ . _ _ _ _ _ _                                                                    . _ _ _ . _ .}}

Latest revision as of 16:41, 26 September 2022