ML20083G291: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[BSEP-84-0025, Monthly Operating Repts for Dec 1983]]
| number = ML20083G291
| issue date = 12/31/1983
| title = Monthly Operating Repts for Dec 1983
| author name = Dietz C, Harrison F
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = Deyoung R
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| docket = 05000324, 05000325
| license number =
| contact person =
| document report number = BSEP-84-0025, BSEP-84-25, NUDOCS 8401110233
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 10
}}
 
=Text=
{{#Wiki_filter:=
APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT 1 DATE 01/04/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 DECEMBER                      1983 I
DAY.          AVG. DAILY POWER LEVEL                                        DAY                AVG.' DAILY POWER LEVEL (MWE-NET)                                                                      (MWE-NET) 1                        753                                                17                                773
      '2                          771                                                18                              ~748 3                        766                                                19                                782 4                        769                                                20                                783 5                        764                                                21                                700 6                        764                                                22                                257
        '7                        768                                                23                                -11 8                      '770                                                24                                -10 9                        744                                                25                                  33 10                          773                                              26                                584
,    11                          766                                                27                                742 12                          767                                                28                                695
,    13                          768                                                29                                783 14                          769                                                30                                794 15                          766                                                31                                791 16                          769 i
8401110233 831231 PDR ADOCK 05000314 R                          pop 9
1.16 - 8 i
        ._,-,_2.,. ___ -    . - _ . . _ . . _ .      _ _ _ . - _ . _ . _ _ . . _ _ _ - . - - . _ _ .      _ - ,_._    .
                                                                                                                            . . . . . . - - . _ - - . . - ~ . . . . . . - .
 
OPERATING DATA REPORT DOCKET NO. 050-0325 DATE                      01/04/84 COMPLETED BY FRANCES HARRISON TELEPHONE                  (919)457-9521 OPERATING STATUS
: 1. UNIT NAME: BRUNSWICK UNIT 1                    i NOTES                                                I
: 2. REPORTING PERIOD: DECEMBER 83                  I                                                      i
: 3. LICENSED THERMAL POWER (MWT): 2436            I                                                      I
: 4. NAMEPLATE RATING (GROSS MWE): 867.0            I                                                      l
: 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I                                                            i
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 1                                                          1
: 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0      -------------------------------
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION IF ANY:
THIS                        YR TO                  CUMUL MONTH                          DATE                ATIVE
: 11. HOURS IN REPORTING PERIOD                  744.00                    8760.00                59521.00
: 12. NUMBER OF HOURS REACTOR CRITICAL            675.06                    2509.61                36397.98
: 13. REACTOR RESERVE SHUTDOWN HRS                    .00                              .00            1647.10
: 14. HOURS GENERATOR ON LINE                    661.72                    2118.50                34088.53 15.' UNIT RESERVE SHUTDOWN HOURS                    .00                              .00                  .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)        1532756.53              4529036.53              68425055.39
: 17. GROSS ELEC. ENERGY GEN. (MWH)            513353.00              1484863.00              22547051.00
: 10. NET ELEC. ENERGY GENERATED (MWH)        498486.00              1388721.00              21613840.00
: 19. UNIT SERVICE FACTOR                          88.94                        24.18                  57.27
: 20. UNIT AVAILABILITY FACTOR                      88.94                        b4.18                  57.27
: 21. UNIT CAP. FACTOR (USING MDC NET)              84.81                        20.07                  45.97
: 22. UNIT CAP. FACTOR (USING DER NET)              81.61                        19.31                  44.23
: 23. UNIT FORCED OUTAGE RATE                      11.06                            6.15                23.12
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
4
  ~ 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST                            ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY                                              ________
COMMERCIAL OPERATION                                            ________
1.16 - 9
 
APPENDIX DOCKET NO.: 050-325 UNIT: Brunswick No. 1 DATE: December 1983 COMPLETED BY:      Frances Harrison OPERATIONS
 
==SUMMARY==
BRUNSWICK UNIT NO. 1 Brunswick Unit No. 1 operated at an 88.94% availability factor for the month of December with an 84.81% capacity factor. There was one off-line outage and one power reduction. Details are in Appendix D, The Unit Shutdowns and Power Reduction Log.
There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.
4 W
N n-      e .. , , , - ,        _ - , , ,
y .-,  ..m._  , , . ,  . , , ,, , , . . , , , , . . ,              ,  ,  , ,_-_ ,_,y,,,,-,.r,c
 
UNIT SilUTDOWNS AND POWER REDUCTIONS                        DOCKET NO- 050-0325 UNIT NAME Brunswick I DATE January 1984 REPORT MGNT11 December 1983 COMPLETED BY Frances Harrison TELEPIIONE (919)457-9521
              .                                              q c      es    $ en 5                                      E No'          Date    1y      '
3.a
                                              !;; 3b g3m Li' $#
Event 5,3      gu b*3' C'"S* A C""'C8i''
Action to oO        m    giy              Repost #      ro u g                    Prevent Recurrence d                                                                      .
83032      831222      F      82L3      A            3      NA                                  Rx scram-EHC malfunction caused Rx pressure increase.
Repaired EHC pressure control system by replacing defective card in EHC
                            ,                                                                        logic cabinet l
I                    2                                                    3                                  4 F: Forced          Reason:                                                Method:                            Exhibit G-Instructicas S: Scheduled        A Equipment Failure (Explain)                            I-Manual                          for Preparation of Data B-Maintenance of Test                                  2 Manual Scram.                    Entry Sheets for Licensee C Refueling                                            3 Automatic Scram.              . Event Report (LER) File (NUPEG.
D Regulatory Restriction                                                                    0161)
E-Operator Training & Ucense Examination                l-Continuatlons i                  -
F-Administrative                                        5-Load Reductions              5 G-Operational Error (Explain)                          (,-O tl.e r                        Exhibit I Same Source 08/77)                  li-Other (Explain)
L    --
 
UNIT SHUTDOWNS AND POWER REDUCTIONS                        IX)CKET NO. 050-0325 UNITNAME Brunswick I DATE January 1984 COMPLETED BY Frances Harrison REPORTMONTil December 1983 TELEPHONE (919) 457-952I
                                    -                                                                            e.
u      E                              E No.
3g        3      yY5          Licensee      Eg        j",                  Cause & Curreceive Date h    Eg          %    2s5          Event        p                                    Action to H
f5        E    j g5 g        Repoet #      mO          g{
* Prevent Recurrence d
e 83034      831228                                        S      00        B        5      NA              ZZ      ZZZZZZ    Reduced power for rod improvement
                                                                                    .e t
I l
l l
l I                                                      2                                                  3                              4 F: Forced                                            Reason:                                            Method:                            Exhibit G-Instructions S: Scheduled                                        A Equipment Failure (Explain)                        l-Manual                          for Preparation of Data B-Maintenance of Test                                2 Manual Scram.                  Entry Sheets for Licensee C-Refueling                                          3 Automatic Scram.
D-Regulatory Restriction                                                          . Event ReporI(LER) File (NUREG-E-Operalor Training & License Examination            4-Continuations -                0161)
F-Administrative                                    5-Load Reductions          5 G-Operational Error (Explain)                        6-Other (4/77)                                                    li-Other(Explain)                                                                      Exhibit !-Same Source
[                                                                                                                                                                                             .
 
APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 01/04/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521
        -DECEMBER              1983 DAY        -AVG. DAILY POWER LEVEL          DAY                            AVG. DAILY POWER LEVEL (MWE-NET).                                                      (MWE-NET) i 1                  -9                              17                              -7
: 2.                  -8                                18                              -8 3                  -9                                19                              -7
                                -9                        . :20                                  -8 14
            '5                  -8                                21                              -8 6                  -8                                22                              -8 7-                  -9                                23                            -10 8'                  -9                                24                            -10
: 9.                  -9                                25                              -8
        ~ 10                    -9                                26                              -8 11                    -8                                27                            -7 zi2                      -8                                28-                            -7'
        -13                      -8                                29                            -8.
        -14                      -9'                                30                            -9
        '15 -                  -8                                  31-                          -8 16                                                                  1.16 -'8
 
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE                01/04/84 COMPLETED BY FRANCES HARRISON TELEPHONE            (919)457-9521 OPERATING STATUS
: 1. UNIT NAME: BRUNSWICK UNIT 2                                              i NOTES                                                              I
: 2. REPORTING PERIOD: DECEMBER 83                                            f                                                                    1 I
: 3.      LICENSED THERMAL POWER (MWT): 2436                                  I I
: 4.      NAMEPLATE RATING (GROSS MWE): 867.0                                I DESIGN ELECTRICAL RATING (NET MWE): 821.0                          l                                                                    l 5.
I
: 6.      MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 1
: 7.      MAX DEPENDABLE CAPACITY (NET MWE): 790.0
: 8.      IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION IF ANY:
THIS                YR TO                        CUMUL MONTH                                    DATE                      ATIVE
: 11. HOURS IN REPORTING PERIOD                              744.00                              8760.00                      71545.00
: 12. NUMBER OF HOURS REACTOR CRITICAL                                          .00            5951.30                      44727.42
: 13. REACTOR RESERVE SHUTDOWN HRS    .
                                                                                      .00                        .00                                  .00
: 14. HOURS GENERATOR ON LINE                                                    .00            5634.73                      41785.47
: 15. UNIT RESERVE SHUTDOWN HOURS                                                .00                      .00                                  .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)                                            .00      12279737.66          78576721.02
: 17. GROSS ELEC. ENERGY GEN. (MWH)                                              .00      4093006.00          26109698.00
: 18. NET ELEC. ENERGY GENERATED (MWH)                    -6080.00                        3935892.00          25027818.00
: 19. UNIT SERVICE FACTOR                                                        .00                64.32                          58.40
: 20. UNIT AVAILABILITY FACTOR                                                  .00                64.32                          58.40
: 21. UNIT CAP. FACTOR (USING MDC NET)                        -1.03                                  56.87                          44.28
: 22. UNIT CAP. FACTOR (USING DER NET)                        -1.00                                  54.73                          42.61
: 23. UNIT FORCED OUTAGE RATE-                                                    .00                10.18                        15.97
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND [CoATION OF EACH):
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 12/22/83
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST                                                    ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY                                                              --------              --------
COMMERCIAL OPERATION 1.16 - 9                                                            _ _ _ _            _ _ _ _ _ _ _ _
 
APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: December 1983 COMPLETED BY: Frances Harrison OPERATIONS
 
==SUMMARY==
 
                                                      . BRUNSWICK UNIT NO. 2                                        l Brunswick Unit No. 2 was shut down for a planned Intergranular Stress Corrosion Cracking outage.
There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.
p l.
 
r 8
UNITSHUTDOWNS AND POWER REDUCTIONS                              DOCKET NO. 050-0324 UNIT NAME Brunswick II DATE January 1984 I                                                                    REPORT MONT11 December 1983                        COMPLETED BY Frances Harrison l                                                                                                                              TELEPHONE (9I9) 457-9521 i
1 I                    .
c        ri    4 e.o S                                E l
l No.              Date      E.
j_y
                                            -o y  7y3
                                                          .c :3 cc cen5 e Event      j'T .,
h  o Cause a Corrective Action to ju ei
                                          $3        5    j5y          Repori #    ,#0                                    Prevent Recurrence 5
83-105            831102        S  693.3    *H      I      NA            XX        ZZZZZZ          Intergranular Stress Corrosion l                                                                                                          . Cracking Outage er I
    ,                                            *Intergranular StressCorgosionCrackingOutage F: Forced                Reason:                                            Method:                                  Exhibit G last:uctions S: Scheduled            A Ecinipment Failure (Explain)                    l-Manual                                  for Preparation of Data B4taintenance of Test                              2 Manual Scram.                          Entry Sheets for Licensee C-Refueling                                        3-Automatic Scram.                  . Event Report (LER) File (NUREG-D Regidatory Restriction                                                                    0161) 4-Continuatlons -
1 E-Operator Training & Ucense Examination F Administrative                                  5-Load Reductions                  5 G-Operational Error (Explain)                    6-Other                                    Exhib3    Same Source 08/77)                      Il-Other (Explain)                                                                                                  -
            .w=mwo -          *  ~-=
_q      ..
W_ _("%
 
l e
CNLL Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 January 4, 1984 FILE: B09-13510C SERIAL: BSEP/84-0025 Mr. R. C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 MONTHLY OPERATING REPORT
 
==Dear Mr. DeYoung:==
 
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of December 1982.,
Very truly yours, C. R. Dietz, Ceneral Manager Brunswick Steam Electric Plant FH/j sa/LETJA Enclosures cc:  Ms. J. C. Baker
_ Mr. S. W. McDowell' Mr. J. P. O'Reilly Mr. S. L. Rosen v
g\
  .      _ .      .    .}}

Latest revision as of 05:18, 26 September 2022