ML20106C703: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[ELV-04037, NPDES Noncompliance Notification:On 920914,water Discharged from Cooling Tower Basin Via Storm Drain to Retention Pond 1 & Alarm Received in Control Room.Caused by out-of-calibr Level Transmitter.Level Transmitter Will Be Repaired]]
| number = ML20106C703
| issue date = 10/01/1992
| title = NPDES Noncompliance Notification:On 920914,water Discharged from Cooling Tower Basin Via Storm Drain to Retention Pond 1 & Alarm Received in Control Room.Caused by out-of-calibr Level Transmitter.Level Transmitter Will Be Repaired
| author name = Mccoy C
| author affiliation = GEORGIA POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000424
| license number =
| contact person =
| document report number = ELV-04037, ELV-4037, NUDOCS 9210060313
| document type = NPDES NONCOMPLIANCE NOTIFICATION, TEXT-ENVIRONMENTAL REPORTS
| page count = 5
}}
 
=Text=
{{#Wiki_filter:}}

Latest revision as of 19:20, 23 September 2022