ENS 56096: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 23: Line 23:
The licensee plans to meet with the vendor representative to discuss recommendations and a path forward. After repairs are completed, shutter tests and radiation surveys will be conducted according to regulatory requirements to ensure that the gauges operate according to design. The licensee shall notify the Department when corrective actions are completed.
The licensee plans to meet with the vendor representative to discuss recommendations and a path forward. After repairs are completed, shutter tests and radiation surveys will be conducted according to regulatory requirements to ensure that the gauges operate according to design. The licensee shall notify the Department when corrective actions are completed.
LA incident no.: LA20220007
LA incident no.: LA20220007
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220915en.html#en56096
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220916en.html#en56096
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Latest revision as of 07:30, 16 September 2022

ENS 56096 +/-
Where
Exxonmobil Baton Rouge Plastics
Baton Rouge, Louisiana (NRC Region 4)
License number: LA-2349-L01, Amendment 40
Organization: La Dept Of Environmental Quality
Reporting
Agreement State
Time - Person (Reporting Time:+18.18 h0.758 days <br />0.108 weeks <br />0.0249 months <br />)
Opened: Russell Clark
14:07 Sep 8, 2022
NRC Officer: Bethany Cecere
Last Updated: Sep 8, 2022
56096 - NRC Website