ENS 56096: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 23: | Line 23: | ||
The licensee plans to meet with the vendor representative to discuss recommendations and a path forward. After repairs are completed, shutter tests and radiation surveys will be conducted according to regulatory requirements to ensure that the gauges operate according to design. The licensee shall notify the Department when corrective actions are completed. | The licensee plans to meet with the vendor representative to discuss recommendations and a path forward. After repairs are completed, shutter tests and radiation surveys will be conducted according to regulatory requirements to ensure that the gauges operate according to design. The licensee shall notify the Department when corrective actions are completed. | ||
LA incident no.: LA20220007 | LA incident no.: LA20220007 | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220916en.html#en56096 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Latest revision as of 07:30, 16 September 2022
Where | |
---|---|
Exxonmobil Baton Rouge Plastics Baton Rouge, Louisiana (NRC Region 4) | |
License number: | LA-2349-L01, Amendment 40 |
Organization: | La Dept Of Environmental Quality |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+18.18 h0.758 days <br />0.108 weeks <br />0.0249 months <br />) | |
Opened: | Russell Clark 14:07 Sep 8, 2022 |
NRC Officer: | Bethany Cecere |
Last Updated: | Sep 8, 2022 |
56096 - NRC Website | |