ML20128B072: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[BSEP-85-0873, Monthly Operating Repts for Apr 1985]]
| number = ML20128B072
| issue date = 04/30/1985
| title = Monthly Operating Repts for Apr 1985
| author name = Dietz C, Harrison F
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = Taylor J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| docket = 05000324, 05000325
| license number =
| contact person =
| document report number = BSEP-85-0873, BSEP-85-873, NUDOCS 8505240399
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 12
}}
 
=Text=
{{#Wiki_filter:-
AfVINDIX 9 AVERAGE DAII.Y POWER LEVEL
* DOCKET NO. 050-0325            l UNIT BRUNSWICK UNIT i DATE 05/03/85 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 APRIL          1985 DAY  AVG. DAILY POWER LEVEL        DAY  AVG. DAILY POWER LEVEL (MWE-NET)                            OiW E-NE T )
1              -9                    47                -7 2              -8                    18                -C 3              -7                    19                -7 4              -8                    20                -c S              -9                    21                -7 6              -9                    22              -7 7              -0                    23                -6 8              -8                    24                -6 9              -0                    ?5                -S 10              ~7                    26                -5 11              -7                    27                -S 12                /                  20                -5 13              -7                    2?                -5 14              -7                    30                -5 iS              -7 16              -7 1.16 -0 8505240399 PDR            950430ADOCK PDR                05000324
                                                                          $Y' q.
J
 
m j**
OPERATING DATA REPORT DOCKET NO. 050-0325 DATE                            05/06/05                  '
COMPLETED BY FRANCES HARRISON TELEPHONE. (919)457-9521
:0PERATING STATUS
[i".LUNIT-NAME: ' BRUNSWICK.UNITLi                                                                                                              'l NOTES                                                          I 2bREPORTING. PERIOD: APRIL                                                                                              05    .                  I                                                              I 3'. : LICENSED THERMAL: POWER (MWT)2 '2436                                                                                                        I                                                              i 4 ~. NAMEPLATE RATING:(GROSS MWE): 867.0                                                                                                          l                                                              1 5.' DESIGN-ELECTRICAL' RATING (NET MWE). 1821 .0 l                                                                                                                                                                l-6... MAX DEPENDABLE CAPACITY-(GROSS MWE): 815.0-l                                                                                                                                                                1 7., MAX DEPENDABLE CAPACITY (NET MWE): 790.0                                                                                                    -------------------------------
8.;IF CHANGES OCCUR IN CAPACITY RATINGS'(ITEMS 3 THRU 7) SINCE LAST: REPORT, GIVE REASONS:
I
            '9. POWER LEVEL'TO'WHICH RESTRICTED IF ANY (NET MWE):                                                                                                                                                                  I 10.= REASONS FOR' RESTRICTION IF ANY:
i THIS                              YR TO                  CUMUL MONTH                                  DATE                ATIVE    I
                                                                                  ~
: 11. HOURS IN REPORTING PERIOD                                                                                                                  719.00                          2079.00                  71184.00
: 12. NUMDER OF HOURS REACTOR CRITICAL                                                                                                                .00                        2079.00                  45500.06
          '3.' REACTOR RESERVE SHUTDOWN HRS                                                                                                                    .00                                    .00            1647.10 Ei 4. HOURS GENERATOR ON LINE                                                                                                                          .00                        2064.45                  42953.20
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                                                                      .00                                    .00                  .00
: 14. GROSS THERMAL ~ ENERGY' GEN. (MWH)                                                                                                              .00                3521596.50                07570793.50          -
117. GROGS _ELEC. ENERGY GEN. (HWH)                                                                                                                    .00                1100426.00                20922523.00 11 0 . NET ELEC. ENERGY GENERATED (MWH)                                                                                                        ~4961.00                  1136794.00                27702577.00
: 19. UNIT SERVICE FACTOR                                                                                                                              .00                              71.71                    60.34
        -20. UNIT AVAILADILITY FACTOR                                                                                                                          .00                                71.71                    60.34
: 21. UNIT CAP. FACTOR .(USING MDC NET)                                                                                                                .07                              49.90                    49.40 22.JUNIT' CAP.-FACTOR (USING DER NET)                                                                                                                .04          -
40;09                    47.54  ,
: 23. UNIT FORCED OUTAGE JATE                                                                                                                          .00                                  2.r1                H20.20  i c24. SliUTDOWNS SCHED. GVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION UF.EACH):
a..
25.-IF SI1UTDOWN AT END OF REPORT PERIOD, ESTIMAlED DA1E OF STAR 1 UP                                                                                                                                  10/31/05
* 126. UNITS IN' TEST STATUS (PRIOR TO COMMERCIAL OPERATION). FORCASI                                                                                                                                    ACHEIVED INITIAL CRITICALITY                                                                                                              --------        --------
INITIAL ELECTRICIlY                                                                                                              --~            - - - - - - -
r COMMERCIAL OPERATION                                                                                                              --- - -        ---~~---
f i.16 - 9
 
jis                                        _
1- 's DOCKET NO.: 050-0325 UNIT: Brunswick 1 DATE: May 1985 COMPLETED BY: Frances Harrison OPERATIONS
 
==SUMMARY==
                                                                                    . BRUNSWICK UNIT 1 Unit 1 was shut.down.on March 29, 1985, for refueling / maintenance outage.
There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel pool.
f
_ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ .____..__.._..__...___._m_  . _ . . _ _ _ . . _ _ _ . . . _ _ _ _ _ _ . . _ _ . _ _ _ _ . _ _ _ _ _ _ __.__ _J
 
4 9s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brurimwick I DATE May 1985 REFORT MONTH April 1985                        COMPLETED BY Frances Harrison TELEPHONE (9I91457-952I I                                            .
_    E                            c
                            -,      {g        3      j E5          Lscensee    jg          *L                . Cause & Currective
        %          Das<    i      3g        4    2i&            Event-    37                                      ^''      '"
f:        5    jgg          Repint a    mO        EO g                      Prevent Recurrence 6
85-006      850329    S      In          C      4        NA            RC      FUELXX    Refueling / Maintenance Outage Progress 1
l l -    t                  2                                                  3                                4 l        F: Fsweed          Reasim-                                            Method:                              Exhibit G. Instructions l        5: Scheduled      A-Equipment Failure (Explain)                      1-Manual                            for Preparation of Data B-Maintenance of Test                              2-Manual Scram.                      Entry Sheets for Licensee l
C-Refueling                                        3-Automatic Scram.                  Event Report (LER) File (NUREG.
D-Regulatory Restriction                                                                Ol6tl E Operator Training & License Examint. con        Is-Continuat. ions F-Adnunistrative                                  5-Load Reductions              5 G-Operational Error (Emplain)                      6-Other                              Exhibit I - Same Source 19/77)                If Other IEmlain)
E
 
b' '- :                  @
s e r, r -
! ., ;                                                s
                            ~
APPENDIX"B
''' '                ~
                                  ' ~                                          '
JAVERAGE. DAILY POWER LEVEL' W        -
                                                                          ~ DOCKET-NO. 050-0324 UNIT BRUNSWICK UNIT ~2 DATE 05/03/85 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521
                                        ~
l-- - ':A P R I L                    i985 L      -- D AY'          AVG. DAILY POWER LEVEL                DAY  AVG. DAILY POWER LEVEL.
L                              .(MWE-NET).                                  (MWE-NET).
1                      514                          17              771
[
        ';2                          -ii-                        18              '768
          .3                        -10                          19              770
                                          -9'                  20                767 j :. ' 4 -
:5                        -- 1 0                      21              776 6                      -11                ,
22                776 7"                      -10                        23              774 0-                      -- 1 1                    24                775 9-                          69                    25              777                  ,
l 10                        515                        26                777 679 Lii'                                                      27              772 12                        747                        20                776 i
        .13                          754                          29              777                      ,
                                                                                                          -l 14                          773                        30                777                    -l 15-                        769 16                          772                                                                    ,
l l
l 1.16 - 8 1
 
Ah            Y.I                          OPERATING-DATA REPORT DOCKET NO. 050-0324 DATE-                         .05/03/85
                                                                        . COMPLETED BY FRANCES-HARRISON TELEPHONE ~ ( 919 ) 457-9521 -
        ' OPERATING" STATUS                                                                                  (
li..f0 NIT'NAMEiIDRUNSWICK UNIT'2                      i NOTES                                                      1
~
2.-REPORTING PERIOD: APRIL            85              i                                                              l
        .3.      LICENSED? THERMAL POWER (MWT)- 2436            l                                                              l 44'NAMEPLATELRATING (GROSS MWE)' 867.0                t                                                              [
5.jDESIGN ELECTRICAL' RATING'(NET MWE): 821.0 t                                                              [
        .6.' MAX DEPENDABLE CAPACITY (GROSS MWE)' 015.0 1                                                                      !
        -7~. MAX DEPENDABLE' CAPACITY (NET MWE)~ 790.0
        ~8.      IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU'7) SINCE LAST REPORT,
              .GIVE REASONS:
                                                                                                                                  ~
9.' POWER-LEVEL TO WHICH RESTRICTED'IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION'IF ANY:
THIS                              YR TO                CUMUL MONTH                                  DATE              ATIVE
: 11. HOURS IN REPORTING' PERIOD                      719.00                          2879.00                _83208.00
: 12. NUMBER OF HOURS REACTOR CRITICAL                547.60                          2450.79                  49828.31
      .13. REACTOR RESERVE SHUTDOWN HRS                        .00                                    . 00                .00
: 14. HOURS GENERATOR ON LINE                          528.92                          2382.19                -46407.26
: 15. UNIT RESERVE SHUTDOWN HOURS                          .00                                    .00                .00
  ' 16.- GROSS THERMAL ENERGY GEN. (MWH)                1228603.42                5566953.78                88677821.09 17.: GROSS ELEC. ENERGY GEN. (MWH)                406395.00                1861928.00                29463632.00 18.. NET ELEC. ENERGY GENERATED (MWH)            392384.00                  1804443.00                28224917.00
      ~19. UNIT SERVICE FACTOR                                73.56                                82.74                  55.77
: 20. UNIT AVAILABILITY FACTOR                          73.56                                82.74                  55.77
: 21. . UNIT CAP. FACTOR.(USING MDC NET)                69.08                                79.34                  42.94.
      '22. UNIT CAP. FACTOR (USING DER NET)                  66.47                                76.34                  41.32
: 23. UNIT FORCED OUTAGE RATE                            26.44                                  8.14                ~15.99
      -24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START.UP:
      .26.. UNITS'IN TEST GTATUS (PRIOR TO COMMERCIAL OPERATION)                                FORCAST.        ACHEIVED INITIAL CRITICALITY                                                      --------        --------
INITIAL ELECTRICITY                                                      --      2----  --------
COMMERCIAL OPERATION                                                    --------        - -- -
1.16 - 9
 
c3
        ~
g.
p . ..
n:
DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: May 1985 COMPLETED BY: Frances Harrison OPERATIONS.
 
==SUMMARY==
 
BRUNSWICK UNIT 2
                              -Brunswick Unit 2 operated at a 73.56 percent availability factor for the month-of April with a 69.08 percent-capacity factor. There was one off-line outage and three power reductions. Details are in Unit Shutdowns and Power Reductions sheet.
                              'There are 608 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2. fuel pool.
                                                                                                                                                                                                                                            -q i
 
4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT N AME Brunswick 2 DATE May 1985 REPORT MONTH April 1985                  COMPLETED BY Frances Harrison"
                          -                                                                                TELEPHONE. (919)457-9521
                                                      -    E                          e
                          -,        [        'b    j5'5        Licensee  5 r,      l4                  Cause & Corrective No .        Date      i      5?          4    255          Event    g7 mO
: o. 3                      Action to
                                    $E        :E    5 e di g Report a            5' u
Prevent Recurrence C
B5-021      850401    F      190.08      A        I    '
NA                            Shutdoun unit: High drywell inleakage due to both recirculation pump discharge valves F031A & B leaking.
n 1                  2                                                3                              4 F: Forced          Reases:                                        Method:                          Exhibit G -Instructions S: Scheduled        A-Equipment Failure (Explain)                  l-Manual                        . for Preparation of Data B-Maintenance of Test                          2 Manual Scram-                  Entry Sheets for Licensee C-Refueling                                    3-Automatic Scram-              Event Report (LER) File (NUREG-D-Regulatory Restriction                                                        01611 E-Operator Training & License Examination      4-Continuations F-Administrative                                5-Load Reductions            3 G-Operational Error (Explain)                  6-Other                          Exhibit I Same Source (9/77)                llother (Explain)
 
UNIT SHUTDOWNS AND POWER REDUCTIONS              /
i
                                                                                                                                          . DOCKET NO. O'50-0324 UNIT NAME Brunswick 2 j'        DATE May 1985 COMPLETED BY Frances Harrinon REPORT MONTH Aoril 1985                          . TELEPHONE (919)457-9521 1                                                    .
                                                                              -      ~
E                          E l                                                            5          'E                  Licensee    Er      E%                    Cause & Corrective
                          %.            Date      -$        5j            k ) {E'$          Event    ($        hU                        . Action to
* jE          5  j if, g        Report e  vi O g                    ' Prevent Recurrence 6
l 85-025      850418          s        00          B        5            NA                        Reduced power for teajor pumo switching.
!                                                                                                                          Adjust 2B heater drain pump packing
.                                                                                                                          and replace crack elbow on 2B l                                                                                                                          condensate boorter pump vent.
l I
l I                        2                                                    3                              4 F: Forced                Reason:                                            Method:                            Exhibit G - Instructitms S: Scheduled            A Equipment Failure (Explain)                        1-Manual                          for Preparation of Data B-Maintenance of Test                              2-Manual Scram-                    Entry Sheets for Licensee C-Refueling                                        3-Automatic Scram-                Event Report (LER) File (NUREG.
D-Regulatory Restriction                                                              0161)
EOperator Training & License Examination            1s-Continuations F-Administrative                                    5-Load Reductions            5 Goperatiocul Error (Explaint                        (,-Other                          Exhibit I - Same Source (9/77)                      Il-Other (E splain t L
 
                                                                                                    -m    ,
1.
_g DOCKET NO.      d50-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS                                      Brunswick 2 UNIT NAME DATE May 1985 April 1985                    COMPLETED BY Frances Harrison REPORT MONTH                                    TELEPHONE        (9IFJ457-952I I                                                                                -
                                                                      =                          -
                                                              -      :                          c
                                    -,        !q        -
j $3        Licensee    h          %                    Cause & Curreceive W            Ilah    i        3?        {    2iE          Even      3,7                                  ^'""'"
* E      t ;f,      Report a  to O        EO                    Preven Recurrence f:                                                g 6
85-023      850413      S      00        B          5      NA                              Routine valve testing rod movement and PT-14.1 (Control Rod Operability).
i I
I                    2                                                3                                4 F: Finced          Reason -                                          Method:                            Exhibit G -Instructions S- Scheduled        A Equipment Failure (Explain)                    l-Manual                          for Preparation of Data B-Maintenance of Test                            2-Manual Scram.                    Entry Sheets for Licensee C-Refueling                                      3-Automatic Scram-                Event Report (LER) File tNUREG-D-Regulatory Restriction                                                            0161)
E4)perator Traming & License Ezarmnatson          is-Continuat. eons F-Admsnistratr e                                  5-Load Reductions              3 Goperational Error (Emplain)                      6-Other                            Exhibit I- Same Source l'8/77)                IlOther IEsplaini
!" ~ -
L
 
                                                                                                                                          .. n u,.  .,
l t
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswiek 2 DATE May 1985                  ,
                                                                                .                        compt.ETED BY Frances Harrianti l
l REPORT MONTH April 1985                          TELEPHONE (919)457-9521 l                                            .
                                                    -    .                            c
[-        ;              IAcasce    [g        j*t                    Cause & Currective
                                                    }: :El
      %          Da        e-      4?        (      E&      Evens      ~. ?        E'?                        Action to l
                          #        j@        5  3dg e
Report e  rA 0        h0 t.,
Present Recurrence i                                                        d l
l  85-026      850420    S        00        B      5          NA                            C strol Rod Operability and TSV Testing.
1 t
l t                    2                                              3                                4 F: Furced            Reas.= -                                        Method:                            Exhibit G-Instructions S- Scheduled        A Equipment Failure (Esplass)                    1-Manual                            for Preparasite of Data
!                          B-Mastenance of Test                            2-Manual Scram-                    Entry Sheets for Licensee
                      . C-Refueling                                      3-Aetumatic Scram.                  Event Report (LER) File tNUREG.
D-Regulatur) Rest:ectam                                                            01611 Eoperstar Trammg & Ixense Esansnatum            4-Continuat. eons F-Adnunstrative                                5-toad Reductions              3
!                          GOperat== t Essur iEmplaml                      6-Gther                            Eshibit I - Same Simrce r8/77)                  II0:her iEsptaan p
 
w C9&L Carolina Power & L6ght Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 284o1-0429 May 6,1985 FILE: B09-13510C SERIAL: BSEP/85-0873 Mr. J. H. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 H0VrilLY OPERATING REPORT Door Mr. Taylor In accordanco with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company horowith submits the report of operating statistics and shutdown experience for the month of April 1985.
Very truly yours, big C. R. Dietz, Conoral Manager Brur.swick Steam Electric Plant Fil/mca HSC/85-0014 Encionuras cci  Mr. H. R. Beobo Dr. J. N. Grace Hr. J. L. l(arness Mr. C. F. IAssitor Hs. D. J. Vicks INPO f
                                                                                      ' t}}

Latest revision as of 01:10, 22 August 2022