ML20132F825: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[U-600186, Deficiency Rept 55-84-23 Re Ruskin Interlocking Blade Fire Dampers.Detailed Review of Results & Corrective Actions in Progress.Addl 30 Days Necessary to Complete Review & Provide Final Rept]]
| number = ML20132F825
| issue date = 07/03/1985
| title = Deficiency Rept 55-84-23 Re Ruskin Interlocking Blade Fire Dampers.Detailed Review of Results & Corrective Actions in Progress.Addl 30 Days Necessary to Complete Review & Provide Final Rept
| author name = Hall D
| author affiliation = ILLINOIS POWER CO.
| addressee name = Keppler J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| docket = 05000461
| license number =
| contact person =
| document report number = 55-84-23, U-600186, NUDOCS 8507190051
| document type = DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21), TEXT-SAFETY REPORT
| page count = 1
}}
 
=Text=
{{#Wiki_filter:4MO U-600186 L14-85 (07-03 ).-L 1A.120 ILLIN0/8 POWER COMPANY CLINTON POWER STATION, P.O. BOX 678. CLINTON, ILLINOIS 61727 Docket No. 50-461-July 3, 1985 Mr. James G. Keppler                                                                              >
Regional Administrator Rebl on III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
 
==Subject:==
Potential 10CFR50.55(e) Deficiency 55-84-23 Ruskin Interlocking Blade Fire Dampers
 
==Dear Mr. Keppler:==
 
In Illinois Power Company letter dated April 4, 1985, (Ref: letter D. P. Hall to J. G. Keppler, U-10265), your office was provided an interim report addressing the status of the subject 10CFR50.55(e) investigation.            It was anticipated at that time that a final report would be provided in approximately ninety days (90).
Sargent & Lundy is currently performing a more detailed review of the results and recommended corrective action for the subject fire dampers. It is anticipated ti at approximately thirty (30) additional days will be necessary to complete this review, determine reportability and provide a final report on the issue.
If you have any questions or comments regarding the status of actions taken on this issue, please contact Illinois Power Company.
Sincerely yours,
                                                  . P. Hall YW Vice President RLC/deg cc:  NRC Resident Office Director - Office of I&E, USNRC, Washington , DC 20555 Illinois Department of Nuclear Safety INPO Records Center 8507190051 85d703                                                .JUL .      5 E8o5 PDR  ADOCK 05000461                                                                                    30 S              PDR                                                                                  g TL50 ?                i}}

Latest revision as of 05:18, 10 August 2022