ML20147C191: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams package | {{Adams package | ||
| number = ML20147C191 | | number = ML20147C191 | ||
| title = Forwards LER | | title = Forwards LER 78-066/03L-0 | ||
| release date = 06/09/2020 | | release date = 06/09/2020 | ||
| package contents = {{Adams package content | | package contents = {{Adams package content | ||
| number = ML20147C207 | | number = ML20147C207 | ||
| issue date = 11/22/1978 | | issue date = 11/22/1978 | ||
| title = | | title = /03L-0 on 781109:suppression Chamber Drywell Vacuum Breakers Were Not Demonstrated Operable W/In Tech Spec Time Limit Due to Personnel Error | ||
| author name = Baxley S | | author name = Baxley S | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. | ||
Line 21: | Line 21: | ||
| number = ML20147C188 | | number = ML20147C188 | ||
| issue date = 11/22/1978 | | issue date = 11/22/1978 | ||
| title = Forwards LER | | title = Forwards LER 78-066/03L-0 | ||
| author name = Manry M | | author name = Manry M | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. |
Latest revision as of 01:52, 26 July 2022
Date released: 06/09/2020 | Download: ML20147C191 |
---|---|
ML20147C207 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 11/22/1978 |
From: | Baxley S GEORGIA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML20147C207 (1) | |
ML20147C188 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 11/22/1978 |
From: | Manry M GEORGIA POWER CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML20147C188 (1) | |