#REDIRECT [[M210053, GE Hitachi Nuclear Energy - Requesting to Extend Request for Additional Information Response Due Date to July 28, 2021]]
{{Adams
| number = ML21110A095
| issue date = 04/19/2021
| title = GE Hitachi Nuclear Energy - Requesting to Extend Request for Additional Information Response Due Date to July 28, 2021
| author name = Feyrer M
| author affiliation = GE Hitachi Nuclear Energy
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000018
| license number = DPR-001
| contact person =
| case reference number = M210053
| document type = Letter
| page count = 1
| project =
| stage = Request
}}
 
=Text=
{{#Wiki_filter:RR3 x;ny
          )                                                                                          GEHitachi      Nuclear  Energy MattJ. Feyrer Site Manager, Vallecitos Nuclear Center 6705Vallecitos  Rd M210053                                                                                              Sunol, CA94586 USA April    19,2021                                                                                    T 9259186018 U.S.      Nuclear                                                                                      Matt.feyrer@ge.com Regulatory      Commission Attn:    Document  Control Desk Washington,      D.C.20555-001
 
==Subject:==
GEHRequest to Extend Request                      for Additional  Information  (RAI)  Response      DueDate    to July  28,2021
 
==References:==
1)NRCLicenseDPR-1, Docket 50-18 2)Letter      GEHVallecitos Nuclear Center      (VNC)  Request  for Alternate    Decommissioning Schedules  for  DPR-1, DR-10, and    TR-1Licenses,    7/10/2015 3)Letter,      J.D. Parrot (NRC) to M.F. Feyrer,    GEHitachi    Request    for Alternate Decommissioning    Schedule for VBWR atVNC Request  -
for Additional    Information, (EPID  L-2017-LLA-0052),  7/15/2020 4)Letter,      M.F. Feyrer Requestingto Extend      Requestfor    Additional    information    Due Date  toApril 28,2021,  8/14/2020 5)MSTEAMS          meeting  between  GEHand      NRC presenting    supplemental      information regarding  thestatus  ofVBWRsamplingand analysis, 3/18/2021 6)Letter,      M.F. Feyrer Supplemental    Information for Request for      Additional    information Response    dueApril  28,2021,    3/22/2021 GEHitachi      Nuclear    Energy,  LLC(GEH)    isrequesting  toextend    theresponse duedate          for theNRC's request      foradditional    information (RAI) related tothealternate    decommissioning      schedule for    theVBWR.
Theinitial    request  for    analternate  decommissioning  schedule    wasmade7/10/2015 (Ref            2)andproposed a VBWRdecommissioning                date ofApril 2041tofacilitate    a single holistic decommissioning        oftheentire VNCsite.
inletter    (Ref3)dated        7/15/2020, theNRCrequested      GEHprovide      additional  information    related tothe structural    integrity ofthe    VBWRtoenable      anindependent      assessment    todetermine      ifthe requested exemption      to10CFR50.82(a)(3)          would present  anundue    risk topublic  health  andsafetyunder @
50.12(a). Upon  reviewing      the n ine R Alsi n that letter,GEH    requested  (Ref    and
: 4) wasauthorized until 4/28/2021      torespond        toallowtime  for extensive  concrete    structure  coresampling,    analysis,    and evaluation. GEHupdated        theNRConthe      status ofthat  effort andprovided    a detailed    plan  on3/18/2021 (Ref      4 & 5).Sampling      wascompleted    on4/8/2021    A response    duedate  of7/28/2021      isbeing    requested inthis      communication      toallow time  toanalyze andevaluate      the sample  results  andtocompose          afinal response      tothe  RAls.
If      youhaveanyquestions        regarding  thismatter, please  contact  meat(925)      918-6018.
Sincerely,    , /
g p4-          --  ~-
              /M V
(/
Matt      Feyrer,Site  Manager Vallecitos    Nuclear    Center cc:NRCRegion          IVAdministrator S.Anderson,  NRCRIV J.D. Parrott,NMSS/DUWP/RDB MJF21-006}}

Revision as of 00:25, 3 March 2022

GE Hitachi Nuclear Energy - Requesting to Extend Request for Additional Information Response Due Date to July 28, 2021
ML21110A095
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 04/19/2021
From: Feyrer M
GE Hitachi Nuclear Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
M210053
Download: ML21110A095 (1)


Text

RR3 x;ny

) GEHitachi Nuclear Energy MattJ. Feyrer Site Manager, Vallecitos Nuclear Center 6705Vallecitos Rd M210053 Sunol, CA94586 USA April 19,2021 T 9259186018 U.S. Nuclear Matt.feyrer@ge.com Regulatory Commission Attn: Document Control Desk Washington, D.C.20555-001

Subject:

GEHRequest to Extend Request for Additional Information (RAI) Response DueDate to July 28,2021

References:

1)NRCLicenseDPR-1, Docket 50-18 2)Letter GEHVallecitos Nuclear Center (VNC) Request for Alternate Decommissioning Schedules for DPR-1, DR-10, and TR-1Licenses, 7/10/2015 3)Letter, J.D. Parrot (NRC) to M.F. Feyrer, GEHitachi Request for Alternate Decommissioning Schedule for VBWR atVNC Request -

for Additional Information, (EPID L-2017-LLA-0052), 7/15/2020 4)Letter, M.F. Feyrer Requestingto Extend Requestfor Additional information Due Date toApril 28,2021, 8/14/2020 5)MSTEAMS meeting between GEHand NRC presenting supplemental information regarding thestatus ofVBWRsamplingand analysis, 3/18/2021 6)Letter, M.F. Feyrer Supplemental Information for Request for Additional information Response dueApril 28,2021, 3/22/2021 GEHitachi Nuclear Energy, LLC(GEH) isrequesting toextend theresponse duedate for theNRC's request foradditional information (RAI) related tothealternate decommissioning schedule for theVBWR.

Theinitial request for analternate decommissioning schedule wasmade7/10/2015 (Ref 2)andproposed a VBWRdecommissioning date ofApril 2041tofacilitate a single holistic decommissioning oftheentire VNCsite.

inletter (Ref3)dated 7/15/2020, theNRCrequested GEHprovide additional information related tothe structural integrity ofthe VBWRtoenable anindependent assessment todetermine ifthe requested exemption to10CFR50.82(a)(3) would present anundue risk topublic health andsafetyunder @

50.12(a). Upon reviewing the n ine R Alsi n that letter,GEH requested (Ref and

4) wasauthorized until 4/28/2021 torespond toallowtime for extensive concrete structure coresampling, analysis, and evaluation. GEHupdated theNRConthe status ofthat effort andprovided a detailed plan on3/18/2021 (Ref 4 & 5).Sampling wascompleted on4/8/2021 A response duedate of7/28/2021 isbeing requested inthis communication toallow time toanalyze andevaluate the sample results andtocompose afinal response tothe RAls.

If youhaveanyquestions regarding thismatter, please contact meat(925) 918-6018.

Sincerely, , /

g p4- -- ~-

/M V

(/

Matt Feyrer,Site Manager Vallecitos Nuclear Center cc:NRCRegion IVAdministrator S.Anderson, NRCRIV J.D. Parrott,NMSS/DUWP/RDB MJF21-006