05000265/LER-1997-006, Forwards LER 97-006-00 Re Cable in Unit 2 Being in Same Fire Area as Fire of Concern Due to Ineffective Implementation of Original Safe Shutdown Analysis.List of Commitments Provided: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000265/LER-1997-006]]
| number = ML20217R318
| issue date = 08/27/1997
| title = Forwards LER 97-006-00 Re Cable in Unit 2 Being in Same Fire Area as Fire of Concern Due to Ineffective Implementation of Original Safe Shutdown Analysis.List of Commitments Provided
| author name = Pearce L
| author affiliation = COMMONWEALTH EDISON CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000265
| license number =
| contact person =
| document report number = LWP-97-088, LWP-97-88, NUDOCS 9709050046
| package number = ML20217R319
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
}}
{{LER
| Title = Forwards LER 97-006-00 Re Cable in Unit 2 Being in Same Fire Area as Fire of Concern Due to Ineffective Implementation of Original Safe Shutdown Analysis.List of Commitments Provided
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000265
| LER year = 2097
| LER number = 6
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:'
              ...m m. nw c.nniia,,on... inn.,,n
    *
* 4 )(l.14l 41110% %et'lltT.!!ii)4 *1 jt li'in
  .'            _ ; i . , a ,o , u c ,, a        .n
              < . .,0. .i ., a o u 4 ;      . .
                , , som ,s , ;; , i LWP-97-088 August 27, 1997 United States Nuclear Regulatory Commission Washington, DC 20555 Attention:              Document Control Desk
 
==Reference:==
Quad Cities Nuclear Power Station Docket Number 50-265, DPR-30, Unit Two Enclosed is Licensee Event Report (LER) 97-006, Revision 00, for Quad Cities Nuclear Power Station.
This report is submitted in accordance with the requirements of the Code of Federal Regulations, Title 10, Part 50.73(a)(2)(v)(A). The licensee shall report any event or condition that could have prevented a Reactor shutdown and maintenance of safe shutdown.
The following commitments are being made by this letter:
: 1.          Engineering will perform a revision to the SSD analysis by 090897 to credit alternate power feeds.
: 2.          Revise QARP 1000-01, " Safe Shutdown Procedure C1," by 091597 to credit alternate power feeds.
: 3.          Review a representative sample of discrepant cables to verify the adequacy of resolution codes by 092997.
h      I 9709050046 970827 PDR      ADOCK 05000265 snianstrE97088                                          ,
i
                \ t na oin i .oup.im
 
LWP-97-088-                          2                    August 27, 1997 If there are any questions or comments concerning this letter, please
            . refer them to Charles Peterson, Regulatory Affairs Manager at 309-654-2241, ext. 3609.
Respectfully, COMMONWEALTH EDISON COMPANY QUAD.CITIESyCLEARPOWERSTATION Li W. Pearce Station Manager LWP/CP/plm Enclosure-cc:    A  B. Beach, Regional- Administrator, Region III R. M. Pulsifer, Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quad Cities W. D. Leech, MidAmerican Energy Company D. C. Tubbs, MidAmerican Energy Company M. E. Wagner, Licensing, Comed F. A. Spangenberg, Regulatory Affairs Manager, Dresden INP0 Records Center i