ML21032A238: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Incorrect 2 year window 2 year 2/2021 2/2017          window for            2/2019                                                  *RFO
* RFO            ISTC-3700              *RFO                                                    *ISTC-3700 Test (SPI
* ISTC-3700 Test                        *ISTC-3700 Test (SPI required)                            required) 8/2019 7/2018
                                                                            *End of ISTC-3700 Grace
* 2012 OM Code                                      per OMN-20 (if adoption                                          applicable)
* Spring refueling outage (RFO), during which ISTC-3700 testing is performed (2/2017).
* IST Program updates to 2012 OM Code after this test (7/2018).
* Next ISTC-3700 test is due 2 years after last ISTC-3700 test (2/2019).
* 10 CFR 50.55a(b)(3)(xi) conditions the existing requirements of ISTC-3700 (states when implementing paragraph ISTC-3700) so the supplemental verification occurs on the same schedule, but may be performed at a different time within the 2 year window for ISTC-3700 testing (i.e. need not be concurrent).
This provides flexibility to conduct local observation and pressure/flow measurement for both the open and close directions.
* The wording for supplemental verification has been present as an ASME-recommended practice in the OM Code for years (as far back as OMa-1988).
* A plant could conduct supplemental verification earlier than IST Program 2012 update, or submit a proposed alternative if additional time is needed to safely perform supplemental verification.}}

Latest revision as of 19:47, 20 January 2022

NRC Visual Representation of Supplemental Valve Position Testing Frequency (50.55a/ISTC-3700)
ML21032A238
Person / Time
Issue date: 02/01/2021
From: Douglas Bollock
NRC/NRR/DRO/IRIB
To:
Douglas Bollock, NRR/DRO/IRIB, 415-6609
References
Download: ML21032A238 (1)


Text

Incorrect 2 year window 2 year 2/2021 2/2017 window for 2/2019 *RFO

  • RFO ISTC-3700 *RFO *ISTC-3700 Test (SPI
  • ISTC-3700 Test *ISTC-3700 Test (SPI required) required) 8/2019 7/2018
  • End of ISTC-3700 Grace
  • 2012 OM Code per OMN-20 (if adoption applicable)
  • Spring refueling outage (RFO), during which ISTC-3700 testing is performed (2/2017).
  • IST Program updates to 2012 OM Code after this test (7/2018).
  • Next ISTC-3700 test is due 2 years after last ISTC-3700 test (2/2019).
  • 10 CFR 50.55a(b)(3)(xi) conditions the existing requirements of ISTC-3700 (states when implementing paragraph ISTC-3700) so the supplemental verification occurs on the same schedule, but may be performed at a different time within the 2 year window for ISTC-3700 testing (i.e. need not be concurrent).

This provides flexibility to conduct local observation and pressure/flow measurement for both the open and close directions.

  • The wording for supplemental verification has been present as an ASME-recommended practice in the OM Code for years (as far back as OMa-1988).
  • A plant could conduct supplemental verification earlier than IST Program 2012 update, or submit a proposed alternative if additional time is needed to safely perform supplemental verification.