{{#Wiki_filter:Dominion Energy Nuclear Connecticut, Inc.
{{#Wiki_filter:}}
5000 Dominion Boulevard, Glen Allen, VA 23060                          Dominion Dominion Energy.com                                                    Energy March 25, 2021 United States Nuclear Regulatory Commission                        Serial No.:  21-080 Attention: Document Control Desk                                    NRA/ENC:    RO Washington, D. C. 20555-0001                                        Docket No.:  50-245 License No.: DPR-21 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 1 DECOMMISSIONING FUNDING STATUS REPORT Pursuant to 10 CFR 50. 75(f)(1) and 10 CFR 50.82(a)(8)(v)-(vii), Dominion Energy Nuclear Connecticut, Inc. (DENG), is providing this report on the status of decommissioning funding for Millstone Power Station Unit 1 (MPS 1). provides the following information for MPS1:
Table I - Decommissioning Funding Status Report for MPS1 Summary Information as of December 31, 2020 Table II - Decommissioning Funding Status Report for MPS1 Annual Cash Flow Analysis Starting January 1, 2021 through End of Decommissioning The following information is provided in support and as part of this filing:
: 1. The escalation of decommissioning costs from the Cost Study's 2019 dollars to 2021 dollars is 2.06% and is based upon the average of CPI-U rates, Bureau of Labor Statistics, FCPIU.US CPI: Consumer Price Index for All Urban Consumers, (Index 1982-84=100, SA) for that period.
: 2. The escalation rate of decommissioning costs, shown in Table II is 0% based on assuming a 2% Real Rate of Return.
: 3. The growth rate on Trust Funds is the allowed 2% Real Rate of Return over the escalation rate.
: 4. No rate regulatory authority citation for MPS1 is referenced because MPS1 is a merchant unit.
: 5. There are no contracts upon which DENG is relying under paragraph 10 CFR 50.75(e)(1 )(v) and there were no modifications to the current method of providing financial assurance since the last submitted report.
 
Serial No.: 21-080 Docket No.: 50-245 MPS1 Decommissioning Trust Fund Status Report Page 2 of 2
: 6. There are no annual funding amounts for MPS1.
: 7. Trust Fund balances shown in this report are market value and after-tax on realized gains and losses. The Trust Fund balances have not been adjusted for unrealized gain or loss positions that are not currently taxable.
: 8. Since the previous annual submittal on March 26, 2020 (Serial No. 20-112, ADAMS Accession No. ML20087M715) for MPS1 there have been no material changes to the Trust agreements established for nuclear decommissioning.
Please contact Mr. Craig D. Sly at (804) 273-2784 if you have any questions or require additional information.
Sincerely, Mark. D. Sartain Vice President - Nuclear Engineering and Fleet Support Dominion Energy Nuclear Connecticut, Inc.
 
==Attachment:==
Decommissioning Funding Status Report for MPS1, Summary Information as of December 31, 2020 Commitments made in this letter: None cc:    U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, Pennsylvania 19406-2713 Ms. Amy Snyder NRG Senior Project Manager - Millstone Power Station, Unit 1 U. S. Nuclear Regulatory Commission Mail Stop T-5A 10 Washington, D.C. 20555-0001
 
Serial No.: 21-080 Docket No.: 50-245 Attachment 1 Decommissioning Funding Status Report for MPS1 Summary Information as of December 31, 2020 Millstone Power Station - Unit 1 Dominion Energy Nuclear Connecticut, Inc. (DENC)
 
Serial No.: 21-080 Docket No.: 50-245 Attachment 1 Page 1 of 3 Table I: Decommissioning Funding Status Report for MPS1 Summary Information as of December 31, 2020 Decommissioning Funding Status Report for MPS1 Summary Information as of December 31, 2020 10 CFR 50.82 (a)(8)(v)-{vii)
(in millions)
Decommissionini:i Trust Fund Balances                                                    10 CFR Reference      l50.82(all8lM(Al    l50.82(a)(8)(VIO(Al Fund Balance                                Type of Trusts                                                        Comments
  $            698.4 Unit 1 qualified fund balance                                          Asof:                    12/31/2020
  $            -      Unit 1 non-qualified fund balance                                  Asof:                      12/31/2020
  $              0.9 Less costs incurred but not vet billed to Trust                      Actual Cost in:              2020            Dollars
  $          697.5 Adiusted decommissionino fund balance                                  As of:                    12/31/2020 Other Financial Assurance Methods Being Relied Upon                                      10 CFR Reference      I50.82(a)(8)(v)(A)    I None Prior Years Decommissioning Expenditures                                                  10 CFR Reference      l50.82(a)(8)(v)(A)    I Total            License Tenn          Spent Fuel Mgmt      Site Restoration                                Comments
  $              3.6 $                0.1 $                3.5 $                -      2020 Cost in:                2020            Dollars
  $            98.9 $                48.8 $                50.1 $                  -      2001-2019 Costin:          As-Spent          Dollars
  $          102.5 $                48.9 $                53.6 $                  -      Total Prior Year in:        As-Snent          Dollars Prior Year Decommissioning Expenditures Variance to Estimated Cost                        10 CFR Reference      Iso.82(a)(8)(v)(B)    I Total            License Term        Spent Fuel Mgmt      Site Restoration                                Comments
$                3.6 $                -    $              -    $                -      Actual Cost in                2020          Dollars
$                5.0 $                -    $              -    $                -      NRC Auth $ in                2020    * <
Dollars    m*c
$              /1.4\ $                -    $              -    $                -
Variance: Underrun to NRC Authorized Expenditures Remaining Decommissioning Estimated Cost                                                  10 CFR Reference    l50.82(a)(8)(v)(B)    J50.B2(a)(8)(vii)(B)
Total            License Term        Spent Fuel Mgmt      Site Restoration                                Comments
$            515.6 $              370.7 $                137.1  $                7.8 Estimate in:                    2021          Dollars Decommissioning Criteria Upon Which the Estimate Is Based                                1o CFR Reference    I50.82(a)(8)(v)(B)    I SAFSTOR Anv Modification To Method of Provldina Financial Assurance                              10 CFR Reference    l50.82(a)(B)(v)(C)    I None Any Material Changes To Trust Agreement Since Previous Report                            10 CFR Reference    I50.82(a){8)(v)(D)    I None Need For Additional Financial Assurance                                                  10 CFR Reference    l50.82(a)(8)(vi)      l50.82(a)(8J(vli)(C)
None          See Annual Cash Flow Analysis in Table II Inputs to Remaining Cost and Funding Analysis                                                                  I                    I 2021          Start vear of Remainina Cost and Fundino analvsis 2.06%          Escalate studv dollars from Studv Year to Start Year of Analvsis usina an averaae of CPI rates 0.00%          Escalation rate              2021          & Bevond 2.00%          Fund arowth rate              2021          & Bevond /Reflects NRC allowed 2% Real Rate of Return)
Proiected annual expenditures - see Annual Cash Flow Analysis in Table II Notes: Table I
: 1) Previous decommissioning expenditures represent the withdrawals from the nuclear decommissioning trusts made by Dominion Energy Nuclear Connecticut, Inc. These expenditures do not include the withdrawals made by the former owners of MPS1.
: 2) Expenditures include withdrawals for spent fuel management, consistent with DENC's previous notices to the NRC, as well as allowed ordinary administrative costs.
: 3) 2018 NRC Authorized expenditures of $5.137 million are based on $5 million (rounded) in 2017 dollars as described in DENC's submittal dated August 22, 2017 (Serial No. 18-289, ADAMS Accession No. ML17240A170).
 
Serial No.: 21-080 Docket No.: 50-245 MPS1 Decommissioning Trust Fund Status Report Page 2 of 3 Table II: Decommissioning Funding Status Report for MPS1 Annual Cash Flow Analysis Starting January 1, 2021 through End of Decommissioning Decommissioning Funding Status Report for MPS1 Annual Cash Flow Analysis Starting January 1, 2021 through End of Decommissioning 10 CFR 50.82 {a)(8)(v)-(vli)
                                                                              /lnmllllonsl
                      ~                      ~                    ~                      ~                    ~                  ~
Beginning              Earnings            Remaining                Remaining            Remaining          Remaining of                    on          License Termination        Spent Fuel Mgmt      Site Restoration        SAFSTOR              of Year              Trust Funds          Expenditures            Expenditures        Expenditures        Expenditures          Year Year            Balance        (Reflects 2% RRoR)      !Reflects 0% Esc)      (Reflects 0% Esc)    (Reflects 0% Escl    !Reflects 0% Esc)      Balance 2021        $            697.5  $              13.9  $                1.0 $                  5.0  $                -  $            6.0    $        705.3 2022        $          705.3    $              14.1  $                1.0 $                  4.4  $                -  $            5.4    $        713.9 2023        $          713.9    $              14.2  $                1.0 $                  5.4  $                -  $            6.4    $        721.7 2024        $          721.7    $              14.4  $                1.0 $                  4.4  $                -  $            5.4    $        730.7 2025        $          730.7                  14.6  $                1.0 $                  4.4  $                -  $            5.4    $        739.8 2026        $          739.8                  14.7  $                1.0 $                  3.7  $                -  $            4.7    $        749.9 2027        $          749.9                  15.0  $                1.0                    3.7  $                -  $            4.7    $        760.1 2028        $          760.1                  15.2  $                1.0  -3/4                3.7  $                -  $            4.7    $        770.6 2029        $          770.6                  15.4  $                1.0 $                  3.7  $                -  $            4.7    $        781.3 2030        $          781.3  $              15.6  $                1.0 $                  3.7  $                -  $            4.7    $      792.1 2031        $          792.1  $              15.8  $                1.0 $                  3.7  $                -  $            4.7    $      803.2 2032        $          803.2  $              16.0  $                1.0 $                  3.7  $                -  $            4.7    $      814.5 2033        $          814.5                  16.2  $                1.0 $                  3.7  $                -  $            4.7    $      826.0 2034        $          826.0                  16.3  $                1.6 $                  22.6  $                - $            24.2    $      818.2 2035        $          818.2                  16.1  $                1.6 $                  22.1  $                - $            23.7    $      810.6 2036        $          810.6                  16.1  $                    - $                11.8  $                - $            11.8    $      815.0 2037        $          815.0  $              16.2  $                    - $                10.9  $                  - $            10.9    $      820.3 2038        $          820.3  $              16.3  $                    - $                10.2  $                -  $            10.2  $        826.4 2039        $          826.4  $              16.5  $                0.7 $                  0.9  $                -  $              1.6  $        841.3 2040        $          841.3  $              16.8  $                0.7 $                  0.9  $                -  $              1.6  $        856.5 2041        $          856.5  $              17.1  $                0.7 $                  0.9  $                -  $              1.6  $        872.0 2042        $          872.0  $              17.4  $                0.7 $                  0.9  $                -  $              1.6  $        887.8 2043        $          887.8  $              17.7  $                0.7 $                  0.9  $                -  $              1.6  $        903.9 2044 2045 2046 2047 2048 Sl Sl 903.9 920.3 931.9 929.3 888.1 18.1 18.3 18.4 18.0 17.2 0.7 $
5.9 $
21.1 $
59.1 $
59.9 $
o.~*
0.9
                                                                                                                                $              1.6 6.7 21.1 59.1 59.9 920.3 931.9 929.3 888.1 845.4 2049        $            845.4  $              16.2  $              71.7 $                      -  $            0.1 $              71.8    $        789.8 2050        $            789.8  $              15.3  $              50.5 $                      -  $            0.9 $              51.4    $        753.6 2051        $            753.6  $              14.7  $              30.4 $                      -  $            2.3 $              32.7    $        735.7 2052        $            735.7  $              14.5  $              23.8 $                      -  $            2.5 $              26.3    $        723.8 2053        $            723.8  $              14.3  $              16.4 $                      -  $            1.5 $              17.9    $        720.3 2054        $            720.3  $              14.4  $              4.3 $                      -  $            0.5 $                4.8  $        729.8 2055        $            729.8  $              14.6  $              1.6 $                      -  $            0.1 $                1.7  $        742.7 2056        $            742.7  $              14.9  $                  - $                      - $                - $                -  $        757.6 2057        $            757.6  $              15.2  $                  -  $                    - $                - $                -  $        772.7 2058        $            772.7  $              15.5  $                  -  $                    - $                - $                -  $        788.2 2059        $            788.2  $              15.8  $                    - $                    - $                - $                -  $        804.0 2060        $            804.0  $              16.1  $                  - $                      - $                - $                -  $        820.0 2061        $            820.0  $              16.4  $                    - $                    - $                - $                -  $        836.4 2062        $            836.4  $              16.7  $                  -  $                    - $                - $                -  $        853.2 2063        $            853.2  $              17.1  $                  -  $                    - $                - $                -  $        870.2 2064        $            870.2  $              17.4  $                  - $                      - $                - $                -  $        887.6 2065        $            887.6  $              17.8  $                  -  $                    - $                - $                -  $        905.4 2066        $            905.4  $              18.1  $                  -  $                    - $                - $                -  $        923.5 2067        $            923.5  $              18.5  $                  -  $                    - $                - $                -  $        942.0 2068        $            942.0  $              18.8  $                  -  $                    - $                - $                -  $        960.8 2069        $            960.8  $              19.2  $                  -  $                    - $                - $                - I Sl      980.0 2070        $            980.0  $              19.5  $                5.5    $                    - $                - $              5.5 $          994.1 Remaining $ in          2021          Dollars                $              370.7 $                137.1  $              7.8 $            515.6 Est. Fund Balance (end of Decommissioning) (in Future$ escalated at 0.0% & 2.0% Real Rate of Return Fund Growth Rate)                                $        994.1 Est. Fund Balance (end of Decommissioning) discounted to              2021          Dollars                    Discount Rate= 2.00%                  $        376.7
 
Serial No.: 21-080 Docket No.: 50-245 MPS1 Decommissioning Trust Fund Status Report Page 3 of 3 Table II Definitions:
Column 1:      Beginning of Year Balance:
Reflects the beginning-of-year Trust Fund balance at a 0.0% cost escalation rate and a 2.0% Real Rate of Return (RRoR) on fund growth.
Column 2:      Earnings on Trust Funds:
Reflects earnings on funds remaining in the trust. A 2.0% RRoR Fund growth rate is used for 2021 through 2070 which reflects the allowed 2.0% RRoR over a 0.0%
cost escalation rate. The annual 2.0% RRoR earnings are calculated on the beginning balance less 50% of the projected annual expenditure for each year.
Column 3:      Remaining License Termination Expenditures:
Reflects the annual License Termination Plan cost portion at a 0.0% escalation rate from the Site Specific Estimate.
Column 4:      Remaining Spent Fuel Management Expenditures:
Reflects the annual Irradiated Fuel Management Plan cost portion at a 0.0%
escalation rate from the Site Specific Estimate. This column provides funding information for managing irradiated fuel as required by 10 CFR 50.82(a)(8)(vii).
Column 5:      Remaining Site Restoration Expenditures:
Reflects the annual Site Restoration Plan cost portion at a 0.0% escalation rate from the Site Specific Estimate.
Column 6:      Remaining SAFSTOR Expenditures:
Reflects the annual SAFSTOR Decommissioning Plan cost at a 0.0% escalation rate from the Site Specific Cost Estimate.
Column 7:      End of Year Balance:
Reflects the end of year Trust Fund balance after projected earnings are added and projected expenditures are deducted for the year specified at a 0.0%
escalation rate and a 2.0% RRoR on fund growth.
Tables I and II General Notes: (Any minor differences in totals are due to rounding.)
: 1) Trust Fund balance reflects market value on December 31, 2020, net of taxes on realized gains and losses.
: 2) The 2.0% RRoR is based on the rate allowed by 10 CFR 50.75(e)(1)(i) and 10 CFR 50.82(a)(8)(vi).
: 3) The funding method for providing financial assurance for decommissioning MPS1 remains prepayment. The cash flow analysis in Table II demonstrates that the amounts accumulated in the Trust are sufficient, with credited earnings at a 2.0% RRoR, to cover the estimated cost of radiological decommissioning, spent fuel management and site restoration.}}