VR-SECY-18-0055, Proposed Rule: Regulatory Improvements for Production and Utilization Facilities Transitioning to Decommissioning (Rin 3150-AJ59): Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:}} | ||
Revision as of 17:52, 16 January 2022
ML21307A084 | |
Person / Time | |
---|---|
Issue date: | 11/03/2021 |
From: | Annette Vietti-Cook NRC/SECY |
To: | |
Shared Package | |
ML21229A254 | List: |
References | |
SECY-18-0055, SRM-SECY-18-0055 VR-SECY-18-0055 | |
Download: ML21307A084 (2) | |