{{#Wiki_filter:January 11, 2022 EA-21-109 Mr. Michael Yox Regulatory Affairs Director Southern Nuclear Operating Company 7825 River Road, BIN 63031 Waynesboro, GA 30830
{{#Wiki_filter:}}
 
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 - ASSESSMENT FOLLOW-UP LETTER FOR INSPECTION REPORT 05200025/2021011
 
==Dear Mr. Yox:==
 
This letter notifies you that the two White findings documented in the Nuclear Regulatory Commission (NRC) Inspection Report 05200025/2021011 (Agency Document and Management System (ADAMS) Accession No.ML21312A412) will remain open and that the performance at Vogtle Unit 3 will remain in the Regulatory Response Column of the Construction Action Matrix (CAM) because the supplemental inspection has not been conducted. These findings were identified during a special inspection conducted from June 21 to July 2, 2021 (Inspection Report No. 05200025/2021010 and 05200026/2021010, ADAMS Accession No. ML21236A057). As of January 1, 2022, the findings have been open for more than two quarters.
On November 17, 2021, the NRC issued the final significance determination and assessment follow-up letter for the two White findings in inspection report 05200025/2021011. In this letter, the NRC notified you that, in accordance with IMC 2505, Periodic Assessment of Construction Inspection Program Results, the performance at Vogtle Unit 3 was in the Regulatory Response Column of the Construction Action Matrix beginning in the third quarter of 2021. This letter also notified you that the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 90001, Construction Regulatory Response Column Inspections.
This IP is conducted to verify that the root and contributing causes for the performance issues are understood, the extent of condition and extent of cause are identified, and the corrective actions are sufficient to address the root and contributing causes and to preclude repetition.
Per conversation with your staff on January 10, the NRC plans to conduct the supplemental inspection in the first calendar quarter of 2022. Should anything change regarding scheduling the supplemental inspection, we request that you notify us. In accordance with IMC 2505, the two White findings will not be closed until a supplemental inspection has been successfully completed. The CAM column will not be changed until the issuance of the associated inspection report (or other agency action), and an assessment follow-up letter noting the change in column. However, the findings will still be considered in the CAM for the remainder of the quarter. This letter supplements, but does not supersede, the annual assessment letter issued on March 3, 2021, (ADAMS Accession No. ML21061A216).
 
M. Yox                                        2 In accordance with 10 CFR 2.390 of the NRCs, Rules of Practice, a copy of this letter, its enclosures, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction.
Sincerely,
                                                /RA/
Marissa Bailey, Director Division of Construction Oversight Docket No. 05200025 License Nos. NPF-91
 
M. Yox                              3 cc:
Resident Manager                      Resident Inspector Oglethorpe Power Corporation          Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant        8805 River Road 7821 River Road                      Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General        Team Leader 40 Capitol Square, SW                Environmental Radiation Program Atlanta, GA 30334                    Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company    4244 International Parkway, Suite 120 Document Control Coordinator          Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243                  Brian H. Whitley Regulatory Affairs Director Anne F. Appleby                      Southern Nuclear Operating Company Olgethorpe Power Corporation          3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place              Birmingham, AL 35243 Tucker, GA 30084 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Michael Yox Site Regulatory Affairs Director Vogtle Units 3 & 4 7825 River Road, Building 302 (ESB)
Bin 6031 Waynesboro, GA 30830
 
M. Yox                                    4 Email aagibson@southernco.com (Amanda Gibson) acchambe@southernco.com (Amy Chamberlian) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) corletmm@westinghouse.com (Michael M. Corletti) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dlfulton@southernco.com (Dale Fulton) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David)
G2NDRMDC@southernco.com (SNC Document Control)
George.Taylor@opc.com (George Taylor) harperzs@westinghouse.com (Zachary S. Harper) james1.beard@ge.com (James Beard)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price) mphumphr@southernco.com(Mark Humphrey)
MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) ppsena@southernco.com (Peter Sena,III) r.joshi15@comcast.net (Ravi Joshi) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sjackson@meagpower.org (Steven Jackson) sjones@psc.state.ga.us (Shemetha Jones) skauffman@mpr.com (Storm Kauffman) slieghty@southernco.com (Steve Leighty) sroetger@psc.state.ga.us (Steve Roetger) syagee@southernco.com (Stephanie Agee)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn)
 
M. Yox                                  5 wayne.marquino@gmail.com (Wayne Marquino)
William.Birge@hq.doe.gov(William Birge)
X2edgran@southernco.com (Eddie R. Grant)
X2hagge@southern.com (Neil Haggerty)
X2wwill@southernco.com (Daniel Williamson)
 
ML22011A275 OFFICE        RII/DCO    RII/DCO        RII/DCO          RII/DCO NAME          B. Davis    N. Coovert    O. Lopez-Santiago M. Bailey DATE          01/06/2022  01/06/2022    01/06/2022        01/11/2022}}

Revision as of 12:09, 16 January 2022

Assessment Follow-Up Letter for Inspection Report 05200025/2021011
ML22011A275
Person / Time
Site: 05000025
Issue date: 01/11/2022
From: Marissa Bailey
NRC/RGN-II
To: Yox M
Southern Nuclear Operating Co
References
EA-21-109, IR 2021011
Download: ML22011A275 (6)


Text