NUREG-1184, Forwards Draft Isap Rept (NUREG-1184) for Facility,Including Review of Probabilistic Safety Study,Operating Experience, Topic Evaluations & Util Topic Priority Scoring.Rept Provided Prior to Presentation Before Committee.W/O Encl: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NUREG-1184, Submits Comments on Isap,Discussed During 327th Meeting of ACRS on 870709-11.Recommends Extension of Isap Process to Other Plants.Listed Points Need Further Consideration]]
| number = ML20206J095
| issue date = 04/02/1987
| title = Forwards Draft Isap Rept (NUREG-1184) for Facility,Including Review of Probabilistic Safety Study,Operating Experience, Topic Evaluations & Util Topic Priority Scoring.Rept Provided Prior to Presentation Before Committee.W/O Encl
| author name = Thomas C
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee name = Fraley R
| addressee affiliation = NRC ADVISORY COMMITTEE ON REACTOR SAFEGUARDS (ACRS)
| docket = 05000245
| license number =
| contact person =
| case reference number = RTR-NUREG-1184
| document report number = NUDOCS 8704160017
| document type = CORRESPONDENCE-LETTERS, INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE, NRC TO ACRS
| page count = 2
}}
 
=Text=
{{#Wiki_filter:._                        .  ._ -                _                        _                            _
April 2, 1987 1
                                                                                  ~
Distributiops                                              l Docket File m          'ISAPD Reading                      i NRC/ Local PDR            MLBoyle                        i Docket No.: 50-245                        PAnderson                  CThomas MEMORANDUM FOR:              R. F. Fraley, Executive Director Advisory Committee on Reactor Safeguards FROM:                        C. O. Thomas, Director
!                                          Integrated Safety Assessment
!                                            Project Directorate Division of PWR Licensing-B
 
==SUBJECT:==
DRAFT INTEGRATED SAFETY ASSESSMENT REPORT (NUREG-1184)
MILLSTONE NUCLEAR POWER STATION, UNIT N0. 1 l            Enclosed are copies of the draft Integrated Safety Assessment Report for Millstone Unit 1 completed under the Integrated Safety Assessment Program.
The draft report includes our review of the Millstone 1 Probabilistic Safety Study, plant operating experience, topic evaluations, and NNEC0's topic priority scoring. We are providing this report for your review in anticipation of our presenting the program results before this committee.
,            Please contact R. Hernan, NRR/TOSB to schedule the presentation.
(Original signed by FMAkstulewicz for)
C. O. Thomas, Director i
Integrated Safety Assessment Project Directorate Division of PWR Licensing-B i           
 
==Enclosures:==
 
As stated ISAP: h\          T B                  ISAP:      g
'            MLBoyle:h jch      RH [ nan CThomas 04/L/87                  /    87          04/y/87 J
8704160017 870402 5 DR ADOCK 0500
 
a ;                              _    ,  n    ......1  c a nzm 1%,                          UNITED STATES
((]')
7;      , :j g              NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20S55 April 2,1987
      % [+    o ,/
Docket No.: 50-245 MEMORANDUM FOR:      R. F. Fraley, Executive Director Advisory Committee on Reactor Safeguards FROM:                C. O. Thomas, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing-B
 
==SUBJECT:==
DRAFT INTEGRATED SAFETY ASSESSMENT REPORT (NUREG-1184)
MILLSTONE NUCLEAR POWER STATION, UNIT N0. 1 Enclosed are copies of the draft Integrated Safety Assessment Report for Millstone Unit I completed under the Integrated Safety Assessment Program.
The draft report includes our review of the Millstone 1 Probabilistic Safety Study, plant operating experience, topic evaluations, and NNEC0's topic priority scoring. We are providing this report for your review in anticipation of our presenting the program results before this committee.
Please contact R. Hernan, NRR/TOSB to schedule the presentation.
ace            o C. O. Thomas, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing-B    l
 
==Enclosures:==
 
As stated}}

Latest revision as of 17:52, 17 December 2021