ML20135F069: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20135F069 | | number = ML20135F069 | ||
| issue date = 09/16/1985 | | issue date = 09/16/1985 | ||
| title = Ack Receipt of | | title = Ack Receipt of Informing NRC of Steps Taken to Correct Nonconformance Noted in QA Program Insp Rept 99900513/85-01 | ||
| author name = Zech G | | author name = Zech G | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) | ||
| Line 12: | Line 12: | ||
| case reference number = REF-QA-99900513 | | case reference number = REF-QA-99900513 | ||
| document report number = NUDOCS 8509170140 | | document report number = NUDOCS 8509170140 | ||
| title reference date = 08-14-1985 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO ENGINEERING/CONSTRUCTION/CONSULTING FIRM, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO ENGINEERING/CONSTRUCTION/CONSULTING FIRM, OUTGOING CORRESPONDENCE | ||
| page count = 1 | | page count = 1 | ||
| Line 18: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:September 16, 1985 Docket No. 99900513/85-01 Teledyne Engineering Services ATTN: Mr. F. C. Bailey President 130 Second Avenue Walthan, Massachusetts 02254 Gentlemen: | {{#Wiki_filter:September 16, 1985 Docket No. 99900513/85-01 Teledyne Engineering Services ATTN: Mr. F. C. Bailey President 130 Second Avenue Walthan, Massachusetts 02254 Gentlemen: | ||
Thank you for your letter of August 14, 1985, in response to our letter dated July 11, 1985. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Nonconformance. We will review the implementation of your corrective actions during a future inspection | Thank you for your letter of August 14, 1985, in response to our {{letter dated|date=July 11, 1985|text=letter dated July 11, 1985}}. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Nonconformance. We will review the implementation of your corrective actions during a future inspection | ||
-to determine that full compliance has been achieved and will be maintained. | -to determine that full compliance has been achieved and will be maintained. | ||
Sincerely, ORIGINAL S G iLD BY: | Sincerely, ORIGINAL S G iLD BY: | ||
Revision as of 05:25, 14 December 2021
| ML20135F069 | |
| Person / Time | |
|---|---|
| Issue date: | 09/16/1985 |
| From: | Zech G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Bailey F TELEDYNE ENGINEERING SERVICES |
| References | |
| REF-QA-99900513 NUDOCS 8509170140 | |
| Download: ML20135F069 (1) | |
Text
September 16, 1985 Docket No. 99900513/85-01 Teledyne Engineering Services ATTN: Mr. F. C. Bailey President 130 Second Avenue Walthan, Massachusetts 02254 Gentlemen:
Thank you for your letter of August 14, 1985, in response to our letter dated July 11, 1985. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Nonconformance. We will review the implementation of your corrective actions during a future inspection
-to determine that full compliance has been achieved and will be maintained.
Sincerely, ORIGINAL S G iLD BY:
GARY G. ZECH Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement-DISTRIBUTION:
AIMB:IE:09 VPB Reading DQAVT Reading JWCraig RMcIntyre VPB:DQAVT Uh y YC7VPB:DQAVT PB:DQAVT RMcJntyre: sam (JWCraig GGZech 9/3 /85 9/(\ /85 9/p/85 8509170140 850916 PDR GA999 EMVTELEE / g&
99900513 PDR
._ ;