ML20149M793: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[B12206, Forwards Core Xiv Startup Physics Test Rept,Jul 1986. Rept Details Startup Physics Testing Conducted During May & June.Results of Addl Testing Re Three Loop Operation Will Be Submitted on or Before 861001]]
| number = ML20149M793
| issue date = 08/07/1986
| title = Forwards Core Xiv Startup Physics Test Rept,Jul 1986. Rept Details Startup Physics Testing Conducted During May & June.Results of Addl Testing Re Three Loop Operation Will Be Submitted on or Before 861001
| author name = Opeka J
| author affiliation = CONNECTICUT YANKEE ATOMIC POWER CO.
| addressee name = Murley T
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000213
| license number =
| contact person =
| document report number = B12206, NUDOCS 8802290084
| package number = ML20149M795
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
}}
 
=Text=
{{#Wiki_filter:m
/;
  .              c CONNECTICUT YANKEE ATOMIC POWER COMPANY B E R L I N. CONNECTICUT P o Box 270  HARTFoRo, CONNECT 6 CUT 06H1-0270 1titPHowt 203-665-5000 August 7,1936 Docket No. 50-213 812206 Dr. Thomas E. Murley Regional Administrator Region !
U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Gentlemen:
Haddam Neck Plant Core 14 Startup Physics Test Report Submittal in accordance with Section 6.9.1.a.(4) of the Technical Speclilcations for the Haddam Neck Plant, Connecticut Yankee Atomic Power Company hereby submits the attached Startup Physics Report which details the results of startup physics testing condutad during the months of May and June at the Haddam Neck Plant. As described in the Introduction Section of the attached report, the results of additional testing with regards to three loop operation \ll will be submitted on or before October 1,1936.
Should you have any questions regarding this information, please contact us.
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY 5.0dn*
: 3. F. Opekd Senior Vice President cc      Mr. Christopher 1. Grimes, Director lategrated Safety Assessment Project Directorate Division of PWR Licensing - B U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (1)    A Licensee Event Report providing the appropriate background for this issue will be submitted on or before August 11,1956.
sseomoosV                                                                #      9
                                                                                            %                >}}

Latest revision as of 11:35, 11 December 2021