PNO-III-89-016A, on 890306,Unit 1 Returned to Operation Following Reactor Scram on 890302.Unit 2 Remained in Operation & Unit 2 Station Auxiliary Transformer,Which Failed on 890302,repaired & Returned to Svc: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[PNO-III-89-016, on 890303,Unit 1 Reactor Scrammed from 86% Power as Result of Turbine Trip,Which Appeared to Be Related to Fault in Unit 2 Sys Auxiliary Transformer. Unit 1 Expected to Remain Shut Down for Three Days]]
| number = ML20235Y706
| issue date = 03/06/1989
| title = PNO-III-89-016A:on 890306,Unit 1 Returned to Operation Following Reactor Scram on 890302.Unit 2 Remained in Operation & Unit 2 Station Auxiliary Transformer,Which Failed on 890302,repaired & Returned to Svc
| author name = Forney W, Harrison J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name =
| addressee affiliation =
| docket = 05000373, 05000374
| license number =
| contact person =
| document report number = PNO-III-89-016A, PNO-III-89-16A, NUDOCS 8903140511
| document type = PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO,, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
{{#Wiki_filter:kINARYNOTIFICATIONOFEVENTORU SUAL 0 CURRENCE PHO II-89-16A M e March 6, 1989 k This' preliminary notification constitutes' EARLY. notice of events of POSSIBLE safety or public interest significance. The information is as initially
    ! received without' verification or evaluation,.and is basically.all that is djd known'by the Region III staff on this date.
t Facility: Commonwealth Edison Co.      Licensee Emergency LaSalle Units 1 & 2            Classification:
Marsellies, IL 61341          X Unusual Event Alert Docket No. 50-373;                Site Area Emergency 50-374                General Emergency Not Applicable
 
==Subject:==
UNIT 1 REACTOR SCRAM RELATED TO UNIT 2 TRANSFORMER FAULT-----UPDATE
' Unit I returned to operation on March 6, 1989, following the reactor scram which occurred March 2, 1989. Unit 2 had remained in operation and the Unit 2 Station Auxiliary
      -Transformer, which failed on March 2, was repaired and returned to service.
i The NRC Augmented Inspection Team (AIT) completed its review of the event at 8 p.m. on March 4, 1989, and on March 5 the Regional Administrator concurred in the licensee's decision to restart the reactor.
The initiating event was determined to be the loss of the Unit 2 Station Auxiliary Transformer as a result of the failure of a lightning arrester. The arrester failure was
      'not weather-related; the device has been sent off-site for evaluation. A Unit 1 phase differential relay sensed the resulting undervoltage condition and responded more quickly than normal, causing the Unit 1 turbine trip and reactor scram. The quicker response was--
caused by drifting of the relay's set point.
The AIT determined that the low or under voltage conditions during the transfer of power      -
sources on both units caused other equipment responses including the loss of the station air compressors, the process computer for both units, actuation of isolation valves on the reactor water cleanup system._ locking up of Unit 2 recirculation flow control valves and the feedwater regulating valve, and the tripping of a Unit-2 reactor protection system alternate power supply breaker. The reported drifting of the set points on Static-0-Ring switches did
    .not contribute to the events.
RegionIII(Chicago)issuedaConfirmatoryActionLettertothelicenseedocumentingits agreement to fully evaluate the event and to obtain NRC concurrence before resuming operation of Unit 1.
The State of Illinois will be notified of this updated information.
Thisinformatponiscurrentasof4p.m., March 6,1989.
  ~ CONTACT:              so    (FTS388-5635)                      n        388-5590)
DISTRIBUTION:
WHlTE FLINT NORTH 1      MNBB  REGIONS          FAX TO:
Chairman Zech      CA      AEOD  RI                INP0fgjP --8: 0 (o Comm. Roberts      OGC    ARM  RII Comm. Carr          01      OIA  RIV              NSAC Licensee 1PrFy _ )F Comm. Rogers        ED0          RV              NRC Ops Ctr #:Id Comm. Curtiss      NRR    NL    MAIL T0:        PDR(8/634-3343)plb SECY'              NMSS    RES  DCS (Orig.)
  'GPA/SLITP/PA'          ACRS          D0T (Trans. Only)                                        pg e403140511 s90366
                      $ -II    89-16A N                                                      GM}}
 