PNO-III-89-016A, on 890306,Unit 1 Returned to Operation Following Reactor Scram on 890302.Unit 2 Remained in Operation & Unit 2 Station Auxiliary Transformer,Which Failed on 890302,repaired & Returned to Svc: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
#REDIRECT [[PNO-III-89-016, on 890303,Unit 1 Reactor Scrammed from 86% Power as Result of Turbine Trip,Which Appeared to Be Related to Fault in Unit 2 Sys Auxiliary Transformer. Unit 1 Expected to Remain Shut Down for Three Days]] | |||