ML20207P766: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML20207P766 | |||
| issue date = 01/08/1987 | |||
| title = Requests That Generic Issue (GI) 119.1, Pipe Rupture Requirements & Decoupling of Seismic Loads Be Subsumed in Remaining Portion of GI B-6, Loads,Load Combinations & Stress Limits | |||
| author name = Bosnak R | |||
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | |||
| addressee name = Kniel K | |||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | |||
| docket = | |||
| license number = | |||
| contact person = | |||
| case reference number = FOIA-88-464, REF-GTECI-119, REF-GTECI-B-06, REF-GTECI-NI, REF-GTECI-PI, TASK-119, TASK-B-06, TASK-B-6, TASK-OR | |||
| document report number = NUDOCS 8701200186 | |||
| package number = ML20205C260 | |||
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE | |||
| page count = 1 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ | |||
AwfM mia 9 B&P i' Ovn 4Qt'E7Md'zD2,Mf8M8pM'.27dM | |||
. .e M8 1987 | |||
.d C /,3 4 MEMORANDUM FOR: Karl K'nici, Chief Safety Program Evaluation Branch Division of Safety Review and Oversight FROM: Robert J. Bosnak, Chief - | |||
Engineering Issues Branch Division of Safety Review and Oversight | |||
==SUBJECT:== | |||
REQUEST FOR SUBSUMPTIO!! 0F GEtlERIC ISSUE B-d (GI B-6) IfiTO GEtiERIC ISSUE 119.1 (GI 119.1) | |||
NRR is the designated fiRC lead office for the resolution of the only uncompleted portion (decoupling of SSE and LOCA loads) of GI B-6, "Loads, load Combinations and Stress Limits". However, decoupling of SSE ano LOCA loads is also a part of GI 119.1, "Pipe Rupture Requirerents and Decoupling of Seismic and LOCA Loads; for which P.ES is the designated fiRC lead of fice. | |||
Since GI 119.1 is larger.in scope than GI B-G we request that Gl 119.1 subsume the remaining portion of GI B-6 to eliminate the unnecessarily redundant GlHCS tracking requirerents. RES and fiRR have been and will continue to work together in the resolution of these issues. | |||
Robert J. Bosnak, Chief Engineering issues Branch Division of Safety Review and Oversight l | |||
cc: T. Speis B. Sheron YS M < | |||
F. Cherny G. Arlotto J. Richardson J. O'Brien J. Page DISTRIDUTION 15peis BSheren DSR0 Chron ElB Rdg. File > | |||
A ~e'ntral files JPage RBosnak OFFICIAL RECORD COPY i ElB:DSRO ElB:DSR f, ElB RBor;nak R0 | |||
[ | |||
JPage FChernr , , | |||
j 01/ 7 /87 01/ 7 /87 01/"j7 /07 i- | |||
- pl le e, d | |||
) \) ~ | |||
~I | |||
,/" % 1 ' | |||
B701200106 870108 b' CF , SU3J,, | |||
..}} |
Latest revision as of 16:51, 5 December 2021
ML20207P766 | |
Person / Time | |
---|---|
Issue date: | 01/08/1987 |
From: | Bosnak R Office of Nuclear Reactor Regulation |
To: | Kniel K Office of Nuclear Reactor Regulation |
Shared Package | |
ML20205C260 | List: |
References | |
FOIA-88-464, REF-GTECI-119, REF-GTECI-B-06, REF-GTECI-NI, REF-GTECI-PI, TASK-119, TASK-B-06, TASK-B-6, TASK-OR NUDOCS 8701200186 | |
Download: ML20207P766 (1) | |
Text
_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
AwfM mia 9 B&P i' Ovn 4Qt'E7Md'zD2,Mf8M8pM'.27dM
. .e M8 1987
.d C /,3 4 MEMORANDUM FOR: Karl K'nici, Chief Safety Program Evaluation Branch Division of Safety Review and Oversight FROM: Robert J. Bosnak, Chief -
Engineering Issues Branch Division of Safety Review and Oversight
SUBJECT:
REQUEST FOR SUBSUMPTIO!! 0F GEtlERIC ISSUE B-d (GI B-6) IfiTO GEtiERIC ISSUE 119.1 (GI 119.1)
NRR is the designated fiRC lead office for the resolution of the only uncompleted portion (decoupling of SSE and LOCA loads) of GI B-6, "Loads, load Combinations and Stress Limits". However, decoupling of SSE ano LOCA loads is also a part of GI 119.1, "Pipe Rupture Requirerents and Decoupling of Seismic and LOCA Loads; for which P.ES is the designated fiRC lead of fice.
Since GI 119.1 is larger.in scope than GI B-G we request that Gl 119.1 subsume the remaining portion of GI B-6 to eliminate the unnecessarily redundant GlHCS tracking requirerents. RES and fiRR have been and will continue to work together in the resolution of these issues.
Robert J. Bosnak, Chief Engineering issues Branch Division of Safety Review and Oversight l
cc: T. Speis B. Sheron YS M <
F. Cherny G. Arlotto J. Richardson J. O'Brien J. Page DISTRIDUTION 15peis BSheren DSR0 Chron ElB Rdg. File >
A ~e'ntral files JPage RBosnak OFFICIAL RECORD COPY i ElB:DSRO ElB:DSR f, ElB RBor;nak R0
[
JPage FChernr , ,
j 01/ 7 /87 01/ 7 /87 01/"j7 /07 i-
- pl le e, d
) \) ~
~I
,/" % 1 '
B701200106 870108 b' CF , SU3J,,
..