05000302/LER-1986-001, Informs That Due to Extension of Schedule of Root Cause Investigation of Reactor Coolant Pump Shaft Failure Event, Suppl to LER 86-001 Now Expected by 870130: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000302/LER-1986-001]]
| number = ML20210N776
| issue date = 09/29/1986
| title = Informs That Due to Extension of Schedule of Root Cause Investigation of Reactor Coolant Pump Shaft Failure Event, Suppl to LER 86-001 Now Expected by 870130
| author name = Widell R
| author affiliation = FLORIDA POWER CORP.
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION (ADM)
| docket = 05000302
| license number =
| contact person =
| document report number = 3F0986-27, 3F986-27, NUDOCS 8610060641
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
}}
{{LER
| Title = Informs That Due to Extension of Schedule of Root Cause Investigation of Reactor Coolant Pump Shaft Failure Event, Suppl to LER 86-001 Now Expected by 870130
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000302
| LER year = 2086
| LER number = 1
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:1 l
l
  .r*. Eh'db.
2Go5? ~c%
0 89 Florida Power C OR PO R ATION September 29, 1986 3F0986-27 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
 
==Subject:==
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Licensee Event Report 86-001-01
 
==Dear Sir:==
 
The subject Licensee Event Report described the failure of a reactor coolant pump shaft at Crystal River Unit 3.              The July 2,1986 supplement indicated the root cause for the shaft failure was still unknown, but the investiga-tion was continuing. That investigation is still continuing. FPC indicated in the subject LER a supplement would be submitted by September 30, 1986.
This estimate was based on the expected availabili ty of the report documenting the resul ts of the root cause investigation.                            Due to the extension of the schecule of the root cause investigation, we now expect to supplement LER 86-001-01 by January 30, 1987.
Should there be any questions, please contact this office.
Sincerely, r
1 1
                  )
Rolf h Widell Manager, Nuclear Operations Licensing and Fuel Management AEF/feb xc:  Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 8610060641 860'/29 pf,6 p
PDR    ADOCK 00000302 S                    PDR GENERAL OFFICE: 3201 Thirty fourth Street South
* P.O. Box 14042
* St. Petersburg, Florida 33733 * (813) 866-5151 A Florida Progress Company i
}}
 
{{LER-Nav}}

Revision as of 11:30, 5 December 2021