ENS 55509: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
| event text = The Missouri University of Science and Technology Reactor (MSTR) is required by facility Technical Specification 3.3.2 to maintain pool water resistivity above 0.2 MOhm-cm so long as fuel elements are in the pool. TS 3.3.2 continues that 'This requirement may be waived for a period of up to 3 weeks once every 3 years.' On September 13, 2021, pool resistivity dropped below the 0.2 MOhm-cm threshold, triggering the three-week waiver to support water deionization system maintenance. Ion exchange resins for this system were replaced, but the system was not able to be restored to an operational status prior to exceeding the three-week waiver. It is noted that pool resistivity recovered above 0.2 MOhm-cm by September 14, 2021 and was maintained until the system was removed from service to replace the resins (September 28, 2021).
| event text = The Missouri University of Science and Technology Reactor (MSTR) is required by facility Technical Specification 3.3.2 to maintain pool water resistivity above 0.2 MOhm-cm so long as fuel elements are in the pool. TS 3.3.2 continues that 'This requirement may be waived for a period of up to 3 weeks once every 3 years.' On September 13, 2021, pool resistivity dropped below the 0.2 MOhm-cm threshold, triggering the three-week waiver to support water deionization system maintenance. Ion exchange resins for this system were replaced, but the system was not able to be restored to an operational status prior to exceeding the three-week waiver. It is noted that pool resistivity recovered above 0.2 MOhm-cm by September 14, 2021 and was maintained until the system was removed from service to replace the resins (September 28, 2021).
This report is being made under the provisions of MSTR Technical Specification 6.7.2, requiring a report by telephone to the NRC Headquarters Operations Center no later than the following working day. Under the provisions of MSTR Technical Specification 6.7.2, a written follow-up report will be submitted to the Commission within 14 days. Additional replacement parts will need to be secured and repairs performed to restore operability. It is anticipated that full compliance with TS 3.3.2 will be restored within two weeks (by October 19, 2021).
This report is being made under the provisions of MSTR Technical Specification 6.7.2, requiring a report by telephone to the NRC Headquarters Operations Center no later than the following working day. Under the provisions of MSTR Technical Specification 6.7.2, a written follow-up report will be submitted to the Commission within 14 days. Additional replacement parts will need to be secured and repairs performed to restore operability. It is anticipated that full compliance with TS 3.3.2 will be restored within two weeks (by October 19, 2021).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/20211006en.html#en55509
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/20211007en.html#en55509
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Latest revision as of 06:30, 7 October 2021

ENS 55509 +/-
Where
Missouri U Of Science &Amp; Tech (Mist)
Rolla, Missouri (NRC Region 0)
License number: R-79
Reporting
Non
Time - Person (Reporting Time:+32.33 h1.347 days <br />0.192 weeks <br />0.0443 months <br />)
Opened: Ethan Taber
13:20 Oct 5, 2021
NRC Officer: Brian Lin
Last Updated: Oct 5, 2021
55509 - NRC Website