ML21181A077: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:June 29, 2021 Mr. John A. Stewart President Nuclear Fuel Services, Inc.
{{#Wiki_filter:}}
P.O. Box 337, MS 123 Erwin, TN 37650-0337
 
==SUBJECT:==
NUCLEAR FUEL SERVICES, INC - CALENDAR YEAR 2022 INSPECTION SCHEDULE
 
==Dear Mr. Stewart:==
 
Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at Nuclear Fuel Services for calendar year 2022. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.
Please note that any regional initiative or other reactive inspection is not included in the schedule. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Joel Rivera at (404) 997-4825 with any questions or concerns you may have regarding this letter or the inspection schedule.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                      /RA/
Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07000143 License No. SNM-124
 
==Enclosure:==
 
2022 Nuclear Fuel Services Inspection Schedule cc: w/ encl: Distribution via LISTSERV
 
ML21181A077                      SUNSI REVIEW COMPLETE      FORM 665 ATTACHED OFFICE                RII:DFFI      RII:DFFI NAME              J. Rivera-Ortiz  R. Williams DATE                6/16/2021    06/29/2021 NUCLEAR FUEL SERVICES 2022 INSPECTION/ACTIVITY PLAN CALENDAR NRC Inspection 1 Dates                      Feb 7 - 11, 2022 Number of Inspectors        1 Inspection Procedures      81700.01, 81340, 81335, and 81820 - Physical Security NRC Inspection 2 Dates                      March 21 - 25, 2022 Number of Inspectors        2 Inspection Procedures      88020 - Operational Safety 1 NRC Inspection 3 Dates                      April 4 - 8, 2022 Number of Inspectors        2 Procedures in Inspector Manual Chapter (IMC) 2683 -
Inspection Procedures Material Control and Accounting (MC&A)
NRC Inspection 4 Dates                      April 11 - 15, 2022 Number of Inspectors        1 Inspection Procedures      96001 - Physical Security NRC Inspection 5 Dates                      May 9 - 13, 2022 Number of Inspectors        1 Inspection Procedures      96001 and 81700.11 - Physical Security Enclosure
 
NRC Inspection 6 Dates                May 16 - 20, 2022 Number of Inspectors  2 Inspection Procedures 88015 - Nuclear Criticality Safety 1 NRC Inspection 7 Dates                June 13 - 17, 2022 Number of Inspectors  2 88055 - Fire Protection Inspection Procedures 88050 - Emergency Preparedness NRC Inspection 8 Dates                July 11 - 15, 2022 Number of Inspectors  1 Inspection Procedures 81700.07 and 81700.10 - Physical Security NRC Inspection 9 Dates                Aug 15 - 19, 2022 Number of Inspectors  1 Inspection Procedures Procedures in IMC 2683, MC&A - Inventory Observation NRC Inspection 10 Dates                Aug 29 - Sept 2, 2022 Number of Inspectors  2 88020 - Operational Safety Inspection Procedures 86740 - Transportation NRC Inspection 11 Dates                Nov 7 - 11, 2022 Number of Inspectors  3 88015 - Nuclear Criticality Safety 2 Inspection Procedures 88070 - Plant Modifications (Annual) 2
 
NRC Inspection 12 Dates                Nov 14 - 18, 2022 Number of Inspectors  1 Inspection Procedures 81700.02 - Physical Security NRC Inspection 13 Dates                Dec 12 - 16, 2022 Number of Inspectors  2 Inspection Procedures Procedures in IMC 2683, MC&A 3}}

Revision as of 05:09, 8 September 2021

NRC Letter - 2022 Nfs Inspection Schedule Tf
ML21181A077
Person / Time
Site: Erwin
Issue date: 06/29/2021
From: Robert Williams
NRC/RGN-II/DFFI/FFB1
To: Stewart J
Nuclear Fuel Services
TF
References
Download: ML21181A077 (5)


Text