ML20212A715: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[RBG-44252, Forwards Rev 0 to RBS Cycle 8 COLR & Rev 2 to RBS Cycle 7 COLR, Submitted IAW TS 5.6.5 of App a of Fol.General Electric Supplemental Reload Licensing Repts,Also Encl]]
| number = ML20212A715
| issue date = 10/17/1997
| title = Forwards Rev 0 to RBS Cycle 8 COLR & Rev 2 to RBS Cycle 7 COLR, Submitted IAW TS 5.6.5 of App a of Fol.General Electric Supplemental Reload Licensing Repts,Also Encl
| author name = King R
| author affiliation = ENTERGY OPERATIONS, INC.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000458
| license number =
| contact person =
| document report number = RBF1-97-0389, RBF1-97-389, RBG-44252, NUDOCS 9710240211
| package number = ML20212A720
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:..                                                                                      ___ -            ._ -          ._
l
.                                                                                    Ent:rgy Operations,Inc.                l River Bend StaSon 5485 U. S Highway 61 y                                                                              PO Box 220
    ,    gh{J                                                                        St Francisvine. LA 70775 Tel 504 336 ts225 ran 504 635 5008
                                                                                                                            )
Rick J. King Sa'e'y & Heg ' itory AHws October 17,1997                                                                                                    l l
U. S. NRC                                                                                                          l Document Control Desk, OPl-17 Washington, DC 20555
 
==Subject:==
River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 Eighth Fuel Cycle Core Operating Limits Report (COLR), Revision 0 File Nos.:    G9.5, G9.25.1.5 RBG-44252 RBF1-97-0389 Ladies and Gentlemen:
Enclosed are Revision 2 of the River Bend Station (RBS) Core Operation Lir.iits Report (COLR) for the seventh fuel cycle and the COLR for the eighth fuei cycle. These reports are submitted in accordance with Technical Specification 5.6,5 of Appendix A of the Facility Operating License 14PF-47. The General Electric Supplemental reload licensing submittals are also included.
Revision 2 of the COLR for the seventh cycle documents the conversion to the SAFER /GESTR LOCA ECCS analysis methodology which was implemented at the end of the seventh fuel cycle.
For furthur information, centact Mr. T. W. Gates of my staf f at (504) 381-4866.
f Sincerely, f
e7W RJK/BMB/
vo enclosure I                                                          ll ll!!!NllfUflfll(!lllfflllllfllllf 97102402=11f71015" m *=
P b458
 
Eighth Fuel Cycle Core Operating Limits Report (COLR), Revision 0 October 17,1997
            ' RBG-44252 RBFl.97-0389 Page 2 of 2 cc:    NRC Resident inspector P. O. Box 1050 -
St. Francisville, LA 70775 U.- S. NkC R:gionIV
  .                  611 Ryan Plaza Drive, Suite 400 Arlington,TX 76011 Department of Environmental Quality Radiation Protection Division -
P. O. Box 82135 Baton Rouge, LA 70884-2135 Attn: Administrator Mr. David L. Wigginton                                    i U. S. NRC MS/OWFN 13-11-3
                    . Washington, DC 20555 i
                                                                                'i}}

Latest revision as of 01:16, 28 July 2021