The ice bed is a single train system which functions to control radiation release and mitigate the consequences of an accident by scrubbing radioactive iodine and providing a heat sink to limit containment pressure within design limits, therefore the requirements of 10 CFR 50.72 (b) (3) (v) (C) and (D) were met. | The ice bed is a single train system which functions to control radiation release and mitigate the consequences of an accident by scrubbing radioactive iodine and providing a heat sink to limit containment pressure within design limits, therefore the requirements of 10 CFR 50.72 (b) (3) (v) (C) and (D) were met. | ||
There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. | There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/20210727en.html#en55379 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 2 | | Unit = 2 |
Latest revision as of 07:30, 27 July 2021
Where | |
---|---|
Sequoyah Tennessee (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material | |
LER: | 05000327/LER-2021-001 & LER 2021-001-00 for Sequoyah Nuclear Plant Units 1 & 2 Ice Bed Inoperable Due to Exceeding Surveillance Requirement Frequency |
Time - Person (Reporting Time:+-0.63 h-0.0263 days <br />-0.00375 weeks <br />-8.62974e-4 months <br />) | |
Opened: | Ben Hammargren 16:00 Jul 25, 2021 |
NRC Officer: | Brian P. Smith |
Last Updated: | Jul 25, 2021 |