ML20216B860: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[U-602952, Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 980530]]
| number = ML20216B860
| issue date = 03/06/1998
| title = Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 980530
| author name = Macfarland W
| author affiliation = ILLINOIS POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000461
| license number =
| contact person =
| case reference number = REF-PT21-98
| document report number = 21-98-001, 21-98-1, U-602952, NUDOCS 9803130205
| document type = DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21), TEXT-SAFETY REPORT
| page count = 2
}}
 
=Text=
{{#Wiki_filter:I
  * **                                                                                  lil; nots Power Comp;ny Clinton Pow;r Station P O Box 678 Chnton. IL 61727                  j Tel 217 935-5623                    I Fax 217 935-4632 Walter G. MacFarland IV E NMS                                                                                                            i P&MR                                                                      U-602952 4F.140 An IWnova Company l
March 6, 1998 I
4 Docket No. 50-461                                                        10CFR21.21 Document Control Desk                                                                                        l U.S. Nuclear Regulatory Commission Washington, D.C. 20555
 
==Subject:==
10CFR21 Interim Report 21-98-001: ITT Barton Model 580A Series dP Indicating Switch Operating Force Concerns
 
==Dear Madam or Sir:==
 
On December 22,1997, ITT Barton issued an Industry Advisory memo to Illinois Power (IP) identifying a condition potentially affecting ITT Barton models 580A, 581 A, 583 A, and 583B differential pressure indicating switches (DPIS) supplied with certification to IEEE-323/344 qualifications. ITT Barton has recently identified that the miniature switches used inside the indicated instruments may have operating forces too low to preclude switch contact chatter in some installations when subjected to seismic induced vibrations.
ITT Barton had originally certified that these switches would not experience                \ y contact chatter during seismic loadings of up to 12 Gs, as long as the force required to operate the internal miniature switches is high (i.e., between 76 and 95 grams). ITT Badon performs operating force selection testing where all switches with operating force between 76 and 95 grams are identified and marked with a blue paint spot. All remaining switches are marked with a yellow paint spot. ITT Barton discovered that                bbg    >
their manufacturing system had allowed the yellow paint spot switches to be used along                /
with the blue paint spot switches in assembly of models 580A, 581 A,583A, and 583B differential pressure indicating switches (DPIS) supplied with IEEE-323/344 certification to ITT Barton Qualification Reports R3-580A-9, R3-580A-10, R3-580A-29 or to Westinghouse with Certification to ITT Barton Baseline Documents 0580-11395,0581-10325, and 0581-10225.
IP determined that this issue was potentially reportable under the provisions of 10CFR21 on January 7,1998, 9803130205 980306 P    * " " m'                                                                        ilpylqI!IyIcigiqillljillpi
 
\-
        -*                                                                              U 602939 Page 2 t
j'      .        .
1                                ..
!                    Condition Report 1-98-01-056 was initiated to track investigation and resolution of this issue. IP's evaluation of this issue, under the provisions of 10CFR21, has not been l          completed. The evaluation of this issue will be completed by May 30,1998c Additional information about this issue may be obtained by contacting R. D.
Weber, Supervisor-Procurement Engineering at (217) 935-8881, extension 3785.
I Sincerely yours, h@
Walter G. MacFarland, IV ChiefNuclear Officer RWF/krk cc:      NRC Clinton Licensing Project Manager NRC Resident Office, V-690 -
Regional Administrator, Region III, USNRC G. C. Wright, Region III, USNRC Illinois Department of Nuclear Safety INPO Records Center ITT Barton l
l l
:}}

Latest revision as of 03:24, 27 July 2021