ML20234C910: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[B12577, Forwards Connecticut Yankee Third 10-Yr Interval Inservice Test Pump & Valve Program Submittal & ...Inservice Insp Plan Summary Submittal, for Third 10-yr Insp Interval Commencing on 880101.Fee Paid]]
| number = ML20234C910
| issue date = 06/30/1987
| title = Forwards Connecticut Yankee Third 10-Yr Interval Inservice Test Pump & Valve Program Submittal & ...Inservice Insp Plan Summary Submittal, for Third 10-yr Insp Interval Commencing on 880101.Fee Paid
| author name = Mroczka E
| author affiliation = CONNECTICUT YANKEE ATOMIC POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000213
| license number =
| contact person =
| document report number = B12577, NUDOCS 8707070001
| package number = ML20234C913
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
}}
 
=Text=
{{#Wiki_filter:q
: a.                                                                                                    \
Y l
CONNECTICUT YANKEE ATOMIC POWER COMPANY B E F1 L 1 N, CONNECT l CUT P O. BOX 270 HARTFORD CONNECTICUT 06141-0270 i
TELEPHONE 203-665-5000 June 30,1987 Docket No. 50-213 B12577
 
==Reference:==
10CFR50.55a(g)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
 
==Reference:==
(1) E.3. Mroczka letter to the NRC, "Haddam Neck Plant Response to Open Items Identified During May 8,1986, Meeting on Proposed Revision to the Inservice Testing Program (IST)," dated February 4,1987.
Gentlemen:
Haddam Neck Plant inservice Inspection and Testing Programs Third Ten-Year Interval l
1 i
l The Connecticut Yankee Atomic Power Company (CYAPCO) submits herewith                              '
the Inservice Inspection (ISI) and Inservice Testing (IST) Programs for the third ten-year inspection interval at the Haddam Neck Plant. These programs are submitted in accordance with 10CFR50.55a(g), and are set forth in the enclosed volumes " Connecticut Yankee Third Ten-Year Interval Inservice Test Pump and Valve Program Submittal" and " Connecticut Yankee Thira Ten-Year Interval                        ,
Inservice Inspection Plan Summary Submittal." The third ten-year inspection                      '
interval commences January 1,1988.
CYAPCO also describes, in Sections 10.0 and 11.0 of the IST Program, an augmented testing prodram for the Emergency Diesel Generator Auxiliary System Pumps and Valves. CYAPCO committed in Reference I to implement                            i such a program as part of the ISI/IST program update for the third ten-year                      !
interval.
h      DD          [
pg.c,Y u; C#eCA. g/$00                        -l
 
e U.S. Nuclear Regulatory Commission B12577/Page 2 June 30,1987 Should there be any questions regarding this submittal, CYAPCO's licensing representatives may be contacted directly.        CYAPCO requests that such questions be provided consistent with the January 1,1988 implementation date for these programs.
In accordance with 10CFR170.12, CYAPCO encloses a check in the amount of
    $150.00.
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY h /f^r %
E.%)ftrdczka //
Seni6r Vice President cc:    W. T. Russell, Region I Administrator P. D. Swetland, Resident inspector, Haddam Neck Plant F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant I
                                                                                    '.}}

Latest revision as of 14:22, 26 July 2021