PNO-V-89-033C, on 890609,plant Reached Cold Shutdown in Preparation for Reinstalling Refueling Bridge Into Reactor Bldg.Bridge Removed for Refurbishment/Mod.Reduction in Force of Nonessential Contractor Personnel in Progress: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[PNO-V-89-033, on 890606,voters Defeated Measure K,Encouraging Util to Cease Operating Facility.Util Board Previously Announced That Plant Would Be Shutdown If Measure K Defeated.Safe Shutdown Plan Implemented]]
| number = ML20245A327
| issue date = 06/12/1989
| title = PNO-V-89-033C:on 890609,plant Reached Cold Shutdown in Preparation for Reinstalling Refueling Bridge Into Reactor Bldg.Bridge Removed for Refurbishment/Mod.Reduction in Force of Nonessential Contractor Personnel in Progress
| author name = Richards S
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee name =
| addressee affiliation =
| docket = 05000312
| license number =
| contact person =
| document report number = PNO-V-89-033C, PNO-V-89-33C, NUDOCS 8906210235
| document type = PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO,, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
{{#Wiki_filter:__
              .                .                                                              P PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-V-89-33C Date 6/17/89 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received i without verification or evaluation and is basically all that is known by Region V staff on this date.
FACILITY:        SACRAMENTO MUNICIPAL UTILITY DISTRICT    Emergency Classification RANCHO SECO UNIT 1                            Notification of Unusual Event DOCKET NO. 50-312                            Alert HERALD CA                                    Site Area Emergency General Emergency
_X_ Not Applicable l
 
==SUBJECT:==
RANCHO SECO SHUTDOWN (UPDATE)
The plant reached a cold shutdown condition at 6:45 p.m. (PDT), June 9,19E9.
The plant is presently at approximately 120 F. The licensee is preparing to enter the reactor building to continue routine cold shutdown evolutions. The licensee is working towards reinstalling the refueling bridge into the reactor building. The bridge had been removed for refurbishment / modification. The l
licensee's shutdown contingency plan calls for the fuel to be moved to the spent fuel pool in the September 1989, timeframe.
The licensee has initiated the first reduction in force of approximately 390                          I nonessential contractor clerical, engineering, and craft personnel. Region V has reviewed the list of affected personnel and has concluded that the reduction-in-force will not adversely affect the licensee's ability to maintain the plant in the present configuration. No further significant reductions are currently scheduled.
l Media interest continues.
1 This information is current as of 7:30 a.m. (PDT), June 12, 1989.
l CONTACT: S. Richards FTS 463-3853 DISTRIBUTION BY 5520:                              FAX TO:
Date 6/12/89          Time M 9 (PDT)              Date      Time Chai nnan Zech            tuu      RI            INP0 Comm. Roberts              AEOD      RII            NSAC Comm. Carr                PA0      RIII          LICENSEE Comm. Rogers              SLITP    RIV            RESIDENT INSPECTOR Comm. Curtiss              NRR                      HQS. OPERATIONS OFFICER SECY                      NMSS                    PDR (202)S34-3343 CA                        ARM                      MAIL T0:
01                                                  DCS(Original)
OGC                        OIA                      DOT:(Trans. Only, Applicable State)
ACRS                      RES GPA 8
8906210235 090612 PDR  18<E h
PNO-V-89-33C      PNU L      __- _-}}
 
{{PNO-Nav|region=V}}

Revision as of 07:51, 19 March 2021