ENS 55066: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
| utype = W-4-LP, W-4-LP | | utype = W-4-LP, W-4-LP | ||
| cfr = 10 CFR 26.719 | | cfr = 10 CFR 26.719 | ||
| emergency class = | | emergency class = Non Emergency | ||
| notification date = 01/12/2021 20:26 | | notification date = 01/12/2021 20:26 | ||
| notification by = David Gullott | | notification by = David Gullott | ||
Line 19: | Line 19: | ||
| event text = A corporate supervisor had a confirmed positive during a random fitness-for-duty test. The employee's access to the plants has been terminated. | | event text = A corporate supervisor had a confirmed positive during a random fitness-for-duty test. The employee's access to the plants has been terminated. | ||
The NRC Resident Inspectors will be notified. | The NRC Resident Inspectors will be notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/20210114en.html#en55066 | ||
}}{{unit info | |||
| Unit = 1 | |||
| type = W-4-LP | |||
| Scram code = N | |||
| Reactor critical = Y | |||
| Initial power = 100 | |||
| Initial reactor mode = Power Operation | |||
| Current power = 100 | |||
| Current reactor mode = Power Operation | |||
}}{{unit info | |||
| Unit = 2 | |||
| type = W-4-LP | |||
| Scram code = N | |||
| Reactor critical = Y | |||
| Initial power = 100 | |||
| Initial reactor mode = Power Operation | |||
| Current power = 100 | |||
| Current reactor mode = Power Operation | |||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] |
Latest revision as of 12:33, 15 January 2021
Where | |
---|---|
Braidwood Illinois (NRC Region 3) | |
Reporting | |
10 CFR 26.719 | |
Time - Person (Reporting Time:+5.68 h0.237 days <br />0.0338 weeks <br />0.00778 months <br />) | |
Opened: | David Gullott 20:26 Jan 12, 2021 |
NRC Officer: | Kerby Scales |
Last Updated: | Jan 13, 2021 |
55066 - NRC Website
| |