ENS 54491: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 10: Line 10:
| utype = GE-4, GE-4
| utype = GE-4, GE-4
| cfr = 10 CFR 26.719
| cfr = 10 CFR 26.719
| emergency class = Non Emergency
| emergency class = Non Emergency
| notification date = 01/22/2020 17:50
| notification date = 01/22/2020 17:50
| notification by = Brandon Shuman
| notification by = Brandon Shuman
| NRC officer = Thomas Kendzia</Td>
| NRC officer = Thomas Kendzia
| event date = 01/21/2020 20:05 EST
| event date = 01/21/2020 20:05 EST
| last update date = 01/22/2020
| last update date = 01/22/2020
| title = Fitness for Duty (Ffd) Issue Involving Contract Personnel
| title = Fitness for Duty (Ffd) Issue Involving Contract Personnel
| event text =
| event text = At 2005 EST on January 21, 2020, Hatch Security was informed that a contract worker covered by 10 CFR 26.719(b) had been involved in a legal action as defined in 10 CFR 26.5. The contract worker's plant access has been suspended.
"At 2005 EST on January 21, 2020, Hatch Security was informed that a contract worker covered by 10 CFR 26.719(b) had been involved in a legal action as defined in 10 CFR 26.5. The contract worker's plant access has been suspended."
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.</td>
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200123en.html#en54491
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200123en.html#en54491
}}{{unit info
| Unit = 1
| type = GE-4
| Scram code = N
| Reactor critical = Y
| Initial power = 90
| Initial reactor mode = Power Operation
| Current power = 90
| Current reactor mode = Power Operation
}}{{unit info
| Unit = 2
| type = GE-4
| Scram code = N
| Reactor critical = Y
| Initial power = 100
| Initial reactor mode = Power Operation
| Current power = 100
| Current reactor mode = Power Operation
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Latest revision as of 11:59, 15 January 2021

ENS 54491 +/-
Where
Hatch Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
10 CFR 26.719, FFD Reporting Requirements
Time - Person (Reporting Time:+16.75 h0.698 days <br />0.0997 weeks <br />0.0229 months <br />)
Opened: Brandon Shuman
17:50 Jan 22, 2020
NRC Officer: Thomas Kendzia
Last Updated: Jan 22, 2020
54491 - NRC Website
Loading map...