ENS 54752: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 10: Line 10:
| utype = W-4-LP, W-4-LP
| utype = W-4-LP, W-4-LP
| cfr = 10 CFR 50.72(b)(3)(xiii)
| cfr = 10 CFR 50.72(b)(3)(xiii)
| emergency class = Non Emergency
| emergency class = Non Emergency
| notification date = 06/22/2020 01:00
| notification date = 06/22/2020 01:00
| notification by = Scott Milton
| notification by = Scott Milton
Line 17: Line 17:
| last update date = 06/22/2020
| last update date = 06/22/2020
| title = Unplanned Technical Support Center Ventilation Maintenance
| title = Unplanned Technical Support Center Ventilation Maintenance
| event text = "At 2100 on June 21, 2020, a condition was discovered which will require corrective maintenance activities to be performed on the Technical Support Center (TSC) HVAC. The work will include repair of the Condensing Unit system. The estimated duration of repair is unknown at this time.
| event text = At 2100 on June 21, 2020, a condition was discovered which will require corrective maintenance activities to be performed on the Technical Support Center (TSC) HVAC. The work will include repair of the Condensing Unit system. The estimated duration of repair is unknown at this time.
 
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to the alternate facility.
"If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to the alternate facility.
This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the discovered condition of the TSC affects the functionality of an emergency response facility.
 
There was no impact on the health and safety of the public or plant personnel.
"This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the discovered condition of the TSC affects the functionality of an emergency response facility.
The NRC Resident Inspector has been notified.
 
"There was no impact on the health and safety of the public or plant personnel.
 
"The NRC Resident Inspector has been notified."</td>
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200623en.html#en54752
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200623en.html#en54752
}}{{unit info
| Unit = 1
| type = W-4-LP
| Scram code = N
| Reactor critical = Y
| Initial power = 100
| Initial reactor mode = Power Operation
| Current power = 100
| Current reactor mode = Power Operation
}}{{unit info
| Unit = 2
| type = W-4-LP
| Scram code = N
| Reactor critical = Y
| Initial power = 100
| Initial reactor mode = Power Operation
| Current power = 100
| Current reactor mode = Power Operation
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Latest revision as of 12:34, 15 January 2021

ENS 54752 +/-
Where
Catawba Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+0 h0 days <br />0 weeks <br />0 months <br />)
Opened: Scott Milton
01:00 Jun 22, 2020
NRC Officer: Ossy Font
Last Updated: Jun 22, 2020
54752 - NRC Website
Loading map...