ENS 54752: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 10: | Line 10: | ||
| utype = W-4-LP, W-4-LP | | utype = W-4-LP, W-4-LP | ||
| cfr = 10 CFR 50.72(b)(3)(xiii) | | cfr = 10 CFR 50.72(b)(3)(xiii) | ||
| emergency class = Non Emergency | | emergency class = Non Emergency | ||
| notification date = 06/22/2020 01:00 | | notification date = 06/22/2020 01:00 | ||
| notification by = Scott Milton | | notification by = Scott Milton | ||
Line 17: | Line 17: | ||
| last update date = 06/22/2020 | | last update date = 06/22/2020 | ||
| title = Unplanned Technical Support Center Ventilation Maintenance | | title = Unplanned Technical Support Center Ventilation Maintenance | ||
| event text = At 2100 on June 21, 2020, a condition was discovered which will require corrective maintenance activities to be performed on the Technical Support Center (TSC) HVAC. The work will include repair of the Condensing Unit system. The estimated duration of repair is unknown at this time. | | event text = "At 2100 on June 21, 2020, a condition was discovered which will require corrective maintenance activities to be performed on the Technical Support Center (TSC) HVAC. The work will include repair of the Condensing Unit system. The estimated duration of repair is unknown at this time. | ||
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to the alternate facility. | |||
This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the discovered condition of the TSC affects the functionality of an emergency response facility. | "If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to the alternate facility. | ||
There was no impact on the health and safety of the public or plant personnel. | |||
The NRC Resident Inspector has been notified. | "This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the discovered condition of the TSC affects the functionality of an emergency response facility. | ||
"There was no impact on the health and safety of the public or plant personnel. | |||
"The NRC Resident Inspector has been notified."</td> | |||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200623en.html#en54752 | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200623en.html#en54752 | ||
}}{{unit info | }}{{unit info | ||
| Unit = | | Unit = 1 | ||
| type = | | type = W-4-LP | ||
| Scram code = | | Scram code = N | ||
| Reactor critical = | | Reactor critical = Y | ||
| Initial power = | | Initial power = 100 | ||
| Initial reactor mode = | | Initial reactor mode = Power Operation | ||
| Current power = | | Current power = 100 | ||
| Current reactor mode = | | Current reactor mode = Power Operation | ||
}}{{unit info | }}{{unit info | ||
| Unit = | | Unit = 2 | ||
| type = | | type = W-4-LP | ||
| Scram code = | | Scram code = N | ||
| Reactor critical = | | Reactor critical = Y | ||
| Initial power = | | Initial power = 100 | ||
| Initial reactor mode = | | Initial reactor mode = Power Operation | ||
| Current power = | | Current power = 100 | ||
| Current reactor mode = | | Current reactor mode = Power Operation | ||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] |
Revision as of 00:02, 15 January 2021
Where | |
---|---|
Catawba South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+0 h0 days <br />0 weeks <br />0 months <br />) | |
Opened: | Scott Milton 01:00 Jun 22, 2020 |
NRC Officer: | Ossy Font |
Last Updated: | Jun 22, 2020 |
54752 - NRC Website
| |