ENS 54491: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
Line 9: Line 9:
| unit = 1, 2
| unit = 1, 2
| utype = GE-4, GE-4
| utype = GE-4, GE-4
| cfr = 10 CFR 26.719
| cfr = <Br />
| emergency class =  Non Emergency  
26.719
| emergency class =  Non Emergency
| notification date = 01/22/2020 17:50
| notification date = 01/22/2020 17:50
| notification by = Brandon Shuman
| notification by = Brandon Shuman
| NRC officer = Thomas Kendzia
| NRC officer = Thomas Kendzia</Td>
| event date = 01/21/2020 20:05 EST
| event date = 01/21/2020 20:05 EST
| last update date = 01/22/2020
| last update date = 01/22/2020</td>
| title = Fitness for Duty (Ffd) Issue Involving Contract Personnel
| title = Fitness for Duty (Ffd) Issue Involving Contract Personnel<Br />
| event text =
| event text = <br />
At 2005 EST on January 21, 2020, Hatch Security was informed that a contract worker covered by 10 CFR 26.719(b) had been involved in a legal action as defined in 10 CFR 26.5. The contract worker's plant access has been suspended.
&quot;At 2005 EST on January 21, 2020, Hatch Security was informed that a contract worker covered by 10 CFR 26.719(b) had been involved in a legal action as defined in 10 CFR 26.5. The contract worker&#39;s plant access has been suspended.&quot;<br />
The NRC Resident Inspector has been notified.
<br />
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200123en.html#en54491
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200123en.html#en54491
}}{{unit info
}}{{unit info
| Unit = 1  
| Unit = 1
| type =  
| type = GE-4
| Scram code = N  
| Scram code = N
| Reactor critical = Y  
| Reactor critical = Y
| Initial power = 90  
| Initial power = 90
| Initial reactor mode = Power Operation  
| Initial reactor mode = Power Operation
| Current power = 90  
| Current power = 90
| Current reactor mode = Power Operation  
| Current reactor mode = Power Operation
}}{{unit info
}}{{unit info
| Unit = 2  
| Unit = 2
| type =  
| type = GE-4
| Scram code = N  
| Scram code = N
| Reactor critical = Y  
| Reactor critical = Y
| Initial power = 100  
| Initial power = 100
| Initial reactor mode = Power Operation  
| Initial reactor mode = Power Operation
| Current power = 100  
| Current power = 100
| Current reactor mode = Power Operation  
| Current reactor mode = Power Operation
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Revision as of 08:32, 1 January 2021

ENS 54491 +/-
Where
Hatch Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting

26.719
Time - Person (Reporting Time:+16.75 h0.698 days <br />0.0997 weeks <br />0.0229 months <br />)
Opened: Brandon Shuman
17:50 Jan 22, 2020
NRC Officer: Thomas Kendzia
Last Updated: Error: Invalid time.
54491 - NRC Website
Loading map...