05000325/LER-1982-127, Updated LER 82-127/01T-1:on 821103,quick Start Testing of Diesel Generators 2,3 & 4 Not Performed for 12 H Period Per Tech Spec.Caused by Failure to Enter Requirement Into Daily Surveillance Rept on 821102.Testing Performed: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000325/LER-1982-127]]
| number = ML20070K588
| issue date = 12/23/1982
| title = Updated LER 82-127/01T-1:on 821103,quick Start Testing of Diesel Generators 2,3 & 4 Not Performed for 12 H Period Per Tech Spec.Caused by Failure to Enter Requirement Into Daily Surveillance Rept on 821102.Testing Performed
| author name = Pastva M
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000325
| license number =
| contact person =
| document report number = LER-82-127-01T, LER-82-127-1T, NUDOCS 8212300225
| package number = ML20070K573
| document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| page count = 2
}}
{{LER
| Title = Updated LER 82-127/01T-1:on 821103,quick Start Testing of Diesel Generators 2,3 & 4 Not Performed for 12 H Period Per Tech Spec.Caused by Failure to Enter Requirement Into Daily Surveillance Rept on 821102.Testing Performed
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000325
| LER year = 2082
| LER number = 127
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:NRC FORM 366                                                                                                                                                          U. S. NUCLEA3 EEGULATORY COMMISS60N 0 77)                                                                                                                                                            Update Report:
LICENSEE EVENT REPORT                                            Previous Report Date 11-16-82 CONTROL BLOCK: l i
l      l    l    l          l      lh e
(PLEA!E PRINT OR TYPE ALL REQUIRED INFORMATION) 7 o 1 8 9 l Nl Cl                Bl El Pl 1l@l150 ] 0l -l 0 l LICENSE LICENSEE CODE                14 0 l 0NUM8ER    l 0 ] 0 l -l 0 l 02h l@l                  28 4 lLICENSE    1 l l lTYPEll 1l@l JO      bi CAI b6 l    l@
CON'T 10111 7        8 S uRC        ILhl0l5l0l-l0l3l2l5@l11110l3l812l@l112l2lllRl?lh 60          61                DOCKET NOVBER                              68          69          EVENT DATE                  74        75      REPORT DATE                80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h 1012 l l During plant operation it was determined that required quick start testing of diesel l lo l3l l generators 2, 3, and 4 had not been performed within the specified performance                                                                                                                                        l g o l4; l frequency of once every 12 hours for the 12-hour period ending at 0920 hours on                                                                                                                                  j loIsl l 11-3-82.                At the time of this event, Diesel Generator No. I was unavailable, as it                                                                                                      g o o ; had been removed from service on 11-2-82 for periodic testing. This event did not                                                                                                                                    l l 0 l 7 l l affect the health and safety of the public.                                                                                                                                                                      l Technical Specifications 3.8.1.1, 6.9.1.8f                                                                                                                            l l0lH] l 80 7        8 9 C DE                  CODE              SU8C E                              COMPONENT CODE                            SLB DE              SU ODE
  !O19l 7        8 l El El@ Wh Wh lZ lZ lZ lZ lZ lZ lh Jh Q h 9          10            11                      12                13                                    18                19              20
_                                                    SEQUENTIAL                                      OCCURRENCE                  REPORT                        REVISION LE R RO      EVENT YE AR                                          REPORT NO.                                          CODE                      TYPE                              N O.
hR            y RT l8l2l                  l-l                      l1l2l7l 24                2b y21 l0 l1 l 28      29
[
30 b                  y 32
_ 21          22          23                                                                                                                      31
                                                                                                                                                                                                    ~
AK I          A    ON          ON LA T                ET O                                  HOURS 22                  S8 IT            FoR              6.      SU PL                MANUFACTURER QJggg 33                34 Wg W@
3d                %
l0l0l0l0l 31                                40 Wg gg 41                42 Wg 43 l Z l 9 l 9 l9 lg 44                47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l i l O ] ] The subject testing requirement had not been entered into the Control Operator's                                                                                                                                  l li j i l l daily surveillance report (DSR) when the requirement became effective on 11-2-82.                                                                                                                                  l
      , 7          l Satisfactory quick starts were performed two hours and 39 minutes beyond the required l l,l3] l time frame. The subject requirement was then reficcted in the DSR.                                                                                                                      All plant                    l li i4 i l licensed personnel will review this report.                                                                                                                                                                        l 7        8 9                                                                                                                                                                                                              80 ST            S            % POWER                        OTHER STATUS                                S OV RY                                          DISCOVERY DESCRIPTION i s J @ l0l7l6l@l                                                                        NA l                W @l Operational Event                                                                            l ACTIVITY CO TENT RE LE ASE D OF RELEASE                                  AMOUNT OF ACTIVITY                                                                                LOCATION OF RELE ASE 7
1 6 8 9 g      to l
11 NA l 44 l
45 NA 80 l
PERSONNEL FXPOSURES NUURER                  TYPE            DESCRIPTION 1 7 l0l0l0l@ ] @[                                                                                                                   NA                                                                          l PERSONNEL INJURIES NUMFtER                DESCRIP TION R
l0l0l0l@l                                                                                                                      NA                                                                          l UOSs OF OR DAMAGE TO 4FACill1Y TYPE              DESCRIP'lON                                                                                                        PDR ADOCK 05000325 S
g ]@l                                                                                                                                          NA                                                PDR                        l r
7        8 9                      10                                                                                                                                                                                      80 ISSUE                DESCRIPTION
* i                                                                                                                                                                                        !        !!!!!!!!!!!
7        8 9                      10                                                                                                                                                68 69                                80 E NAME OF PREPARER                                                                                      ,
PHONE:                                                        0      l 1
              - - - - - . ,, .-                                . ,                , , - , . . .        _ , . -        , - . _ . , .          . -          .-,.,...,.,,.._n--,-..-                    -,-..-,n..,                  ,. I
 
_,  W''
LER ATTAC101ENT - RO #1-82-127 Facility: BSEP Unit No. 1-                                Event Date: November 3, 1982 On November 2, 1982, at 0920 hours, an LCO was-initiated on diesel generator No. I to permit the performance of periodic testing on the diesel.                    In accordance with technical specifications, quick start testing of the remaining diesel generators (Nos. 2, 3, and'4) was satisfactorily performed at 0055 hours on November 2, 1982, and at 2122 hours on November 2, 1982. The next-required quick start testing of the diesels was at 0920 hours on November 3, 1982; however, due-to personnel error, this performance was not accomplished until 2 hours and 39 minutes later.
l '
Upon issuing the LCO on diesel generator No. 1 on November 2, 1982, which initiated the quick starting requirement, the duty Operations Shift Foreman failed to ensure that a proper entry was made to the Control Operator's daily surveillance report (DSR) to reflect the once per every 12 hours requirement.
Therefore, only Control Operator log entries along with the shift turnovers were used to alert oncoming shift operators when the next required quick start                                        ,
test of the subject diesels came due. This event occurred due to the lack of the DSR entry and resultant oversight by the on-duty Shift Foreman and Control Operator to ensure the testing was performed when required.
Following discovery of this event, the required quick start testing of the diesels was performed at 1159 hours on November 3, 1982.                  In~ addition, proper entries were made to the DSR to ensure subsequent required quick start testing would be done within the specified testing frequency.
;        As a result of this event, all plant licensed Operations personnel will review this report to ensure their cognizance of the importance to make appropriate entries in the DSR to reflect additional testing requirements resulting from LCO conditions.
J e
9
      -                                -    ,  ,e- r ,- - g ,,~y <~---r-c  a--e-,,,          y  ,---e, , - - ---r -
                                                                                                                      -we--, -, -
}}
 
{{LER-Nav}}

Revision as of 09:45, 21 December 2020