4                                                                  June 1, 1988 s
Docket No. 50-460 Mr. D. W. Hazur, Managing Director Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968
 
==Dear Mr. Mazur:==
 
==SUBJECT:==
EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO REGULATORY GUIDE 1.97, REVISION 3 FOR WASHINGTON PUBLIC POWER SUPPLY-SYSTEM NUCLEAR PROJECT N0. 1 (WNP-1)
We have reviewed your responses of April 15, 1983 and February 6, 1986 to Generic Letter 82-33 concerning how WNP-1 meets the guidelines of Regulatory Guide R. G. 1.97 as applied to emergency response facilities. We have determined that the instrumentation provided for WNP-1 for meeting the recommendations of R. G. 1.97, Revisicn 3, for each post-accident monitoring variable are acceptable except for pressurizer heater status, emergency ventilation damper position, condenser air removal system exhaust and gland steam exhaust. R.G. 1.97 recommends Category 2 instrumentation to monitor the status of these systems. Therefore, we request your commitment within 60 days of the date of this letter to install Category 2 instrumentation to monitor the status of pressurizer heater status, emergency ventilation damper position, condenser air removal system exhaust and gland steam exhaust. Since WNP-1 is currently in deferred status, we request a commitment to provide a schedule and any subsequent changes in the schedule for installing such instrumentation when construction is restarted.
Our associated Safety Evaluation Report is enclosed.
Sincerely, original signed by Lester S. Rubenstein, Acting Director Standardization and Non-Power 8806170128 880601-                                Reactor Project Directorate PDR    ADOCK 05000460                          Division of Reactor Projects III, P                  PDR                                                                  'l IV, Y and Special Projects                !
Office of Nuclear Reactor Regulation
 
==Enclosure:==
 
Safety Evaluation Report cc: See next page Distribution:
            ; Docket File          OGC-Rockville NRC & Local'PDRs      EJordan PDSNP Reading        JPartlow DCrutchfield          ACRS (10)
EHylton              S. Newberry GVissing              B. Marcus PDSNP          PDSNPq 8          /
 
kR CIG fg                            UNITED STATES g              g              NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 5            tj June 1, 1988 b, * . . . p Docket No. 50-460 Mr. D. W. Mazur, Managing Director Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968
 
==Dear Mr. Mazur:==
 
==SUBJECT:==
EMERGENCY RESPONSE CAPADILITY - CONFORMANCE TO REGULATORY GUIDE 1.97, REVISION 3 FOR WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO. 1 (WNP-1)
We have reviewed your responses of April 15, 1983 and February 6, 1986 to Generic Letter 82-33 concerning how WNP-1 meets the guidelines of Regulatory Guide R. G. 1.97 as applied to emergency response facilities. We have determined that the instrumentation provided for WNP-1 for meeting the recommendations of R. 3.1.97, Revision 3, for each post-accident monitoring variable are acceptable except for pressurizer heater status, emergency ventilation damper position, condenser air removal system exhaust and gland steam exhaust. R.G. 1.97 recommends Category 2 instrumentation to monitor the status of these systems. Therefore, we request your commitment within 60 days of the date of this letter to install Category 2 instrumentation to monitor the status of pressurizer heater status, emergency ventilation damper position, condenser air removal system exhaust and gland steam exhaust. Since WNP-1 is currently in deferred status, we request a commitment to provide a schedule and any subsequent changes in the schedule for installing such instrumentation when construction is restarted.
Our associated Safety Evaluation Report is enclosed.
Sincerely, M
N        .hJQ            ^
ubenstein, Acting Director Lester S.
Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation
 
==Enclosure:==
Safety Evaluation Report                                                                              j 1
cc:    See next page                                                                                  ;
l l
 
: :                                                                        j Mr. D. W. Mazur                        WPPSS Nuclear Project No. 1 Washington Public Power Supply System  (WNP-1) Docket No. STN 50-460 cc:
Mr. Charles B. Brinkman                Mr. G. C. Sorensen, Manager Washington Nuclear Operations          Regulatory Programs Combustion Engineering, Inc.            Washington Public Power Supply ,
7010 Woodmont Avenue, Suite 1310          System                      i Bethesda, Maryland 20814                Post Office Box 968            i Richland, Washington 99352 Nicholas S. Reynolds, Esq.
Bishop, Cook, Furcell & Reynolds Law Offices 1400 L. Street, N.W.
. Washingtun, DC 20005-3502 G. E. Doupe, Esq.
Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98505 Mr. Douglas Coleman Washington Public Power Supply System P. O. box 1223 Elma, Washington 98541 Mr. William Region      Ang /WPPSS 3/5 Inspector U.S. Nuclear Regulatory Commission 1450 Maria Lane - Suite 210 Walnut Creek, California 94596 Mr. Eugene Rosolie, Director Coalition for Safe Power 408 Southwest Second Avenue Portland, Oregon 97204
                                                    ,}}

Latest revision as of 12:32, 17 December 2020

Forwards SER Re Util 830415 & 860206 Responses to Generic Ltr 82-33 on How Facility Meets Guidelines of Reg Guide 1.97 as Applied to Emergency Response Facilities.Util Should Provide Commitment to Install Category 2 Instrumentation
ML20155F975
Person / Time
Site: Washington Public Power Supply System
Issue date: 06/01/1988
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20155F979 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 GL-82-33, NUDOCS 8806170128
Download: ML20155F975 (3)


Text

___

4 June 1, 1988 s

Docket No. 50-460 Mr. D. W. Hazur, Managing Director Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968

Dear Mr. Mazur:

SUBJECT:

EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO REGULATORY GUIDE 1.97, REVISION 3 FOR WASHINGTON PUBLIC POWER SUPPLY-SYSTEM NUCLEAR PROJECT N0. 1 (WNP-1)

We have reviewed your responses of April 15, 1983 and February 6, 1986 to Generic Letter 82-33 concerning how WNP-1 meets the guidelines of Regulatory Guide R. G. 1.97 as applied to emergency response facilities. We have determined that the instrumentation provided for WNP-1 for meeting the recommendations of R. G. 1.97, Revisicn 3, for each post-accident monitoring variable are acceptable except for pressurizer heater status, emergency ventilation damper position, condenser air removal system exhaust and gland steam exhaust. R.G. 1.97 recommends Category 2 instrumentation to monitor the status of these systems. Therefore, we request your commitment within 60 days of the date of this letter to install Category 2 instrumentation to monitor the status of pressurizer heater status, emergency ventilation damper position, condenser air removal system exhaust and gland steam exhaust. Since WNP-1 is currently in deferred status, we request a commitment to provide a schedule and any subsequent changes in the schedule for installing such instrumentation when construction is restarted.

Our associated Safety Evaluation Report is enclosed.

Sincerely, original signed by Lester S. Rubenstein, Acting Director Standardization and Non-Power 8806170128 880601- Reactor Project Directorate PDR ADOCK 05000460 Division of Reactor Projects III, P PDR 'l IV, Y and Special Projects  !

Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation Report cc: See next page Distribution:

Docket File OGC-Rockville NRC & Local'PDRs EJordan PDSNP Reading JPartlow DCrutchfield ACRS (10)

EHylton S. Newberry GVissing B. Marcus PDSNP PDSNPq 8 /

kR CIG fg UNITED STATES g g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 5 tj June 1, 1988 b, * . . . p Docket No. 50-460 Mr. D. W. Mazur, Managing Director Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968

Dear Mr. Mazur:

SUBJECT:

EMERGENCY RESPONSE CAPADILITY - CONFORMANCE TO REGULATORY GUIDE 1.97, REVISION 3 FOR WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO. 1 (WNP-1)

We have reviewed your responses of April 15, 1983 and February 6, 1986 to Generic Letter 82-33 concerning how WNP-1 meets the guidelines of Regulatory Guide R. G. 1.97 as applied to emergency response facilities. We have determined that the instrumentation provided for WNP-1 for meeting the recommendations of R. 3.1.97, Revision 3, for each post-accident monitoring variable are acceptable except for pressurizer heater status, emergency ventilation damper position, condenser air removal system exhaust and gland steam exhaust. R.G. 1.97 recommends Category 2 instrumentation to monitor the status of these systems. Therefore, we request your commitment within 60 days of the date of this letter to install Category 2 instrumentation to monitor the status of pressurizer heater status, emergency ventilation damper position, condenser air removal system exhaust and gland steam exhaust. Since WNP-1 is currently in deferred status, we request a commitment to provide a schedule and any subsequent changes in the schedule for installing such instrumentation when construction is restarted.

Our associated Safety Evaluation Report is enclosed.

Sincerely, M

N .hJQ ^

ubenstein, Acting Director Lester S.

Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation Report j 1

cc: See next page  ;

l l

: j Mr. D. W. Mazur WPPSS Nuclear Project No. 1 Washington Public Power Supply System (WNP-1) Docket No. STN 50-460 cc:

Mr. Charles B. Brinkman Mr. G. C. Sorensen, Manager Washington Nuclear Operations Regulatory Programs Combustion Engineering, Inc. Washington Public Power Supply ,

7010 Woodmont Avenue, Suite 1310 System i Bethesda, Maryland 20814 Post Office Box 968 i Richland, Washington 99352 Nicholas S. Reynolds, Esq.

Bishop, Cook, Furcell & Reynolds Law Offices 1400 L. Street, N.W.

. Washingtun, DC 20005-3502 G. E. Doupe, Esq.

Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98505 Mr. Douglas Coleman Washington Public Power Supply System P. O. box 1223 Elma, Washington 98541 Mr. William Region Ang /WPPSS 3/5 Inspector U.S. Nuclear Regulatory Commission 1450 Maria Lane - Suite 210 Walnut Creek, California 94596 Mr. Eugene Rosolie, Director Coalition for Safe Power 408 Southwest Second Avenue Portland, Oregon 97204

,