{{Adams
#REDIRECT [[IR 05000275/2012404]]
| number = ML12251A390
| issue date = 09/07/2012
| title = IR 05000275-12-404 and 05000323-12-404, 8/9/2012, Diablo Canyon Power Plant, Units 1 and 2, Cover Letter
| author name = Hay M C
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Halpin E D
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| contact person =
| document report number = IR-12-404
| document type = Letter
| page count = 4
}}
See also: [[followed by::IR 05000275/2012404]]
 
=Text=
{{#Wiki_filter:" " September 7, 2012 Mr. Edward Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
 
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2012404 AND 05000323/2012404
 
==Dear Mr. Halpin:==
On August 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 9, 2012, with you and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
Two NRC identified findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) were identified during this inspection. The deficiencies were promptly corrected or compensated for and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the area.
 
Both of these findings were determined to involve violations of NRC requirements. If you contest any NCV in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at Diablo Canyon Power Plant. One cross-cutting aspect was assigned to a finding in the area of Human Performance [H.4(c)]. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at Diablo Canyon Power Plant.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,/RA/ Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety
 
Docket: 50-275; 50-323 License: DPR-80; DPR-82 Nonpublic
 
===Enclosure:===
NRC Inspection Report 05000275/2012403 and 05000323/2012403
 
===w/Attachment:===
Supplemental Information
 
cc w/enclosure: Michael V. Priebe Pacific Gas and Electric Company Diablo Canyon Power Plant Mail Code 104/5/508 P.O. Box 56 Avila Beach, CA 93424
 