05000423/LER-1996-015, Forwards LER 96-015-04,documenting Condition Determined at Unit 3 on 960610.Util Commitments in Response to Event Contained within Attachment 1 to Ltr: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000423/LER-1996-015, Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted]]
| number = ML20138J795
| issue date = 05/01/1997
| title = Forwards LER 96-015-04,documenting Condition Determined at Unit 3 on 960610.Util Commitments in Response to Event Contained within Attachment 1 to Ltr
| author name = Hicks G
| author affiliation = NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000423
| license number =
| contact person =
| document report number = B16276, NUDOCS 9705090020
| package number = ML20138J798
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 5
}}
{{LER
| Title = Forwards LER 96-015-04,documenting Condition Determined at Unit 3 on 960610.Util Commitments in Response to Event Contained within Attachment 1 to Ltr
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000423
| LER year = 2096
| LER number = 15
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:.--        .
Hole Fem H<ldHouse 1">S Watufoni, CM3385
    ; /h/p) Northe:st Nuclear Energy                                              slaisione Nudcar Power Station Northeast Nudear Energy Company P.O. Ibs 128 Waterford, Ur 06385-0128 (860) 447-1791                              '
Fax (860) 444-4277 The Northeast Utilitice System May 1,1997 Docket No. 50-423 B16276              '
Re: 10CFR50.73(a)(2)(i)(B) 10CFR50.73(a)(2)(v)(D)                        ;
10CFR50.73(a)(2)(vii)
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555                                                                                          ,
Millstone Nuclear Power Station Unit 3                                              ,
Licensee Event Report 96-015-04 Submitted Pursuant to 10CFR50.73(a)(2)(i)(B) 10CFR50.73(a)(2)(v)(D) 10CFR50.73(a)(2)(vii)
This letter forwards Supplement 4 to Licensee Event Report 96-015-00,
        - documenting a condition that was determined at Millstone Unit No. 3 on June 10, 1996. This LER is submitted pursuant to 10CFR50.73(a)(2)(i)(B),
10CFR50.73(a)(2)(v)(D), and 10CFR50.73(a)(2)(vii). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.
Should you have any questions regarding this submittal, please contact Mr.
James M. Peschel at (860) 437-5840.                                                                            )
l                                                                                                                        !
i Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY                                                    -
f        2}
r 9705090020 970501 PDR    ADOCK 05000423                            A        f)
                                                            -jw
!  s                    PDR      ,                  Mo Unit Director, Millstone Unit No. 3
      ~
                                                        ! (! ! !    !,! ,!! !
 
U.S. Nucinar Rcgulatory Commission
            !    B16276/Page 2                                                                                ,
 
==Attachment:==
: 1)              NNECO's commitments in response to LER 96-015-04
: 2)        LER 96-015-04 cc:  H. J.          Miller, Region i Administrator A. C Cerne, Senior Resident Inspector, Millstone Unit No. 3                            ;
l                        J. W. Andersen, NRC Project Manager, Millstone Unit No. 3                              i W. D. Travers, Dr., Director, Special Projects                                        '
i i
t 1-i t
i l
t l
k l
i                                                                                                              I
(
t i
(
I
 
I i
Docket No. 50-423                    l B16276          i e
r t
i i
t Attachment 1 i
Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments In Response To (LER 96-015-04) i l
l l
l                                                                                                                                      May 1,1997 3
q l
:                                                                    Enclosure
!                                                    List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Any other actions discussed in the submittal represent intended or
;                  planned actions by NNECO. They are described to the NRC for the NRC's                                                      ;
information and are not regulatory commitments. Please notify the Manager -                                                t Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions                                      :
regarding this document or any associated regulatory commitments.                                                          l
;                                                                                                                                              i Number                                Commitment                                  Due                              !
B15964-02            Identified electrical separation deviations              Prior to entry into                        l will be corrected or restored to compliance                    Mode 4                              l with the design basis.                                                                              l 3
I I
i I
l e
 
t Docket No. 50-423 B16276        ,
9 t
?
l Attachment 2 i
Millstone Nuclear Power Station, Unit No. 3                                                                    i NNECO's Submittal of                                                                          ;
L                                                  (LER 96-015-04)                                                                            1 1
l r
i l
i                                                                                                                    May 1,1997            ;
i j
_                                              .__ _                        ..    .
}}
 
{{LER-Nav}}

Revision as of 08:18, 20 November 2020