ML20126K571: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:' | ||
, / -?- Distribution: | |||
/ NRC PDR AE0D CF AEOD SF NAS CF C. J. Heltemes dA 15 E T. I. Ippolito K. Black G. Trager Dr. Zack Pate, President Institute of Huclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 | |||
==Dear Dr. Pate:== | |||
==SUBJECT:== | |||
REQUEST FOR PEER REVIEW COMMENTS OH PRELIMINARY CASE STUDY REPORT - LOSS OF SAFETY SYSTEM FUNCTION EVENTS The Office for Analysis and Evaluation of Operational Data has completed a case study of events involving a total loss of safety system function (LSSF). | |||
The study identified 133 LSSF events in the 1981 to June 1984 time period, 87 of which (65%) were the result of human factors considerations. | |||
Although the study found no evidence of any previously unrecognized safety problems, it also found no clear evidence that a large improvement is being made, on an industry-wide basis, in preventing loss of safety system events. | |||
Therefore, it is recommended that the results of the study be fed back to industry and to the Regions for possible use in the SALP process. In addition, it is reconnended that training and qualifications development programs consider the types of personnel actually involved in LSSF events. | |||
In accordance with AE0D's " peer review" process, prior to the finalization and distribution of our case study reports, we are providing NRR, IE, Regional Offices, RES, HSAC, and INP0 with a copy of a prelininary report for review and comment, particularly regarding accuracy and completeness of the technical details. Changes to the findings, conclusions, and reconmendations will be considered only if the underlying information concerning the details of plant design, systems operation or sequence of events is in error. Therefore, comments are being solicited on the technical accuracy of the report. The findings, conclusions and recommendations are provided for your information in order that you may understand the significance which AE00 places on this issue and, therefore, obtain a more conplete picture of the total report. We would welcome comments either f informally by phone or fomally by memorandum. ,- M Since we wish to finalize and issue the report shortly, we ask that any y' ' | |||
conaents be received by us within 30 days from receipt of the preliminary Na , 3.) | |||
report. Should your office require some additional time beyond that point, please let us know, otherwise it will be assumed that there are no comments b fg.gth g | |||
omu > 8507300334 B50715 PDR ORG EPSINPO - | |||
.u .- > PDR DIT;3 > | |||
MC PORM MS 00-80) NRCM ONO OFFICIAL RECORD COPY | |||
= cmp - | |||
=y =g ;,3 p- a ._y =y (f.Q T m; r' | |||
~~ | |||
4 Dr. Zack Pate JUL 151985 As you may know, AEOD reports do not represent an official NRC position or the position of the responsible HRC progran office. Our reports are one input to an ongoing review and evaluation precess, and any recoamendation contained in our final report will be considered and perhaps modified or eliminated by the responsible ilRC office. | |||
We are placing a copy of the preliminary report in the Public Document Room. If you or your staff have any questions regarding this matter, please contact Gene Trager of my staff. ifr. Trager can be reached at (301) 492-4495. | |||
Sincerely, onginal S,gned by C. J. Hettemes, Jr. | |||
C. J. Heltenes, Jr., Director Office for Analysis and Evaluation of Operational Data | |||
==Enclosure:== | |||
As Stated gse #4 gg/fg cc w/ enclosure: | |||
See Attached List omer) .NAS. . . . ...... | |||
. . . .Qg.T C/NAS M D KBla | |||
. CJ | |||
. . .e...y [teme s.j..... . .. .... ... ... ..... .. . ......... .... | |||
cuwwi> . .ETrager: ch .. .. .... ..... . | |||
of.u k 7/\.1./85 7/* | |||
. . . . . . . .\. . 8 5 7/g65 7/ | |||
. . . . t. # 5 nac roau ma no soinacu o24o OFFICIAL RECORD COPY c u.s. mo un-4co.247 | |||
. , . . .....s-.~.+.. | |||
2 JUL 151985 cc w/ enclosure: | |||
tir. H. B. Tucker, Chairman lir. A. Lundvall - | |||
Babcock & Wilcox Owners' Group Vice President, Supply Vice President, Nuclear Production Baltinore Gas and Electric Company Duke Power Company GSE Building P.O. Box 33189 P.O. Box 1475 422 Church Street Bal timore,11D 21203 Charl otte , ' NC 28242 lir. R. Wells, Chairman tir. William D. Harrington Combustion Engineering Owners' Group Senior Vice President, Nuclear Northeast Utilities Service Company Boston Edison Company P.O. Box 270 800 Boylston Street Hartford, CT 06101 Boston,i1A 02199 Itr. Jack Fulton, Chairman General Electric Owners' Group Mr. E. E. Utley Boston Edison Company Senior Executive Vice President Nuclear Operations Department Power Supply and Engineering & Constructiol 25 Braintree Hill Office Park Carolina Power and Light Company Braintree, MA 02184 P.O. Box 1551 a | |||
Raleigh, NC 27602 | |||
!!r. J. Sheppard, Chairman Westinghouse Owners' Group lIr. L. Ferrar Carolina Power and Light Company Director of Nuclear Licensing 336 Fayetteville Street Commonwealth Edison Company Raleigh, NC 27602 P.O. Box 767 Chicago, Illinois 60690 Mr. R. Borsum Babcock & Wilcox lir. J. W. Williams, Jr. | |||
Nuclear Power Generation Division Group Vice President Suite 220- Nuclear Energy Department 7910 Woocmont Avenue Florida Power & Light Company Bethesda,t1D 20814 P.O. Box 14000 Juno Beach, FL 33408 Dr. P. McGill, President Combustion Engineering, Inc. 11r. W. Wilgus, Vice President 1000 Prospect Hill Road Nuclear Operations Windson, CT 06095 Florida Power Corporation P.O. Box 14042, M.A.C. H-2 Ilr. Lawrence S. Gifford St. Petersburg, FL 33733 General Electric Company Nuclear Energy Operations Mr. J. T. Beckham, Jr., Vice President Safety and Licensing Operation Nuclear-Generation 7910 Woodmont Avenue, Suite 203 Georgia Power Company Bethesda, MD 20814 P.O. Box 4545 Atlanta, GA 30302 Mr. E. Rahe kuclear Safety Department , | |||
Nuclear Technology Division Westinghouse Electric Corporation Cox 355 Pittsburgh, PA 15230 | |||
4- - . | |||
cc w/ enclosure: | |||
(continued) _ | |||
Hr. J. Dolan, Vice President tir. C. McNeill, Jr. | |||
Indiana and 111chigan Electric Company Vice President, Nuclear c/o American Electric Service Corporation Public Service Electric & Gas Company 1 Riverside Plaza P.O. Box 236 Columbus, OH 43215 Hancocks Bridge, NJ 08038 fir. Lee Lill ttr. K. Baskin, Vice President Chairman of the Board and Nuclear Engineering Chief Executive Officer Safety and Licensing Department Iowa Electric Light and Power Company Southern California Edison Company P.O. Box 351 P.O. Box 800 Cedar Rapids, IA 52406 2244 Walnut Grove Avenue Rosemead, CA 91770 lir. Jackson B. Richard Senior Vice President Mr. Hugh Parris Nuclear Department Manager of Power | |||
. 111ssissippi Power and Light Company Tennessee Valley Authority P.O. Box 23054 500A Chestnut Street, Tower II Jackson, MS 39205 Chattanooga, TN 37401 Mr. John C. Brons Mr. W. Stewart, Vice President Senior Vice President Nuclear Operations . | |||
Nuclear Generation Virginia Electric and Power Company New York Power Authority P.O. Box 26666 123 Main Street Richmond, VA 23261 White Plains, NY 10601 Mr. John F. Opeka Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company P.O. Box 270 Hartford, CT 06141-0270 Mr. Edward G. Bauer, Jr. | |||
Vice President and General Counsel Philadelphia Electric Company 2301 Market Street Philadelphia, PA 19101 Mr. Bart Withers Vice President, Nuclear Portland General Electric Company 121 S.W. Salmon Street Portland, OR 97204}} |
Latest revision as of 20:18, 23 July 2020
ML20126K571 | |
Person / Time | |
---|---|
Issue date: | 07/15/1985 |
From: | Heltemes C NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD) |
To: | Pate Z INSTITUTE OF NUCLEAR POWER OPERATIONS |
References | |
NUDOCS 8507300334 | |
Download: ML20126K571 (4) | |
Text
'
, / -?- Distribution:
/ NRC PDR AE0D CF AEOD SF NAS CF C. J. Heltemes dA 15 E T. I. Ippolito K. Black G. Trager Dr. Zack Pate, President Institute of Huclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339
Dear Dr. Pate:
SUBJECT:
REQUEST FOR PEER REVIEW COMMENTS OH PRELIMINARY CASE STUDY REPORT - LOSS OF SAFETY SYSTEM FUNCTION EVENTS The Office for Analysis and Evaluation of Operational Data has completed a case study of events involving a total loss of safety system function (LSSF).
The study identified 133 LSSF events in the 1981 to June 1984 time period, 87 of which (65%) were the result of human factors considerations.
Although the study found no evidence of any previously unrecognized safety problems, it also found no clear evidence that a large improvement is being made, on an industry-wide basis, in preventing loss of safety system events.
Therefore, it is recommended that the results of the study be fed back to industry and to the Regions for possible use in the SALP process. In addition, it is reconnended that training and qualifications development programs consider the types of personnel actually involved in LSSF events.
In accordance with AE0D's " peer review" process, prior to the finalization and distribution of our case study reports, we are providing NRR, IE, Regional Offices, RES, HSAC, and INP0 with a copy of a prelininary report for review and comment, particularly regarding accuracy and completeness of the technical details. Changes to the findings, conclusions, and reconmendations will be considered only if the underlying information concerning the details of plant design, systems operation or sequence of events is in error. Therefore, comments are being solicited on the technical accuracy of the report. The findings, conclusions and recommendations are provided for your information in order that you may understand the significance which AE00 places on this issue and, therefore, obtain a more conplete picture of the total report. We would welcome comments either f informally by phone or fomally by memorandum. ,- M Since we wish to finalize and issue the report shortly, we ask that any y' '
conaents be received by us within 30 days from receipt of the preliminary Na , 3.)
report. Should your office require some additional time beyond that point, please let us know, otherwise it will be assumed that there are no comments b fg.gth g
omu > 8507300334 B50715 PDR ORG EPSINPO -
.u .- > PDR DIT;3 >
MC PORM MS 00-80) NRCM ONO OFFICIAL RECORD COPY
= cmp -
=y =g ;,3 p- a ._y =y (f.Q T m; r'
~~
4 Dr. Zack Pate JUL 151985 As you may know, AEOD reports do not represent an official NRC position or the position of the responsible HRC progran office. Our reports are one input to an ongoing review and evaluation precess, and any recoamendation contained in our final report will be considered and perhaps modified or eliminated by the responsible ilRC office.
We are placing a copy of the preliminary report in the Public Document Room. If you or your staff have any questions regarding this matter, please contact Gene Trager of my staff. ifr. Trager can be reached at (301) 492-4495.
Sincerely, onginal S,gned by C. J. Hettemes, Jr.
C. J. Heltenes, Jr., Director Office for Analysis and Evaluation of Operational Data
Enclosure:
As Stated gse #4 gg/fg cc w/ enclosure:
See Attached List omer) .NAS. . . . ......
. . . .Qg.T C/NAS M D KBla
. CJ
. . .e...y [teme s.j..... . .. .... ... ... ..... .. . ......... ....
cuwwi> . .ETrager: ch .. .. .... ..... .
of.u k 7/\.1./85 7/*
. . . . . . . .\. . 8 5 7/g65 7/
. . . . t. # 5 nac roau ma no soinacu o24o OFFICIAL RECORD COPY c u.s. mo un-4co.247
. , . . .....s-.~.+..
2 JUL 151985 cc w/ enclosure:
tir. H. B. Tucker, Chairman lir. A. Lundvall -
Babcock & Wilcox Owners' Group Vice President, Supply Vice President, Nuclear Production Baltinore Gas and Electric Company Duke Power Company GSE Building P.O. Box 33189 P.O. Box 1475 422 Church Street Bal timore,11D 21203 Charl otte , ' NC 28242 lir. R. Wells, Chairman tir. William D. Harrington Combustion Engineering Owners' Group Senior Vice President, Nuclear Northeast Utilities Service Company Boston Edison Company P.O. Box 270 800 Boylston Street Hartford, CT 06101 Boston,i1A 02199 Itr. Jack Fulton, Chairman General Electric Owners' Group Mr. E. E. Utley Boston Edison Company Senior Executive Vice President Nuclear Operations Department Power Supply and Engineering & Constructiol 25 Braintree Hill Office Park Carolina Power and Light Company Braintree, MA 02184 P.O. Box 1551 a
Raleigh, NC 27602
!!r. J. Sheppard, Chairman Westinghouse Owners' Group lIr. L. Ferrar Carolina Power and Light Company Director of Nuclear Licensing 336 Fayetteville Street Commonwealth Edison Company Raleigh, NC 27602 P.O. Box 767 Chicago, Illinois 60690 Mr. R. Borsum Babcock & Wilcox lir. J. W. Williams, Jr.
Nuclear Power Generation Division Group Vice President Suite 220- Nuclear Energy Department 7910 Woocmont Avenue Florida Power & Light Company Bethesda,t1D 20814 P.O. Box 14000 Juno Beach, FL 33408 Dr. P. McGill, President Combustion Engineering, Inc. 11r. W. Wilgus, Vice President 1000 Prospect Hill Road Nuclear Operations Windson, CT 06095 Florida Power Corporation P.O. Box 14042, M.A.C. H-2 Ilr. Lawrence S. Gifford St. Petersburg, FL 33733 General Electric Company Nuclear Energy Operations Mr. J. T. Beckham, Jr., Vice President Safety and Licensing Operation Nuclear-Generation 7910 Woodmont Avenue, Suite 203 Georgia Power Company Bethesda, MD 20814 P.O. Box 4545 Atlanta, GA 30302 Mr. E. Rahe kuclear Safety Department ,
Nuclear Technology Division Westinghouse Electric Corporation Cox 355 Pittsburgh, PA 15230
4- - .
cc w/ enclosure:
(continued) _
Hr. J. Dolan, Vice President tir. C. McNeill, Jr.
Indiana and 111chigan Electric Company Vice President, Nuclear c/o American Electric Service Corporation Public Service Electric & Gas Company 1 Riverside Plaza P.O. Box 236 Columbus, OH 43215 Hancocks Bridge, NJ 08038 fir. Lee Lill ttr. K. Baskin, Vice President Chairman of the Board and Nuclear Engineering Chief Executive Officer Safety and Licensing Department Iowa Electric Light and Power Company Southern California Edison Company P.O. Box 351 P.O. Box 800 Cedar Rapids, IA 52406 2244 Walnut Grove Avenue Rosemead, CA 91770 lir. Jackson B. Richard Senior Vice President Mr. Hugh Parris Nuclear Department Manager of Power
. 111ssissippi Power and Light Company Tennessee Valley Authority P.O. Box 23054 500A Chestnut Street, Tower II Jackson, MS 39205 Chattanooga, TN 37401 Mr. John C. Brons Mr. W. Stewart, Vice President Senior Vice President Nuclear Operations .
Nuclear Generation Virginia Electric and Power Company New York Power Authority P.O. Box 26666 123 Main Street Richmond, VA 23261 White Plains, NY 10601 Mr. John F. Opeka Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company P.O. Box 270 Hartford, CT 06141-0270 Mr. Edward G. Bauer, Jr.
Vice President and General Counsel Philadelphia Electric Company 2301 Market Street Philadelphia, PA 19101 Mr. Bart Withers Vice President, Nuclear Portland General Electric Company 121 S.W. Salmon Street Portland, OR 97204