05000416/LER-1982-109, Forwards LER 82-109/03L-0: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000416/LER-1982-109]]
| number = ML20069Q447
| issue date = 12/01/1982
| title = Forwards LER 82-109/03L-0
| author name = Mcgaughy J
| author affiliation = MISSISSIPPI POWER & LIGHT CO.
| addressee name = Oreilly J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000416
| license number =
| contact person =
| document report number = AECM-82-575, NUDOCS 8212090078
| package number = ML20069Q449
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
}}
{{LER
| Title = Forwards LER 82-109/03L-0
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000416
| LER year = 2082
| LER number = 109
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:7 e  .
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 18 4 0, J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 December 1, 1982                              f YsiErT$NUoI',$"                                                                    .
Office of Inspection & Enforcement                                          d        - %
U. S. Nuclear Regulatory Counnission                                          d      (,
Region II 101 Marietta St., N.W.,    Suite 3100                                          h      .
8 tilanta, Georgia 30303                                                          ..        -.*
Attention:    Mr. J. P. O'Reilly, Regional Administrator                          #
 
==Dear Mr. O'Reilly:==
 
==SUBJECT:==
Grand Gulf Nucler.r Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Inoperable Division III Diesel Generator LER 82-109/03 L-0 AECM-82/575 While conducting the Division III diesel generator surveillance test on November 11, 1982, it was observed that the ait start receiver pressure was less than the required 175 psig. This report is being submitted pursuant to Technical Specificatfon 3.8.1.2.      Attached ic an interim report, LER 82-109/03 L-0.
Yours truly, y 4 JPM: sap Attachment                            j ,f b y-  [ k h ee uj[y #7N
                                                /
cc:  Mr. N. L. Stampley (w/a)
Mr. R. B. McGehee (w/o)
Mr. T. B. Ccnner (w/o)
Mr. G. B. Taylor (w/o)
Mr. Richard C. DeYoung, Director (w/a)
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)
                " . S. Nuclear Regulatory Commiscion Washington, D. C. 20555 8212090078 821201                                                                M PDR ADOCK 05000416                                                  ONGCIA1, COT")P, S                  PDR Member Middle South Utilities System        J 8' A b
                                                                                  .
}}
 
{{LER-Nav}}

Latest revision as of 01:55, 24 May 2020