ML20065J008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:}}
j;            .
VERMONT.. YANKEE MCCLEAR POWER' CORPORATION.-
t P.O. Box 157. Governor Hunt Road
                        ,~-
j                                  Vernon, Vermont 05354-0157-                                                      !
f      }
j ,.          (802) 257-7711 i        --
f
(
April 10,1994 VY-RCE-94-009                                  i BVY 94-39                                    ;
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn:            Document Control Desk -
 
==Reference:==
a)      License No. DPR-28 (Docket No. 50-271)              *
 
==Dear Sir:==
 
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of March.1994.
Very tally yours, Vermont Yankee Nuclear Power Corp.
Al' Donald A. Reid Vice President, Operations                    >
cc:        USNRC, Region I USNRC Resident Inspector, VYNPS P
f 180006 9404150252 940331 PDR      ADOCK 05000271
                                                                                                              \      '
R.                      PDR
 
4 l
t l
l l                      VERMONT YANKEE NUCLEAR POWER STATION                                                  -
l                                MONTIILY STATISTICAL REPORT 94-03
(
FOR TIIE MONTII OF MARCII 1994 t
l I
i DP 0411 Rev. 5 Page 1 of 1
 
                  .                            OPERATING DATA REPORT
                    .                                                          DOCKET NO.50-271 DATE 940410 COMPLETED BY G.A. WALLIN TELEPHONE (802)257-7711 OPERATING STATUS
: 1. Unit Name:      Vermont Yankee
: 2. Reporting Period:      March                  NOTES:
: 3. Licensed Thermal Power (MWt):1593
: 4. Nameplate Rating (Gross MWe) : 14Q                                                                        ,
: 5. Design Electrical Rating (Net MWe):    514(oc) 504 (cc)
: 6. Maximum Dependable Capacity (Gross MWe) :    11E
: 7. Maximum Dependable Capacity (Net MWe):        50A
: 8. If changes, occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A
: 9. Power level to which restricted, if any(Net MWe):          N/A
: 10. Reasons for restrictions, if any:                  N/A This Month        Yr-to-Date                      Cumulative
: 11. Hours in Reporting Period                    744.00          2160.00                            186984.00
: 12. Number Of Hours Reactor was Critical        744.00          2160.00                            153377.41
: 13. Reactor Reserve Shutdown Hours                0.00              0.00                                0.00
: 14. Hours Generator On-Line
* 744.00          2154.35                            150269.97
: 15. Unit Reserve Shutdown Hours                    0.0Q_            0.00                                0.00
: 16. Gross Thermal Energy Generated (MWH)  1_167695.00        3399641.00 224105312.50
: 17. Gross Electrical Energy Generated        395437.00      1151755.00 74671137.00
: 18. Net Electrical Energy Generated (MWH)    380313.00      1107360.00 70954384.00
: 19. Unit Service Factor                          100.00            99.74                              79.64
: 20. Unit Availability Factor                    100.00            99.74                              79.64 ,
: 21. Unit Capacity Factor (Using MDC Net)          101.42          101.72                                74.61
: 22. Unit Capacity Factor (Using DER Net)          99.45            99.74                              73.16
: 23. Unit Forced Outage Rate                        1.51              0.79                                5.12
: 24. Shutdowns scheduled over next 6 months (Type, Date, and Duration of Each:  N/A
: 25. If shut down at end of report period, estimated date of startup:N/A
: 26. Units In Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 DP 0411 Rev. 5 Page 1 of 1 RT No. 13.F01.19F
 
l AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO. 50-271 UNIT Vermont Yankee DATE 940410            l COMPLETED BY G.A. WALLIN TELEPHONE  (802)257-7711 :
MONTH      March DAY    AVERAGE DAILY POWER LEVEL      DAY    AVERAGE DAILY POWER LEVEL (MWe-Net)                            (MWe-Net)
: 1.              519                  17.            494
: 2.              519                  18.            490
: 3.            519                  19.            519
: 4.              520                  20.            520                      ,
: 5.            519                  21.            529
: 6.            519                  22.            519
: 7.            519                  23.            519
: 8.            519                  24.            519
: 9.            519                  25.            520
: 10.              519                  26.            520
: 11.              519                  27.            519
: 12.              519                  28.            519 13,              519                  29.            519                        i l
: 14.              519                  30.            519
: 15.              333                  31.            519
: 16.              514 l INSTRUCTIONS:                                                                    l l
On this format, list the average daily unit power level in MWE-Net                j for each day in the reporting month. Compute to the nearest whole                !
megawatt.
VYDPF 0411.02 DP 0411 Rev. 5 Page 1 of 1                                                                      !
RT No. 13,F01.18V I                                                                                  i
 
4 s                        .
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                                                                                                        -
REPORT MONTH    MARCH                                              DOCKET NO 50-271 UNIT NAME Vermont' Yankee DATE 940410 COMPLETED BY G.A. Wallin TELEPHONE (802)257-7711 1                                                                                      2        3                            4                  5 No.        Date              Type  Duration                                                                        Reason  Method of    License    System                  Component                          Cause and Corrective (hours)                                                                              Shutting      Event      Code                    Code                              Action to Prevent Down          Report #                                                              Recurrence Reactor 94-03 940315                  S                    0.00                                                            B,H*        4          N/A      RB                    CONROD    Surveillance testing Power                                                      and a Rod Pattern Reduction                                                  Exchange 94-03 940315                  F        11.42                                                                          A        4          N/A      CD                    VALVOP    MSIV-80B closure Power                                                      timing out of Reduction                                                    specification. Speed adjustment made to correct deficient time 1    F: Forced                    2 Reason:                                                                                                    3 Method:                              4 Exhibit G- Instructions S: Scheduled                    A-Equipment Failure (Explain)                                                                                1 - Manual                            for Preparation of Data B-Maintenance or Test                                                                                        2 - Manual Scram                      Entry Sheets for License C-Refueling                                                                                                  3 - Automatic Scram                    Event Report (LER) File D-Regulatory Restriction                                                                                    4 - Other (Explain)                    (NUREG 0161)
E-Operator Training and License Examination                                                                                                                          5 Exhibit I - Same Source VYDPF 0411.03                          F-Administrative DP 0411 Rev. 5                        G-Operational Error (Explain)
Page 1 of 1                          *H-(Explain) - Control Rod Pattern Exchange u_______._______  _. _ _ _ _ _ _ _ _    _      . . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                          __  _    _ . _ _ _ _ _ _ _ _ _            _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _                _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _
 
DOCKET NO. 50-271        I DATE  940410        i l  .,                                                  COMPLETED BY G.A. WALLIN      l TELEPHONE  (802)257-7711 !
REPORT MONTH    March
 
==SUMMARY==
OF OPERATING EXPERIENCES Highlichts Vermont Yankee operated at 99.5% of rated thermal power for the month.
Gross electrical generation was 395.437 MWHe or 98.4% design electrical          i capacity.
Operatino Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 99.9%
of rated thermal power.                                                          ,
940315    At 0405 hours, initiated a power reduction to minimum recirculation flow to perform surveillance testing, and a rod pattern exchange.
!  940315    At 0430 hours, initiated turbine bypass valve testing. (See Unit Shutdowns and Power Reductions) 940315    At 0533 hours, completed turbine bypass valve testing.
i  940315    At 0601 hours, at minimum recirculation flow, initiated MSIV testing.
MSIV-80B closure time was not within specification.    (See Unit Shutdowns and Power Reductions) 940315    At 0620 hours, initiated a rod pattern exchange.  (See Unit Shutdowns l            and Power Reductions) 1 940315    At 0715 hours, completed the rod pattern exchange.
940315    At 1448 hours, and 40% power, initiated a drywell entry to perform a speed adjustment on MSIV-80B.
l l  940315    At 1840 hours, completed speed adjustment to MSIV-80B.
,                                                                                    f 940315    At 1858 hours, completed MSIV testing and began a return to full power.
l l
l At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 DP 0411 Rev. 5                                                                    !
Page 1 of 1 RT No. 13.F01.18X                                                                j i
l}}

Revision as of 22:20, 30 March 2020

Monthly Operating Rept for Mar 1994 for Vermont Yankee Nuclear Power Station.W/940410 Ltr
ML20065J008
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/31/1994
From: Reid D, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-94-39, VY-RCE-94-009, VY-RCE-94-9, NUDOCS 9404150252
Download: ML20065J008 (6)


Text