L-2009-523, 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I018248: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[DCL-2009-523, 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I018248]]
| number = ML091910456
| issue date = 06/11/2009
| title = 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I018248
| author name = Peters K
| author affiliation = Pacific Gas & Electric Co
| addressee name =
| addressee affiliation = NRC/NRR, State of CA, Regional Water Quality Control Bd
| docket = 05000275, 05000323
| license number =
| contact person =
| case reference number = 340I018248, DCL-2009-523
| document type = Annual Operating Report, Environmental Monitoring Report, Letter type:L
| page count = 83
}}
 
=Text=
{{#Wiki_filter:*PacificElectricGas R                  and Company' Diablo Canyon Power Plant P.0. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-2009-523 Electronic Submission PDF Formatted File June 11, 2009 California Regional Water Quality Control Board Central Coast Region 895 Aerovista, Suite #101 San Luis Obispo, CA 93401-7906 Attn: Storm Water Division 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (DCPP), Facility WDID No. 3401018248 Enclosed is the DCPP Annual Report for Storm Water Discharges Associated with Industrial Activities. The report includes data collected through June 02, 2009 which satisfies all requirements for the Reporting Period July 1, 2008 through June 30, 2009.
The report has been completed in accordance with DCPP's commitment to implement provisions of the State General Industrial Storm Water Permit (General Permit) as outlined in PG&E letter DCL-2006-556 dated November 09, 2006 to the Regional Water Quality Control Board, Central Coast Region.
If you have any questions or concerns regarding the enclosed report, or require additional information, please contact Trevor Rebel of my staff at (805) 545-3607.
Sincerely,
                            - Diablo Canyon Power Plant 2009523/tdr/dlb Enclosure (1)
WA
 
PG&E Letter DCL-2009-523 CCRWQCB Storm Water Division June 11, 2009 Page 2 cc: w/enclosure    PDF Formatted Electronic File Copy:
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 California Department of Fish and Game 20 Lower Ragsdale, Suite 100 Monterey, CA 93940 Hardcopy Format:
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Michael S. Peck Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5
 
State of California STATE WATER RESOURCES CONTROL BOARD 2008-2009 ANNUAL REPORT FOR STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITIES Reporting Period July 1, 2008 through June 30, 2009 An annual report is required to be submitted to your local Regional Water Quality Control Board (Regional Board) by July 1 of each year. This document must be certified and signed, under penalty of perjury, by the appropriate official of your company. Many of the Annual Report questions require an explanation. Please provide explanations on a separate sheet as an attachment. Retain a copy of the completed Annual Report for your records.
Please circle or highlight any information contained in Items A, B, and C below that is new or revised so we can update our records. Please remember that a Notice of Termination and new Notice of Intent are required whenever a facility operation is relocated or changes ownership.
If you have any questions, please contact your Regional Board Industrial Storm Water Permit Contact.
The names, telephone numbers and e-mail addresses of the Regional Board contacts, as well as the Regional Board office addresses can be found at http://www.waterboards.ca.gov/stormwtr/contact.html.
To find your Regional Board information, match the first digit of your WDID number with the corresponding number that appears in parenthesis on the first line of each Regional Board office.
GENERAL INFORMATION:
A. FacilityInformation:                                                  Facility WDID No: 3401018248 Facility Business Name: Diablo Canyon Power Plant (DCPP)            Contact Person: Trevor D. Rebel Physical. Address: 9 Miles Northwest of Avila Beach                  e-mail: tdr5(,pqe.com City: Avila Beach                                                    State: CA Zip: 93424    Phone: 805.545.3607 Standard Industrial Classification (SIC) Code(s)    4911 B. FacilityOperatorInformation:
Operator Name: Pacific Gas.& Electric Company - DCPP                  Contact Person: Trevor D. Rebel Mailing Address: P.O. Box 56                                        e-mail: tdr5(@pqe.com City: Avila Beach                                                    State: CA Zip: 93424    Phone: 805.545.3607 C. Facility Billing Information:
Operator Name: Pacific Gas & Electric CompanV - DCPP                Contact Person: Bryan K. Cunningham Mailing Address: P.O. Box 56                                        e-mail: bkc3(,poqe.com City: Avila Beach                                                    State: CA Zip: 93424    Phone: 805.545.4439
 
2008-2009 ANNUAL REPORT SPECIFIC INFORMATION MONITORING AND REPORTING PROGRAM D. SAMPLING AND ANALYSIS EXEMPTIONS AND REDUCTIONS
: 1. For the reporting period, was your facility exempt from collecting and analyzing samples from two storm events in accordance with sections B.12 or 15 of the General Permit?
D        YES      Go to Item D.2                                          NO          Go to Section E
: 2. Indicate the reason your facility is exempt from collecting and analyzing samples from two storm events. Attach a copy of the first page of the appropriate certification if you check boxes ii, iii, iv, or v.
: i.  [D]  Participating in an Approved Group Monitoring Plan                Group Name:
ii. D    Submitted No Exposure Certification (NEC)                          Date Submitted:                /      I Re-evaluation Date:      I      I Does facility continue to satisfy NEC conditions?          E-    YES              ED    NO iii. D    Submitted Sampling Reduction Certification (SRC)                  Date Submitted:                /      I Re-evaluation Date:      /      /
Does facility continue to satisfy SRC conditions?                  YES                    NO iv.        Received Regional Board Certification                              Certification Date:            /
V. E-    Received Local Agency Certification                                Certification Date:            /
: 3. If you checked boxes i or iii above, were you scheduled to sample one storm event during the reporting year?
L-]      YES        Go to Section E                                  El    NO          Go to Section F
: 4. If you checked boxes ii, iv, or v, go to Section F.
E. SAMPLING AND ANALYSIS RESULTS
: 1. How many storm events did you sample? 2              If less than 2, attach explanation (ifyou checked item D.2.i or iii.
above, only attach explanation if you answer "0").
: 2. Did you collect storm water samples from the first storm of the wet season that produced a discharge during scheduled facility operating hours? (Section B.5 of the General Permit)
El        YES                                                                NO      attach explanation (Please note that if you do not sample the first storm event, you are still required to sample 2 storm events)
: 3. How many storm water discharge locations are at your facility? 18 2008-2009 ANNUAL REPORT
: 4. For each storm event sampled, did you collect and analyze a sample from each of the facility's' storm water discharge locations?    [--1  YES, go to Item E.6            NO
: 5. Was sample collection or analysis reduced in accordance with Section B.7.d of the General Permit?                                      YES      L--  NO, attach explanation If "YES", attach documentation supporting your determination that two or more drainage areas are substantially identical.
Date facility's drainage areas were last evaluated 6/02/09
: 6. Were all samples collected during the first hour of discharge?          LI    YES      [7  NO, attach explanation
: 7. Was all storm water sampling preceded by three (3) working days without a storm water discharge?                                  YES      LI  NO, attach explanation
: 8. Were there any discharges of storm water that had been temporarily stored or contained? (such as from a pond)                        YES      LI  NO, go to Item E.10
: 9. Did you collect and analyze samples of temporarily stored or contained storm water discharges from two storm events?
(or one storm event if you checked item D.2.i or iii. above)                  YES      LI    NO, attach explanation
: 10. Section. B.5. of the General Permit requires you to analyze storm water samples for pH, Total Suspended Solids (TSS), Specific Conductance (SC), Total Organic Carbon (TOC) or Oil and Grease (O&G), other pollutants likely to be present in storm water discharges in significant quantities, and analytical parameters listed in Table D of the General Permit.
: a. Does Table D contain any additional parameters related to your facility's SIC code(s)?                                  YES      El    NO, Go to Item E.11
: b. Did you analyze all storm water samples for the applicable parameters listed in Table D?                                  YES      [I    NO
: c. If you did not analyze all storm water samples for the applicable Table D parameters, check one of the following reasons:
In prior sampling years, the parameter(s) have not been detected in significant quantities from two consecutive sampling events. Attach explanation The parameter(s) is not likely to be present in storm water discharges and authorized non-storm water discharges in significant quantities based upon the facility operator's evaluation. Attach explanation Other. Attach explanation
: 11. For each storm event sampled, attach a copy of the laboratory analytical reports and report the sampling and analysis results using Form 1 or its equivalent. The following must be provided for each sample collected:
    "    Date and time of sample collection
* Testing results
    "    Name and title of sampler
* Test methods used
    "    Parameters tested
* Test detection limits
* Name of analytical testing laboratory                            °    Date of testing
    "    Discharge location identification
* Copies of the laboratory analytical results 2008-2009 ANNUAL REPORT F. QUARTERLY VISUAL OBSERVATIONS
: 1. Authorized Non-Storm Water Discharges Section B.3.b of the General Permit requires quarterly visual observations of all authorized non-storm water discharges and their sources.
: a. Do authorized non-storm water discharges occur at your facility?
YES                          LI]    NO    Go to Item F.2 b.'  Indicate whether you visually observed all authorized non-storm water discharges and their sources during the quarters when they were discharged. Attach an explanation for any "NO" answers. Indicate "N/A" for quarters without any authorized non-ýstorm water discharges.
July-September        [  YES    r-No      []  N/A          October-December      YES        NO    L  N/A January-March            YES    [IJ NO    El  N/A        April-June,            YES  [: NO    LI  N/A
: c. Use Form 2 to report quarterly visual observations of authorized non-storm water discharges or provide the following information:
: i. name of each authorized non-storm water discharge ii.,  date and time of observation iii. source and location of each authorized non-storm water discharge iv. characteristics of the discharge at its source and impacted drainage area/discharge location
: v.      name, title, and signature of observer vi. any new or revised BMPs necessary to reduce or prevent pollutants in authorized non-storm water discharges. Provide new or revised BMP implementation date.
: 2. Unauthorized Non-Storm Water Discharges Section B.3.a of the General Permit requires quarterly visual observations of all drainage areas to detect the presence of unauthorized non-storm water discharges and their sources.
: a. Indicate whether you visually observed all drainage areas to detect the presence of unauthorized non- storm Water discharges and their sources. Attach an explanation for any "NO" answers.
July-September        [*  YES        NO                      October-December        YES  EII NO January-March          [e YES        NO                      April-June          \YES    LII NO
: b. Based upon the quarterly visual observations, were any unauthorized non-storm water discharges detected?
El      YES                        [1]    NO    Go to Item F.2.d
: c. Have each of the unauthorized non-storm water discharges been eliminated or permitted?
          "-      YES                        LII    NO    Attach explanation
: d. Use Form 3 to report quarterly unauthorized non-storm water discharge visual observations or provide the following information:
L    name of each unauthorized non-storm water discharge ii. date and time of observation iii. source and location of each unauthorized non-storm water discharge, iv. characteristics of the discharge at its source and impacted drainage area/discharge location
: v. name, title, and signature of observer vi. any corrective actions necessary to eliminate the source of each unauthorized non-storm water discharge and to clean impacted drainage areas. Provide date unauthorized non-storm water discharge(s) was eliminated or scheduled to be eliminated.
2008-2009 ANNUAL REPORT G. MONTHLY WET SEASON VISUAL OBSERVATIONS Section B.4.a of the General Permit requires you to conduct monthly visual observations of storm water discharges at all storm water discharge locations during the wet season. These observations shall occur during the first hour of discharge or, in the case of temporarily stored or contained storm water, at the time of discharge.
: 1. Indicate below whether monthly visual observations of storm water discharges occurred at all discharge locations.
Attach an explanation for any "NO" answers. Include in this explanation whether any eligible storm events occurred during scheduled facility operating hours that did not result in a storm water discharge, and provide the date, time, name and title of the person who observed that there was no storm water discharge.
YES              NO                                          YES                NO October              D                F7 February            Eli LI November                                                        March, D                                                              LI                N December                                                        April January                                                          May
: 2. Report monthly wet season visual observations using Form 4 or provide the following information:
: a. date, time, and location of observation
: b. name and title of.observer
: c. characteristics of the discharge (i.e., odor, color, etc.) and source of any pollutants observed
: d. any new or revised BMPs necessary to reduce or prevent pollutants in storm water discharges.
Provide new or revised BMP implementati6n date.
ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION (ACSCE)
H. ACSCE CHECKLIST Section A.9 of the General Permit requires the facility operator to conduct one ACSCE in each reporting period (July 1-June 30). Evaluations must be conducted within 8-16 months of eachaother. The SWPPP and monitoring program shall be revised and implemented, as necessary, within 90 days of the evaluation. The checklist below includes the minimum steps necessary to complete a ACSCE. Indicate whether you have performed each step below. Attach an explanation for any "NO" answers.
: 1. Have you inspected all potential pollutant sources and industrial activities areas?          IX] YES        FI No The following areas should be inspected:
        "    areas where spills and leaks have occurred "                        buildin g repair, remodeling, and construction during the last year
* materk I storage areas
* outdoor wash and r'inse areas                                  &    vehicle /equipment storage areas
* process/manufacturing areas                                    a    truck p arking and access areas
* loading, unloading, and transfer areas
* rooftop equipment areas
        "    waste storage/disposal areas                                    0    vehicle fueling/maintenance areas
        "    dust/particulate generating areas                              0    non-stc rm water discharge generating areas
* erosion areas
: 2. Have you reviewed your SWPPP to assure that its BMPs address existing potential pollutant sources and industrial activities areas?                                      YES        EI NO
: 3. Have you inspected the entire facility to verify that the SWPPP's site map is up-to-date? The following site map items should be verified:                                  YES        FL NO 0    facility boundaries
* storm water collection and conveyance system S    outline of all storm water drainage areas                " structural control measures.such as catch basins, berms, S    areas impacted by run-on                                    containment areas, oil/water separators, etc.
S    storm water discharges locations 2008-2009 ANNUAL REPORT
: 4. Have you reviewed all General Permit compliance records generated since the last annual evaluation?                                                              YES          n NO The following records should be reviewed:
        "    quarterly authorized non-storm water                        "    quarterly unauthorized non-storm water discharge discharge visual observations                                    visual observations
* monthly storm water discharge visual                        "    Sampling and Analysis records observation
* preventative maintenance inspection and
        "    records of spills/leaks and associated                            maintenance records clean-up/response activities
: 5. Have you reviewed the major elements of the SWPPP to assure compliance with the General Permit?                                                        0    YES          El  NO The following SWPPP items should be reviewed:
S    pollution prevention team                                        assessment of potential pollutant sources 0    list of significant materials                                    identification and description of the BMPs to be 0    description of potential pollutant sources                        implemented for each potential pollutant source
: 6. Have you reviewed your SWPPP to assure that a) the BMPs are adequate in reducing or preventing pollutants in storm water discharges and authorized non-storm water discharges, and b) the BMPs are being implemented?                        N    YES          [] NO The following BMP categories should be reviewed:
* good housekeeping practices                                      preventative maintenance
        "    spill response                                                    material handling and storage practices
        "    employee training                                                waste handling/storage
* erosion control                                                  structural BMPs
        "    quality assurance
: 7. Has all material handling equipment and equipment needed to implement the SWPPP been inspected?                                                        M    YES          I- NO L  ACSCE EVALUATION REPORT The facility operator is required to provide an evaluation report that includes:
  "    identification of personnel performing the evaluation
* schedule for implementing SWPPP revisions
  "    the date(s) of the evaluation                                      "    any incidents of non-compliance and the
  "    necessary SWPPP revisions                                              corrective actions taken Use Form 5 to report the results of your evaluation or develop an equivalent form.
J. ACSCE CERTIFICATION.
The facility operator is required to certify compliance with the Industrial Activities Storm Water General Permit. To certify compliance, both the SWPPP and Monitoring Program, must be up to date and be fully implemented.
Based upon your ACSCE, do you certify compliance with the Industrial Activities Storm Water General Permit?                                                          VM YES            D- NO If you answered "NO" attach an explanation to the ACSCE Evaluation Report why you are not in compliance with the Industrial Activities Storm Water General Permit.
2008-2009 ANNUAL REPORT ATTACHMENT
 
==SUMMARY==
 
Answer the questions below to help you determine what should be attached to this annual report. Answer NA (Not Applicable) to questions 2-4. if you are not required to provide those attachments.
: 1. Have you attached Forms 1,2,3,4, and 5 or their equivalent?                    YES (Mandatory)
: 2. If you conducted sampling and analysis, have you attached the laboratory analytical reports?                                                YES            NO      []  NA
: 3. If you checked box II, Ill, IV,or V in item D.2 of this Annual Report, have you attached the first page of the appropriate certifications?                                              L-]  YES        ]  NO          NA
: 4. Have you attached an explanation for each "NO" answer in items E.1, E.2, E.5-E.7, E.9, E.10.c, F.1.b, F.2.a, F.2.c, G.1, H.1-H.7, or J?                                                            YES            NO      E-i NA ANNUAL REPORT CERTIFICATION I am duly authorized to sign reports required by the INDUSTRIAL ACTIVITIES STORM WATER GENERAL PERMIT (see Standard Provision C.9) and I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those person directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Printed Name:      Kenneth J. P Signature:                                                                                Date:        //'
 
==Title:==
Station Direct        Diabl    anyon Power Plant.
2008-2009 ANNUAL REPORT DESCRIPTION OF BASIC ANALYTICAL                                    PARAMETERS The Industrial Activities Storm Water General Permit (General Permit) requires you to analyze storm water samples for at least four parameters. These are pH, Total Suspended Solids (TSS), Specific Conductance (SC),and Total Organic Carbon (TOC). Oil and Grease (O&G) may be substituted for TOC. In addition, you must monitor for any other pollutants which you believe to be present in your storm water discharge as a result of industrial activity and analytical parameters listed in Table D of the General Permit. There are no numeric limitations for the parameters you test for.
The four parameters which the General Permit requires to be tested are considered indicatorparameters. In other words, regardless of what type of facility you operate, these parameters are nonspecific and general enough to usually provide some indication whether pollutants are present in your storm water discharge. The following briefly explains what each of these parameters mean:
pH is a numeric measure of the hydrogen-ion concentration. The neutral, or acceptable, range is within 6.5 to 8.5. At values less than 6.5, the water is considered acidic; above 8.5 it is considered alkaline or basic. An example of an acidic substance is vinegar, and a alkaline or basic substance is liquid antacid. Pure rainfall tends to have a pH of a little less than 7. There may be sources of materials or industrial activities which could increase or decrease the pH of your storm water discharge. If the pH levels of your storm water discharge are high or low, you should conduct a thorough evaluation of all potential pollutant sources at your site.
Total Suspended Solids (TSS) is a measure of the undissolved solids that are present in your storm water discharge.
Sources of TSS include sediment from erosion of exposed land, and dirt from impervious (i.e. paved) areas. Sediment by itself can be very toxic to aquatic life because it covers feeding and breeding grounds, and can smother organisms living on the bottom of a water body. Toxic chemicals and other pollutants also adhere to sediment particles. This provides a medium by which toxic or other pollutants end up in our water ways and ultimately in human and aquatic life. TSS levels vary in runoff.
from undisturbed land. It has been shown that TSS levels increase significantly due to land development.
Specific Conductance (SC) is a numerical expression of the ability of the water to carry an electric current. SC can be used to assess the degree of mineralization, salinity, or estimate the total dissolved solids concentration of a water sample.
Because of air pollution, most rain water has a SC a little above zero. A high SC could affect the usability of waters for drinking, irrigation, and other commercial or industrial use.
Total Organic Carbon (TOC) is a measure of the total organic matter present in water. (All organic matter contains carbon)
This test is sensitive and able to detect small concentrations of organic matter. Organic matter is naturally occurring in animals, plants, and man. Organic matter may also be man made (so called synthetic organics). Synthetic organics include pesticides, fuels, solvents, and paints. Natural organic matterutilizes the oxygen in a receiving water to biodegrade. Too much organic matter could place a significant oxygen demand on the water, and possibly impact its quality. Synthetic organics either do not biodegrade or biodegrade very slowly. Synthetic organics are a source of toxic chemicals that can have adverse affects at very low concentrations. Some of these chemicals bioaccumulate in aquatic life. If your levels of TOC are high, you should evaluate all sources of natural or synthetic organics you may use at your site.
Oil and Grease (O&G) is a measure of the amount of oil and grease present in your storm water discharge. At very low concentrations, O&G can cause a sheen (that floating "rainbow") on the surface of water (1 qt. of oil can pollute 250,000 gallons of water). O&G can adversely affect aquatic life and create unsightly floating material and film on water, thus making it undrinkable. Sources of O&G include maintenance shops, vehicles, machines and roadways.
If you have any questions regarding whether or not your constituent concentrations are too high, please contact your local Regional Board office. The United States Environmental Protection Agency (USEPA) has published stormwater discharge benchmarks for a number of parameters. These benchmarks may be helpful When evaluating whether additional BMPs are appropriate. These benchmarks can be accessed at our website at http://www.waterboards.ca.gov. It is contained in the Sampling and Analysis Reduction Certification.
See Storm Water Contacts at http://www.waterboards.ca.gov/stormwtr/contact.html 2008-2009 Annual Report SIDEA FORM 1-SAMPLING & ANALYSIS RESULTS FIRST STORM EVENT
* If analytical results are less than the detection limit (or non detect able), show the value as less than
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                              meters, etc.), indicate "PA" in the appropriate test method used box.
"    If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank        6    Make additional copies of this form as necessary.        ,        /
NAME OF PERSON COLLECTING SAMPLE(S):                      Trevor Rebel                          TITLE:    Environmental Coordinator                          SIGNATURE:
ANALYTICAL RESULTS DESCRIBE                                                                                                                For First Storm Event DISCHARGE                  DATE/TIME                TIME LOCATION                  OF SAMPLE            DISCHARGE Example: NW Out Fall            COLLECTION              STARTED                                  BASIC PARAMETERS                                                    OTHER PARAMETERS PH          TSS            SC          TOC                          Fe Marine Refuel                    10-30-08 Facility Runoff                    22:11                22:00                6.9          530          2,300        100                          31 003                              10-30-08 Yard Storm Drain                    22:05                22:00                6.7          520          4,400          76                          19 004                              10-30-08 Yard Storm Drain                    22:13                    (1)              6.9          250          3,600        120                        7.5 to Retention Basin 005                              10-30-08 Yard Storm Drain                    22:23                22:00                7.0          160          1,400        94                        5.8 TEST REPORTING UNITS:                                                      pH Units        mg/I        umho/cm        mg/I                      mg/I 0.1            5            1            4                        0.02 TEST METHOD DETECTION LIMIT:
SM          SM            SM          SM                        EPA TEST METHOD USED:                                                          4500HB          2540D        2510B        5310B                      200.7 LAB          LAB          LAB          LAB                        LAB
                                                                                                                                      -              -            -              -AB ANALYZED BY (SELF/LAB):
TSS - Total Susoended Solids                                  SC - Specific Conductance                    O&G - Oil & Grease                      TOC - Total Organic  Carbon v
(1) Point sampled pre-released as explained in comments under Section E, Number 2.
 
2008-2009 Annual Report SIDE A FORM 1-SAMPLING & ANALYSIS RESULTS FIRST STORM EVENT
* If analytical results are less than the detection limit (or non detectable), show the value as less than
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                            meters, etc.), indicate "PA" in the appropriate test method used box.
Iif you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank      0    Make additional copies of this form as necessary.
NAME OF PERSON COLLECTING SAMPLE(S):                      Trevor Rebel                          TITLE:  Environmental Coordinator                            SIGNATURE:_        _    _    _    _ _    _
ANALYTICAL RESULTS DESCRIBE                                                                                                              For First Storm Event DISCHARGE                  DATE/TIME                TIME LOCATION                OF SAMPLE            DISCHARGE Example: NW Out Fall            COLLECTION              STARTED                                BASIC PARAMETERS                                                    OTHER PARAMETERS PH          TSS          SC          TOC                          Fe            Cr            Pb          Ni 006                              10-30-08 Yard Storm Drain                    23:12                22:30              7.1          28          360          52                        2.1          0.008        0.032        0.018 (At Discharge) 006                              10-30-08 Range Immediate                    23:01                22:30              6.9          54          520          98                          1.7          n/a        0.30        n/a Out 008                              10-30-08 Yard Storm Drain                    23:46                22:00              6.6          58          5,800          93                        2.2            n/a          n/a        n/a 009                              10-30-08 Yard Storm Drain                    22:45                22:00              7.0            6          740          16                        1.7            n/a          n/a        n/a TEST REPORTING UNITS:                                                      pH Units      mg/I        umho/cm        mg/I                      mg/I          mg/I        mg//I        mg/I 0.1            5            1            4                        0.02          0.001        0.001        0.001 TEST METHOD DETECTION LIMIT:
SM          SM            SM            SM                        EPA            EPA          EPA          EPA TEST METHOD USED:                                                          4500HB        2540D          2510B        5310B                      200.7          200.8        2008        200.8 LAB          LAB          LAB          LAB                        LAB          LAB          LAB        LAB ANALYZED BY (SELF/LAB):
TSS - Total Suspended Solids                                  SC - Specific Conductance                    O&G - Oil & Grease                      TOC - Total Organic Carbon (1) No runoff this sample location for storm event. (2) Sample obtained greater than 1 hour after discharge started as explained in comments under Section E, Number 6.
 
                                                                                -                    2008-2009 Annual Report SIDE A FORM 1-SAMPLING & ANALYSIS RESULTS FIRST STORM EVENT
* If analytical results are less than the detection limit (or non detectaable), show the value as less than          0    When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                              meters, etc.), indicate "PA" in the appropriate test method used box.
* If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank        0    Make additional copies of this form as necessary.
NAME OF PERSON COLLECTING SAMPLE(S):                      Trevor Rebel                          TITLE:  Environmental Coordinator                            SIGNATURE:
ANALYTICAL RESULTS DESCRIBE                                                                                                                  For First Storm Event DISCHARGE                  DATE/TIME                TIME LOCATION                  OF SAMPLE            DISCHARGE Example: NW Out Fall          COLLECTION              STARTED                                  BASIC PARAMETERS                                                      OTHER PARAMETERS PH          TSS            SC          TOC                          Fe 011                              10-30-08 Yard Storm Drain                    23:36                23:00                6.8          33          470          94                          1.9 013                              10-30-08 Yard Storm Drain                    23:25                22:30                7.0          48          350          70                          2.7 10-30-08 015 Yard Storm Drain                    23:28                22:30                7.2          97          380          64                          5.3 023                              10-30-08 Yard Storm Drain                    22:00                22:00                6.3          550          2,800        120                          29 TEST REPORTING UNITS:                                                      pH Units        mg/I      umholcm        mg/I                        mg/I 0.1            5            1            4                          0.02 TEST METHOD DETECTION LIMIT:
SM            SM            SM          SM                          EPA TEST METHOD USED:                                                          4500HB        2540D        2510B        5310B                        200.7 LAB          LAB          LAB          LAB                          LAB-            -            -          --
ANALYZED BY (SELF/LAB):
TSS - Total Suspended Solids                                  SC - Specific Conductance                  &#xfd; O&G - Oil & Grease                      TOC - Total Organic Carbon (1) No runoff this sample location for storm event.
 
2008-2009 Annual Report SIDE B FORM 1-SAMPLING & ANALYSIS RESULTS SECOND STORM EVENT Ifanalytical results are less than the detection limit (or non detectable), show the value as less than          0  When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                            meters, etc.), indicate "PA" in the appropriate test method used box.
Ifyou did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank      0  Make additional copies of this form as necessary.
NAME OF PERSON COLLECTING SAMPLE(S):                    Trevor Rebel                          TITLE:  Environmental Coordinator                            SIGNATURE:    _._  _    __      _  __      _
ANALYTICAL RESULTS DESCRIBE                                                                                                              For Second Storm Event DISCHARGE                  DATE/TIME                TIME LOCATION                  OF SAMPLE            DISCHARGE Example: NW Out Fall          COLLECTION              STARTED                                BASIC PARAMETERS                                                    OTHER PARAMETERS PH          TSS            SC          TOC                          Fe Marine Refuel                    02-22-09 Facility Runoff                    02:34                02:25                8.4        379          238          8.7                        140 003                              02-22-09 Yard Storm Drain                  02:25                02:25                7.3          40          251          14                          1.5 004                              02-22-09 Yard Storm Drain                  04:35                    (1)              7.5          24          212          3.8                        0.86 to Retention Basin 005                              02-22-09 Yard Storm Drain                  02:40                02:25                7.3          60          332          20                          3.4 TEST REPORTING UNITS:                                                      pH Units      mgll      umho/cm        mg/I                        mgI/I 0.1          5            1            4                        0.02 TEST METHOD DETECTION LIMIT:                                                  01            540.
SM          SM            SM          SM                          EPA TEST METHOD USED:                                                          4500HB        2540D        2510B        5310B                      200.7 LAB          LAB          LAB          LAB                        LAB ANALYZED BY (SELF/LAB):____
I S - I otal Suspended Solids                                SC - Specific Conductance                  O&G - Oil & Grease                      TOC - Total Organic Carbon (1) Point sampled pre-released as explained in comments under Section E, Number 2.
 
2008-2009 Annual Report SIDE B FORM 1-SAMPLING & ANALYSIS RESULTS SECOND STORM EVENT
"  Ifanalytical results are less than the detection limit (or non detect*able), show the value as less than
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                              meters, etc.), indicate "PA" in the appropriate test method used box.
"  If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank
* Make additional copies of this form as necessary.
NAME OF PERSON COLLECTING SAMPLE(S):                    Trevor Rebel                          TITLE:  Environmental Coordinator                            SIGNATURE:
ANALYTICAL RESULTS DESCRIBE                                                                                                                For Second Storm Event DISCHARGE                  DATEITIME                TIME LOCATION                  OF SAMPLE            DISCHARGE Example: NW Out Fall          COLLECTION              STARTED                                  BASIC PARAMETERS                                                      OTHER PARAMETERS PH          TSS          SC          TOC                          Fe            Cr          Pb          Ni 006                            02-22-09 Yard Storm Drain                  02:48                02:25                8.2          228          139          12                          8.0        0.010        0.022        0.009 (At Discharge) 006                            02-22-09 Range Immediate                  02:58                02:55                7.7          25            96          10                          0.82          n/a        0.11          n/a Out 008                            02-22-09 Yard Storm Drain                  04:20                02:55                7.0          22          317          3.7                        0.27          n/a          n/a          n/a 009                            02-22-09 Yard Storm Drain                  03:28                02:25                7.1          19          114          5.6                        0.73          n/a          n/a          n/a TEST REPORTING UNITS:                                                    pH Units        mg/I      umho/cm        mg/I                        mg/I          mg/I        mgl/        mg/I    mg/I TEST METHOD DETECTION LIMIT:                                                0.1            5            1            4                          0.02          .002        0.01        0.01 SM          SM            SM            SM                          EPA          EPA          EPA          EPA TEST METHOD USED:                                                        4500HB          2540D        2510B        5310B                        200.7        200.7        200.7        200.7 LAB          LAB          LAB          LAB                          LAB          LAB          LAB          LAB ANALYZED BY (SELF/LAB):_-
TSS -Total Suspended Solids                                SC - Specific Conductance                    O&G - Oil & Grease                      TOC - Total Organic Carbon
 
2008-2009 Annual Report SIDE B FORM 1-SAMPLING & ANALYSIS RESULTS SECOND STORM EVENT
"    Ifanalytical results are less than the detection limit (or non detectable), show the value as less than
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                            meters, etc.), indicate "PA" in the appropriate test method used box.
"    Ifyou did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank
* Make additional copies of this form as necessary.
NAME OF PERSON COLLECTING SAMPLE(S):                      Trevor Rebel                          TITLE: Environmental Coordinator                              SIGNATURE:-            2I"-/&* "(-
ANALYTICAL RESULTS DESCRIBE                                                                                                              For Second Storm Event DISCHARGE                  DATEITIME                TIME LOCATION                  OF SAMPLE            DISCHARGE Example: NW Out Fall            COLLECTION              STARTED                                BASIC PARAMETERS                                                    OTHER PARAMETERS PH          TSS            SC        TOC                          Fe 011                              02-22-09 Yard Storm Drain                    03:40                02:55                7.9          61          110          5.6                        2.9 013                              02-22-09 Yard Storm Drain                    03:13                02:55                8.4        351          232          17                        14 015                              02-22-09 Yard Storm Drain                    03:18                02:55                8.2        289          145          12                        12 023                              02-22-09 Yard Storm Drain                    02:28                02:25                7.0          161          434          35                        7.5 TEST REPORTING UNITS:                                                      pH Units      mg/I      umho/cm        mg/I                      mg/I 0.1          5            1            4                      0.02 TEST METHOD DETECTION LIMIT:
SM          SM            SM          SM                        EPA TEST METHOD USED:                                                          4500HB        2540D        2510B        5310B                      200.7 LAB          LAB          LAB          LAB                        LAB ANALYZED BY (SELF/LAB):
I SS - T otal :Suspendled Solids                              SC -,Specific Conductance                  O&G - Oil & Grease                      TOC - Total Organic Carbon
 
2008-2009 Annual Report FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
"    Quarterly dry weather visual observations are required of each authorized NSWD.
* Authorized NSWDs must meet the conditions provided in Section D (pages 5-6),
* Observe each authorized NSWD source, impacted drainage area, and                          of the General Permit.
discharge location.                                                                    "  Make additional copies of this form as necessary.
QUARTER:
Observers Name:        Trevor Rebel JULYSEPT                                                                                                YESIf YES, complete
 
==Title:==
Environmental Coordinator                          WERE ANY AUTHORIZED NSWDs                                  r        sidof DATE:                                                                                                                                                  revesesdeo form.
DATE:                                        DISCHARGED DURING THIS QUARTER?                            this oNO_-_thisform.
08-07-08                    Signature:
QUARTER:
Observers Name:        Trevor Rebel OCT.-DEC.                                                                                                                                  [      YES
 
==Title:==
Environmental Coordinator                        WERE ANY AUTHORIZED NSWDs                                  If YES, complete DATE:                                                                                                                                                  reverse side of
                                        -        .----            _                      DISCHARGED DURING THIS QUARTER?                      NO    this form.
11-24-08                    Signature:  _lNO QUARTER:
Observers Name:        Trevor Rebel JAN .- MARCH                                                                                                                                      YES1
 
==Title:==
Environmental Coordinator                        WERE ANY AUTHORIZED NSWDs                                  If YES, complete reverse side of DATE:
01200                      Signature:
:DISCHARGED DURING THIS QUARTER?              w  NO    this form.
QUARTER:
Observers Name:        Trevor Rebel APRIL-JUNE                                                                                                                                      YES
 
==Title:==
Environmental Coordinator                        WERE ANY AUTHORIZED NSWDs                                    If YES, complete DATE:                                        -..-----        7-/DISCHARGED                              DURING THIS QUARTER?                        reverse side of NO      this form.
04-07-09                  Signature:
 
2008-2009 Annual Report SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
DATE /TIME OF    SOURCE AND              NAME OF                DESCRIBE AUTHORIZED NSWD                      DESCRIBE ANY REVISED OR NEW OBSERVATION      LOCATION OF          AUTHORIZED.                      CHARACTERISTICS                          BMPs AND PROVIDE THEIR AUTHORIZED                NSWD          Indicate whether authorized NSWD is clear, cloudy, or      IMPLEMENTATION DATE NSWD                                discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.
EXAMPLE:              EXAMPLE:                At the NSWD              At the NSWD Drainage Air conditioner Units Air conditioner              Source                Area and Discharge on Building C        condensate                                              Location Admin Building        Landscape Water        Clean and Clear              Clean and Clear                    None 08-07-08  Landscaping Water to 004 06:30 Air Compressor        Air Compressor        Clean and Clear              Clean and Clear                    None 08-07-08  Condensates          Condensates To 004 08:00 Rinse Water to        Rinse Waters          Clean and Clear              Clean and Clear                    None 08-07-08  004                  Authorized by NPDES Permit 10:00                          Order 90-09 SWRO facility pump    Water Pump Leak        Clean and Clear              Clean and Clear                    None 08-07-08  leak off drains to    Off 005 10:30 Potable water        Fresh Water            Clean and Clear              Clean and Clear                    None-08-07-08  system to 006 at approximately lgpm 11:00
 
2008-2009 Annual Report FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
DATE /TIME OF    SOURCE AND              NAME OF                DESCRIBE AUTHORIZED NSWD                        DESCRIBE ANY REVISED OR NEW OBSERVATION      LOCATION OF          AUTHORIZED                        CHARACTERISTICS                          BMPs AND PROVIDE THEIR AUTHORIZED                NSWD          Indicate whether authorized NSWD is clear, cloudy, or      IMPLEMENTATION DATE NSWD                                discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.
EXAMPLE:              EXAMPLE:                At the NSWD              At the NSWD Drainage Air conditioner Units Air conditioner              Source                Area and Discharge on Building C        condensate                                                Location Admin Building        Landscape Water        Clean and Clear                Clean and Clear                    None 11-24-08  Landscaping Water to 004 06:20 Air Compressor        Air Compressor        Clean and Clear                Clean and Clear                    None 11-24-08  Condensates          Condensates To 004 08:35 Rinse Water to        Rinse Waters          Clean and Clear                Clean and Clear                    None 11-24-08  004                  Authorized by NPDES Permit 10:10                          Order 90-09 SWRO facility pump    Water Pump Leak        Clean and Clear              Clean and Clear                    None 11-24-08  leak off drainage to  Off 005 10:20 Potable water        Fresh Water            Clean and Clear                Clean and Clear                    None 11-24-08  system to 006 at approximately lgpm 10:32
 
2008-2009 Annual Report SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
DATE /TIME OF    SOURCE AND              NAME OF                DESCRIBE AUTHORIZED NSWD                    DESCRIBE ANY REVISED OR NEW OBSERVATION      LOCATION OF          AUTHORIZED                        CHARACTERISTICS                        BMPs AND PROVIDE THEIR AUTHORIZED                NSWD          Indicate whether authorized NSWD is clear, cloudy,      IMPLEMENTATION DATE NSWD                                  or discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.
EXAMPLE:              EXAMPLE:                  At the NSWD            At.the NSWD Drainage Air conditioner Units Air conditioner              Source              Area and Discharge on Building C        condensate                                                Location Air Compressor        Air Compressor          Clean and Clear              Clean and Clear                  None 01-20-09  Condensates          Condensates To 004 07:45 Rinse Water to        Rinse Waters            Clean and Clear              Clean and Clear                  None 01-20-09  004                  Authorized by NPDES Permit 17:05                          Order 90-09 SWRO facility pump    Water Pump Leak        Clean and Clear              Clean and Clear                  None 01-20-09  leak off drainage to  Off 005 14:30 Potable water        Fresh Water            Clean and Clear              Clean and Clear                  None 01-20-09  system to 006 at approximately lgpm 17:15
 
2008-2009 Annual Report SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM. WATER DISCHARGES (NSWDs)
DATE /TIME OF    SOURCE AND              NAME OF                  DESCRIBE AUTHORIZED NSWD                        DESCRIBE ANY REVISED OR NEW OBSERVATION      LOCATION OF          AUTHORIZED                        CHARACTERISTICS                            BMPs AND PROVIDE THEIR AUTHORIZED                NSWD          Indicate whether authorized NSWD is clear, cloudy, or        IMPLEMENTATION DATE NSWD                                discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.
EXAMPLE:              EXAMPLE:                  At the NSWD              At the NSWD Drainage Air conditioner Units Air conditioner              Source                Area and Discharge on Building C        condensate                                                Location Admin Building        Landscape Water        Clean and Clear                Clean and Clear                      None 04-07-09  Landscaping Water to 004 06:45 Air Compressor        Air Compressor          Clean and Clear                Clean and Clear                      None 04-07-09  Condensates          Condensates To 004 08:19 Rinse Water to        Rinse Waters            Clean and Clear                Clean and Clear                      None 04-07-09  004                  Authorized by NPDES Permit 08:19                          Order 90-09 SWRO facility pump    Water Pump Leak        Clean and Clear                Clean and Clear                      None 04-07-09  leak off drainage to  Off 005 08:25 Potable water        Fresh Water            Clean and Clear                Clean and Clear                      None
  *04-07-09  system to 006 at approximately lgpm 08:35 Condensed            Condensed Steam        Clean and Clear                Clean and Clear                      None 04-07-09  Secondary Plant Steam to 009 07:58
 
2008-2009                                                        SIDE A Annual Report FORM 3-QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
"  Unauthorized NSWDs are discharges (such as wash or rinse waters) that do not meet the conditions provided in Section D (pages 5-6) of the General Permit.
* Quarterly visual observations are required to observe current and detect prior unauthorized NSWDs.
* Quarterly visual observations are required during dry weather and at all facility drainage areas.
* Each unauthorized NSWD source, impacted drainage area, and discharge location must be identified and observed.
* Unauthorized NSWDs that can not be eliminated within 90 days of observation must be reported to the Regional Board in accordance with Section A.1 0.e of the General Permit.
"  Make additional copies of this form as necessary.
QUARTER: JULY-SEPT.                                                                                                                        If YES to Observers Name:      Trevor Rebel                        WERE UNAUTHORIZED                            either DATE/TIME OF                                                                                NSWDs OBSERVED?                EL YES  Z  NO question, OBSERVATIONS
 
==Title:==
Environmental Coordinator                                                                    complete 08-07-08    16:30                                                                            WERE THERE INDICATIONS OF                    reverse Signature:              5      'L.*  -                  PRIOR UNAUTHORIZED NSWDs?      DYES    Z  NO side.
QUARTER: OCT.-DEC.                                                                                                                        If YES to Observers Name:.      Trevor Rebel                        WERE UNAUTHORIZED                            either DATE/TIME OF                                                                                NSWDs OBSERVED?                D]YES    Z  NO question, OBSERVATIONS
 
==Title:==
Environmental Coordinator                                                                    complete 11-24-08    16:30                                                A                          WERE THERE INDICATIONS OF                    reverse Signature:            C                                  PRIOR UNAUTHORIZED NSWDs?      DYES    Z  NO side.
QUARTER: JAN.-MARCH                                                                                                                        If YES to Observers Name:      Trevor Rebel                        WERE UNAUTHORIZED                            either DATE/TIME OF                                                                                NSWDs OBSERVED?                DYES    Z  NO question, OBSERVATIONS
 
==Title:==
Environmental Coordinator                                                                    complete 01-20-09    17:00                                                                          WERE THERE INDICATIONS OF                    reverse Signature:  ___PRIOR                                              UNAUTHORIZED NSWDs?    DYES    Z. NO side.
QUARTER: APRIL-JUNE                                                                                                                        If YES to Observers Name:      Trevor Rebel                        WERE UNAUTHORIZED                            either DATE/TIME OF                                                                                NSWDs OBSERVED?                DlYES    Z  NO question, OBSERVATIONS
 
==Title:==
Environmental Coordinator                                                                    complete 04-07-09    17:00                                              ,                            WERE THERE INDICATIONS OF                    reverse Signature:_        _      _      _ _    _      _        PRIOR UNAUTHORIZED NSWDs?      D]YES    Z  NO side.
 
2008-2009 Annual Report SIDE B FORM 3 QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
OBSERVATION          NAME OF      SOURCE AND        DESCRIBE UNAUTHORIZED NSWD CHARACTERISTICS                          DESCRIBE CORRECTIVE DATE        UNAUTHORIZED        LOCATION          Indicate whether unauthorized NSWD is clear, cloudy,              ACTIONS TO ELIMINATE (FROM              NSWD              OF          discolored, causing stains; contains floating objects or an oil    UNAUTHORIZED NSWD AND REVERSE SIDE)                    UNAUTHORIZED                          sheen, has odors, etc.                            TO CLEAN IMPACTED NSWD                                                                                DRAINAGE AREAS.
PROVIDE UNAUTHORIZED EXAMPLE:        EXAMPLE:                                              AT THE UNAUTHORIZED              NSWD ELIMINATION DATE.
Vehicle Wash    NW Corner of          AT THE UNAUTHORIZED                NSWD AREA AND
                \hlntar          Parkinq Lot                NSWD SOURCE                DISCHARGE LOCATION Y          f                                4.                                P I                              .1.                              4-
  /II
: -JAM I--PM DAM D PM D-AM El P'M
 
2008-2009 Annual Report FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                  SIDE A STORM WATER DISCHARGES
  "  Storm water discharge visual observations are required for at least-one storm              Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                              Make additional copies of this form as necessary.
  "  Visual observations must be conducted during the first hour of discharge                  Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed                discharge.
at the time of discharge.
                                                                                        #1 Boat                    #2 003                          #3 004                        #4 005 Observation Date: October          2008                                                Marine Refuel Station      Yard Storm Drain                Yard Storm Drain to          Yard Storm Drain Drainage Location Description Retention Basin Observers Name:                                                                                None                            None                            None                        None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
No No__-_-      __No___No_
No                              No No  D No_[__
                                                                                        #1 Boat                    #2 003                          #3 004                        #4 005 Observation Date: November 25 2008                                                      Marine Refuel Station      Yard Storm Drain                Yard Storm Drain to          Yard Storm Drain Drainage Location Description                                                                Retention Basin Observers Name Trevor Rebel                                                                    13:53                          13:56                            14:00.                      14:06 Observation Time
 
==Title:==
Environmental Coordinator                                                                13:53                          13:53                        Pre-Release                      13:53 Time Discharge Began Signature:        C                                    Were Pollutants Observed                No                              No                              No                            No (If yes, complete reverse side)          No                              NNoo
                                                                                        #1 Boat                    #2 003                          #3 004                        #4 005 Observation Date: December            2008                                              Marine Refuel Station      Yard Storm Drain                Yard Storm Drain to          Yard Storm Drain Drainage Location Description Retention Basin Observers Name:                                                                                None                            None                            None                          None Observation Time
 
==Title:==
Time Discharge Began Signature      a                                      Were Pollutants Observed                NoE                              Nol                          NoE                          NoE (If yes, complete reverse side)                            _                                          No_    _    _No_                      _
                                                                                        #1 Boat                    #2 003                          #3 004                        #4 005 ObservationDrainage                                                Location Description Marine Refuel Station      Yard Storm Drain                Yard Storm Drain to          Yard Storm Drain i                                                                            Retention Basin Observers Name:                                                                                None                            None                            None                        None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed                No                            No                              No                            NoE (If yes, complete reverse side)
 
2008-2009 Annual Report FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                            SIDE A STORM WATER DISCHARGES
  "    Storm water discharge visual observations are required for at least one storm                  Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                                  Make additional copies of this form as necessary.
  "    Visual observations must be conducted during the first hour of discharge                      Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                    water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed                    discharge.
at the time of discharge.
                                                                                                                        #6 Range                        #7 007                        #8 008 Observation Date: October__ 2008                                                          Yard006
                                                                                          #5    Storm Drain            Immediate Outlet                Storm Water                  Yard Storm Drain Drainage Location Description    (At Discharge)
Observers Name:                                                                                      None                            None                            None                        None Observation Time
 
==Title:==
Time Discharge Began Signature.:                                              Were Pollutants Observed (If yes, complete reverse side)
                                                                                          #5                            #6  Range Outlet                #7 007                        #8 008 Observation Date: November          25 2008                                              Yard006Storm Drain            Immediate                      Storm Water                  Yard Storm Drain Drainage Location Description      (At Discharge)
Observers Name:        Trevor Rebel                                                                14:19                            14:32                      N/A-No Flow                      14:50 Observation Time
 
==Title:==
Environmental Coordinator                                                                  14:15                            14:15                      N/A-No Flow                      13:53
                          *    **,/V7      7L'          Time Discharge Began Signature:                                              Were Pollutants Observed                                                      N.                                oo (If-yes, complete reverse side)              No  Z                          No  Z                          No zs                        No  Z
                                                                                          #5 006                        #6 Range                        #7 007                        #8 008 Observation Date: December              2008 Drainage Location Description Yard Storm Drain              Immediate Outlet                Storm Water                  Yard Storm Drain (At Discharge)
Observers Name:                                                                                      None                            None                          None                          None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
Observation Date: January              2009                                                #5 006                      #6 Range                        #7 007                        #8 008 Drainatio Drainage Locate:
Location      Januaryio Description          Storm 29Yard  Drain (At Discharge)                Immediate Outlet                Storm Water                  Yard Storm Drain Observers Name:                                                                                      None                            None                          None                          None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
 
2008-2009 Annual Report FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                    SIDE A STORM WATER DISCHARGES
    "    Storm water discharge visual observations are required for at least one storm              Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                              Make additional copies of this form as necessary.
* Visual observations must be conducted during the first hour of discharge                    Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                water discharge and note the date, time, name, and title of who observed there was no storm water
    "    Discharges of temporarily stored or contained storm water must be observed                  discharge.
at the time of discharge.
                                                                                          #9 009                      #10 010                          #11 011                      #12 012 Observation Date: October            2008                                                Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Drainage Location Description Observers Name:                                                                                  None                            None                            None                        None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
                                                                                          #9 009                      #10 010                          #11 011                      #12 012 Observation Date: November          25 2008                                              Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel          -                                                        14:03 (1)                          14:38                          14:43                    N/A-No Flow Observation Time
 
==Title:==
Environmental Coordinator                                                                13:53                            14:15                          14:15                    N/A-No Flow Time Discharge Began Signature:          (._                                Were Pollutants Observed                  No                              No                              No                            No (If yes, complete reverse side)          NO____NO_[___o____No___
                                                                                          #9 009                      #10 010                          #11 011                      #12 012 Observation Date: December              2008                                            Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Drainage Location Description  YadSomDan                    YrStr            Dri            Yadtrm          rinadSomDan Observers Name:                                                                                  None                            None                          None                        None Observation Time Title'_
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
                                                                                          #9 009                      #10 010                          #11 011                      #12 012 Observation Date: January            2009                                                Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Drainage Location Description  YadSomDan                    YrStr            Dri            Yadtrm          rinadSomDan Observers Name:                                                                                  None                            None                          None                          None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
(1) November observation at point 009 observed by Jim Kelly, Senior Biologist.
 
2008-2009 Annual Report FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                    SIDE A STORM WATER DISCHARGES
  "  Storm water discharge visual observations are required for at least one storm          "  Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                          "  Make additional copies of this form as necessary.
  "  Visual observations must be conducted during the first hour of discharge
* Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                water discharge and note the date, time, name, and title of who observed there was no storm water
  "  Discharges of temporarily stored or contained storm water must be observed                  discharge.
at the time of discharge.
                                                                                        #13 013                    #14 014                          #15 015                      #16 020 Observation Date: October          2008                                    Description  Yard Storm Drain            Storm Water Runoff              Yard Storm Drain              Intake Deck Storm Drain Observers Name:                                                                                  None                            None                            None                        None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (Ifyes, complete  reverse side)
Observation Date: November 25
                                                                                        #13 013                    #14 014                          #15 015                      #16 020 2008                                            Yard Storm Drain            Storm Water Runoff              Yard Storm Drain              Intake Deck Storm Drainage Location Description                                                                                              Drain Observers Name: Trevor Rebel                                                                    15:10                            15:30                          15:18                        13:57 Observation Time
 
==Title:==
Environmental Coordinator                                                                14:20                            15:30                          14:20                        13:53 Time Discharge Began Signature:            .                                Were Pollutants Observed                Yes  Z                            No  Z                          No  Z                        No  Z (ifyes,  complete reverse side)
Observation Date December            2008                                                #13 013                    #14 014                          #15 015                      #16 020 Drainage Location Description    Yard Storm Drain            Storm Water Runoff              Yard Storm Drain              Intake Deck Storm DranaeocaioDscrptonDrain Observers Name:                                                                                  None                            None                            -None                        None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
                                                                                        #13 013                    #14 014                          #15 015                      #16 020 Observation Date: JanuaryD        2009                Drainage Location DescriptionDri Yard Storm Drain            Storm Water Runoff              Yard Storm Drain              Intake Deck Storm Drain Observers Name:                                                                                  None                            None                          None                        None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed I (If yes, complete reverse side)
 
2008-2009 Annual Report FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                    SIDE A STORM WATER DISCHARGES
* Storm water discharge visual observations are required for at least one storm              Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                              Make additional copies of this form as necessary.
  "    Visual observations must be conducted during the first hour of discharge                    Until a monthly visual observation is made, record any eligible storm events that do notresult in a storm at all discharge locations.                                                                water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed,                discharge.
at the time of discharge.
                                                                                        #17 021                      #18 023 Observation Date: October            2008                Drainage Location Description  Yard Storm Drain            Yard Storm Drain Observers Name:                                                                                  None                            None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (Ifyes, complete reverse side)
                                                                                        #17 021                      #18 023 Observation Date: November          25 2008                                              Yard Storm Drain            Yard Storm Drain Drainage Location Description Observers Name: TrevorRebel                                                                      13:57                            13:58 Observation Time
 
==Title:==
Environmental Coordinator                                                                13:53                            13:53 Time Discharge Began Signature:          L,--Vv L-'*                        Were Pollutants Observed                    No7o (If yes, complete reverse side)            No                              No 1__/N
                                                                                        #17 021                      #18    023 2008                                              #17 021                      #18 023 Observation Date: December Drainage Location Description  Yard Storm Drain            Yard Storm Drain Observers Name:                                                                                  None                            None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
                                                                                        #17 021                      #18 023 Yar 021                    #18 023 Observation Date: January            2009 Drainage Location Description  Yard Storm Drain            Yard Storm Drain Observers Name:                                                                                  None                            None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
 
2008-2009 Annual Report SIDE B FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES DATE/TIME OF            DRAINAGE AREA              DESCRIBE STORM WATER DISCHARGE                    IDENTIFY AND DESCRIBE SOURCE(S) OF              DESCRIBE ANY REVISED OR NEW OBSERVATION                DESCRIPTION                        CHARACTERISTICS                                        POLLUTANTS                          BMPs AND THEIR DATE OF (From Reverse Side)                                                                                                                                            IMPLEMENTATION Indicate whether storm water discharge is clear, EXAMPLE: Discharge from    cloudy, or discolored; causing staining; containing  EXAMPLE: Oil sheen caused by oil dripped by material storage Area #2  floating objects or an oil sheen, has odors, etc. trucks in vehicle maintenance area.
013 Discharge        Foam on top of the water.                            Foam from recent paving operations              None. Temporary issue caused by 11-25-08                                                                                          adjacent to Raw Water Reservoirs.              infrequent paving activity.
15:10 4                          4                                                                                                  -I-4                          4                                                    4                                            4
 
2008-2009 Annual Report FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                      SIDE A STORM WATER DISCHARGES
  "  Storm water discharge visual observations are required for at least one storm              9    Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                                  Make additional copies of this form as necessary.
  "  Visual observations must be conducted during the first hour of discharge                        Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                    water discharge and note the date, time, name, and title of who observed there was no storm water
  "  Discharges of temporarily stored or contained storm water must be observed                      discharge.
at.the time of discharge.
                                                                                          #1 Boat                      #2 003                            #3 004                        #4 005 ObservationDrainage                                                Location Description    Marine Refuel Station        Yard Storm Drain                  Yard Storm Drain to          Yard Storm Drain Retention Basin Observers Name:                                                                                      None"                          None                              None                      None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
                                                                                          #1 Boat                      #2 003                          #3 004                        #4 005 ObservationDrainage                                                Location Description    Marine Refuel Station        Yard Storm Drain                Yard Storm Drain to          Yard Storm Drain Retention Basin Observers Name:                                                                                      None                            None                              None                      None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverseside)
                                                                                          #1 Boat                      #2 003                          #3 004                        #4 005 ObservationDate:Drainage                                          Location Description    Marine Refuel Station        Yard Storm Drain                Yard Storm Drain to          Yard Storm Drain Retention Basin Observers Name: Trevor        Rebel                                                                  11:37                          11:26                            11:40                      11:44 Observation Time
 
==Title:==
Environmental Coordinator                                                                    11:25                          11:25                        Pre-Release                    11:25 Time Discharge Began Sign          ature:______                            Were Pollutants Observed                      NoZ                              NoZ                            NoZ                        NoZ
_______________________________________  (If yes, complete reverse side)_____________                                                    _____________
                                                                                          #1 Boat                      #2 003                          #3 004                        #4 005 ObservationDrainage                                                Location Description    Marine Refuel Station        Yard Storm Drain                Yard Storm Drain to          Yard Storm Drain Retention Basin Observers Name:                                                                                      None                            None                              None                      None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed I (If yes, complete reverse side)                                                                                                                  -------
 
2008-2009 Annual Report FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                          SIDE A STORM WATER DISCHARGES
* Storm water disoharge visual observations are required for at least one Storm                    Indicate 'None' in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                                    Make additional copies of this form as necessary.
    " Visual observations must be conducted during the first hour of discharge                              Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                      water discharge and note the date, time, name, and title of who observed there was no storm water
    "      Discharges of temporarily stored or contained storm water must be observed                      discharge.
at the time of discharge.
Observation Date: February                        2009                                        #5 006                        #6 Range                          #7 007                        #8 008*
LoatonDecrpton    Yard Storm Drain              Immediate Outlet                  Storm Water                  Yard Storm Drain Drainage LoainDsrpin              (At Discharge)
Observers Name:                                                                                        None                            None                            None                            None Observation Time
 
==Title:==
Time Discharge Began Signature: ____________________                            Were Pollutants Observed
_______________________________________ (if yes, complete reverse side)_____________
Obevto        09#5ac ae                                                  006                        #6 Range                          #7 007                        #8 008 March____t200 Observatio        Date:io                                                Yard Storm Drain              Immediate Outlet                  Storm Water                  Yard Storm Drain Dranag Loaton    escipton    (At Discharge)
Observers Name:                                                                                        None                            None                            None                            None Observation Time
 
==Title:==
Time Discharge Began Signature: __________________                              Were Pollutants Observed
_______________________________________ (If yes, complete reverse side)                                                                                                  ____________
Obevto 09#5  ae pi                                                006                        #6  Range                        #7 007                        #8 008 Observatge Date:io Aprilrip2009                                                    Yard Storm Drain              Immediate Outlet                  Storm Water                  Yard Storm Drain Dranag Loaton    escipton    (At Discharge)
Observers Name: Trevor Rebel                                                                            11:47                          11:57                      No Discharge                      11:47 (1)
Observation Time
 
==Title:==
Environmental Coordinator                                                                    11:40                            11:45                      No Discharge                        11:25 Time Discharge Began Signature:                                                                                                    1
________________                          Were Pollutants Observed                    N'                                N  ZN/A                                                        NoZ7
_____________________________(if            yes, complete reverse side)NoZoZ                                                                                                                  l Obevto 09#5  ae a                                                006                        #6  Range                        #7 007                        #8 008 Observatio Maycr2009o                              Loate:o                Yard Storm Drain              Immediate Outlet                  Storm Water                  Yard Storm Drain Dranag Loaton    escipton    (At Discharge)
Observers Name:          _______None                                                                                                    None                            None                            None Observation Time
 
==Title:==
Time Discharge Began Signature:    ___________________                        Were Pollutants Observed (1) April observation at point 008 observed by Jim Kelly, Senior Biologist.
 
2008-2009 Annual Report FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                    SIDE A STORM WATER DISCHARGES
* Storm water discharge visual observations are required for at least one storm                Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                                Make additional copies of this forum as necessary.
* Visual observations must be conducted during the first hour of discharge                0    Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                  water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed                    discharge.
at the time of discharge.
                                                                                          #9 009                      #10 010                          #11 011                      #12 012 ObservationDrainage                                                Location Description  Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Observers Name:                                                                                    None                            None                            None                        None Observation Time
 
==Title:==
Time Discharge Began Signature:                                            Were Pollutants Observed (If yes, complete reverse side)__
                                                                                          #9 009                      #10 010                          #11-011                      #12 012 Observation Date: March            2009                                                  Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Drainage Location Description Observers Name:    _                                                                              None                            None                            None                        None Observation Time
 
==Title:==
Time Discharge Began Signature:                                            Were Pollutants Observed (If yes, complete reverse side)
Observation Date: April 7
                                                                                          #9 009                      #10 010                          #11 011                      #12 012 2009                                                    Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Drainage Location Description    Y Observers Name: Trevor Rebel                                                                    11:35 (1)                        12:00                          12:17                        12:19 Observation Time
 
==Title:==
Environmental Coordinator                                                                  11:25                          11:45                          11:45                        12:00 Time Discharge Began Signature:                                            Were Pollutants Observed                  NoN                                                                oN (If yes, complete reverse side)          No                              No                              No_                          No_____
                                                                                          #9 009                      #10 010                          #11    011                    #12 012 Drainage Location Description    Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Observers Name:                                                                                    None                            None                            None                        None Observation Time
 
==Title:==
Time Discharge Began Signature:                                            Were Pollutants Observed (If yes, complete reverse side)
(1) April observation at point 009 observed by Jim Kelly, Senior Biologist.
 
2008-2009 Annual Report FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                          SIDE A STORM WATER DISCHARGES
  "  Storm water discharge visual observations are required for at least one storm
* Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.
* Make additional copies of this form as necessary.
  "  Visual observations must be conducted during the first hour of discharge
* Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                    water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed                      discharge.
at the time of discharge.
                                                                                        #13 013                        #14 014                          #15 015                            #16 020 Observation Date: February            2009                                              Yard Storm Drain                Storm Water Runoff              Yard Storm Drain                  Intake Deck Storm Drainage Location Description                                                                                                        Drain Observers Name:                                                                                    None                              None                            None                          None Observation Time
 
==Title:==
Time Discharge Began:
Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
                                                                                        #13 013                        #14 014                          #15 015                            #16 020 Observation Date: March            2009                                    Description  Yard Storm Drain                Storm Water Runoff              Yard Storm Drain                  Intake Deck Storm Drain Observers Name:                                                                                    None                              None                            None                          None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (Ifyes, complete reverse side)
                                                                                        #13 013                        #14 014                          #15 015                            #16 020 Observation Date: April      7 2009                                                      Yard Storm Drain                Storm Water Runoff              Yard Storm Drain                  Intake Deck Storm Drainage Location Description                                                                                                  Drain
________________Drain Observers Name: Trevor Rebel                                                                      12:07                            12:23                            12:11                        11:28 Observation Time
 
==Title:==
Environmental Coordinator                                                                  11:45                            12:00                            11:45                        11:25 Time Discharge Began Signature:          (e__                                Were Pollutants Observed                      N`71 (If yes, complete reverse side)              No [__No                          [__No                    _        _[__No
                                                                                        #13 013                        #14 014                          #15 015                            #16 020 ObservationDrainage                                                Location Description  Yard Storm Drain                Storm Water Runoff              Yard Storm Drain                  Intake Deck Storm DraiageocatonDscritio            _______Drain Observers Name:                                                                                    None                              None                            None                          None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (if yes, complete reverse side).
 
2008-2009 Annual Report FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                    SIDE A STORM WATER DISCHARGES
  "  Storm water discharge visual observations are required for at least one storm          *    'Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.
* Make additional copies of this form as necessary.
  "  Visual observations must be conducted during the first hour of discharge
* Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                  water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed                    discharge.
at the time of discharge.
                                                                                        #17 021                      #18 023 ObservationDrainage                                                Location Description Yard Storm Drain              Yard Storm Drain Observers Name:                                                                                  None                            None Observation Time:
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (Ifyes, complete reverse side)
                                                                                        #17 021                      #18 023 Observation Date: March            2009                                                Yard Storm Drain              Yard Storm Drain Drainage Location Description Observers Name:                                                                                  None                            None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (Ifyes, complete reverse side)
                                                                                        #17 021                        #18 023 7  2009                                                    Yar 021                      #18 023 Observation Date: April Drainage Location Description  Yard Storm Drain              Yard Storm Drain Observers Name: Trevor Rebel                                                                      11:28                            11:29 Observation Time
 
==Title:==
Environmental Coordinator                                                                11:25                            11:25 Time Discharge Began Signature:          (7/      L/,.-                    Were Pollutants Observed                No                              No (If yes, complete reverse side)
                                                                                        #17 021                        #18 023 Observation Date: May        _. 2009                                                  Yard Storm Drain              Yard Storm Drain Drainage Location Description Observers Name:                                                                                  None                            None Observation Time
 
==Title:==
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
 
2008-2009 Annual Report SIDE B FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES DATE/TIME OF              DRAINAGE AREA                DESCRIBE STORM WATER DISCHARGE                      IDENTIFY AND DESCRIBE SOURCE(S) OF            DESCRIBE ANY REVISED OR NEW OBSERVATION                  DESCRIPTION                          CHARACTERISTICS                                          POLLUTANTS                      BMPs AND THEIR DATE OF (From Reverse Side)                                                                                                                                              IMPLEMENTATION Indicate whether storm water discharge is clear, EXAMPLE: Discharge from    cloudy, or discolored; causing staining; containing    EXAMPLE: Oil sheen caused by oil dripped by material storage Area #2    floating objects or an oil sheen, has odors, etc.      trucks in vehicle maintenance area.
4-                          4-                                                                                                    4
                    .4.                          L                                                                                                      4
: 4.                                            .4.
4                                                      .4.                                            .4.
4                                                      L
 
2008-2009 Annual Report FORM 5-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE:        05 / 26 / 09 INSPECTOR NAME:    Trevor Rebel      TITLE:          Environmental Coordinator        SIGNATURE:
POTENTIAL POLLUTANT                                                  If yes,. to either      Describe deficiencies in BMPs or BMP implementation            Describe additionallrevised  BMPs or corrective actions and their date(s) of SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN      D YES  quest'on, complete                                                      implementation (as identified in your SWPPP)      FULLY IMPLEMENTED?        0 NO    the next two columns of this Turbine Building                                                            form ARE ADDITIONAL/REVISED    D YES BMPs NECESSARY?          EEJ NO POTENTIAL POLLUTANT                                                                          Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN    1YES    If yes, to either                  implementation            corrective actions and their date(s) of identIDUSnTyour (as identified      ACTIPT in your            FULLAVEYIMPLEMNTBED?      [ NO    question, complete                                                      implementation SWPPP)      FULLY IMPLEMENTED?        1K No    the next two columns of this Turbine Buttress                                                            form ARE ADDITIONAL/REVISED    0l YES BMPs NECESSARY?          [] NO POTENTIAL POLLUTANT                                                                          Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN    01 YES qu    esto, ompeiter If yes, to either                  implementation ipeetto                  corrective actions and their date(s) of orcieatosadterdt~)o (as identified in your SWPPP)      FULLY IMPLEMENTED?        [] NO    the next two columns of this U1 and U2 Transformer Yards                                                form ARE ADDITIONAL/REVISED    01  YES BMPs NECESSARY?          0] NO POTENTIAL POLLUTANT                                                                          Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN    0 YES If yes, to either                    implementation            corrective actions and their date(s) of idUEnIfDUin (as identified inyour ACTPVP) your              FULLAVYIMPLMNOTED? EEN        NO Equestion, complete                                                        implementation SWPPP)      FULLY IMPLEMENTED?        0  NO the next two columns of this Intake Areas                                                                form ARE ADDITIONAL/REVISED    [I YES BMPs NECESSARY?          [K NO
 
2008-2009 Annual Report SIDE B FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE:          05 / 26 / 09  INSPECTOR NAME:    Trevor Rebel      TITLE:        Environmental Coordinator        SIGNATURE:  I -I'*&#x17d;"v            i POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP    Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA          HAVE ANY BMPs NOT BEEN      Cl YES                                implementation              corrective actions and their date(s) of (as identified in your SWPPP)      FULLY IMPLEMENTED?          El NO    If yes, to either                                                  implementation question, Hazardous Waste Facility                                                        complete the next two columns of this form
[I YES ARE ADDITIONAL/REVISED BMPs NECESSARY?              IS] NO POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP    Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN    0l YES                                  implementation              corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?        El NO      If yes, to either                                                  implementation question, Area 10                                                                          complete the next two columns of this ARE ADDITIONAL/REVISED      [I YES    form BMPs NECESSARY?            0] NO POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP    Describeadditional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN      El YES                                implementation              corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?          Mx NO    If yes, to either                                                  implementation question, Sewage Treatment Facility                                                        complete the next two columns of this ARE ADDITIONAL/REVISED      0l YES    form BMPs NECESSARY?            0] NO POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP    Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN      El YES                                implementation              corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?        [91 NO    If yes, to either                                                  implementation question, Sea Water Reverse Osmosis                                                        complete the next two Facility                                                                        columns of this ARE ADDITIONAL/REVISED      El  YES  form BMPs NECESSARY?            Mx NO
 
2008-2009 Annual Report FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE:          06 / 02 / 09  INSPECTOR NAME:    Trevor Rebel      TITLE:        Environmental Coordinator        SIGNATURE:
POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP Describe additionallrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN      0l YES                                implementation            corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?          [K NO    If yes, to either                                                implementation question, Make Up Water Treatment                                                          complete the F i                                                next two Facility                                                                        columns of this form 0l YES ARE ADDITIONAL/REVISED BMPs NECESSARY?            E[ NO POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN      [I YES                                implementation            corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?        l] NO      If yes, to either                                                implementation question, Waste Water Holding Facility                                                    complete the next two columns of this ARE ADDITIONAL/REVISED      El YES    form BMPs NECESSARY?            Xl NO POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN      El YES                                implementation            corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?          1] NO    If yes, to either                                                implementation question, Vehicle Maintenance Yard                                                        complete the next two columns of this ARE ADDITIONAL/REVISED      El YES    form BMPs NECESSARY?            0] NO POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN      Dl YES                                implementation            corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?        [] NO      If yes, to either                                                implementation question, Fleet Vehicle Fueling                                                            complete the next two columns of this ARE ADDITIONAL/REVISED      El  YES    form BMPs NECESSARY?            0l NO
 
2008-2009 Annual Report FORM 5 (Continued)-ANNUAL'COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE:        06 / 02 / 09  INSPECTOR NAME:    Trevor Rebel        TITLE:        Environmental Coordinator          SIGNATURE:    _    _      _    _/_
POTENTIAL POLLUTANT                                                                            Describe deficiencies in BMPs or BMP        Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA          HAVE ANY BMPs NOT BEEN        D YES                                    implementation                    corrective actions and their date(s) of (as identified in your SWPPP)      FULLY IMPLEMENTED?            0 NO      Ifyes, to either                                                            implementation question, Marine Fueling Facility                                                          complete the next two columns of this form O YES ARE ADDITIONAL/REVISED BMPs NECESSARY?              El NO POTENTIAL POLLUTANT                                                                            Describe deficiencies in BMPs or BMP        Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA          HAVE ANY BMPs NOT BEEN      [3 YES                                    implementation                    corrective actions and their date(s) of (as identified in your SWPPP)      FULLY IMPLEMENTED?          ZI NO        Ifyes, to either                                                            implementation question,        Additional improvements are planned to      Additional controls to be implemented next two        reduce potential for transport of sediments including exposed soils stabilization columns of this  and contaminates from the Range.            and/or removal and improvement of form                                                          ammunition traps. Range improvement ARE ADDITIONAL/REVISED      E1 YES                                                                    initiatives planned for completion through BMPs NECESSARY?            01 NO                                                                    the 2009/2010 storm season.
POTENTIAL POLLUTANT                                                                            Describe deficiencies in BMPs or BMP        Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA          HAVE ANY BMPs NOT BEEN        D YES                                    implementation                    corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?          0] NO      Ifyes, to either                                                            implementation question, 500 kV Switch Yard                                                                complete the next two columns of this ARE ADDITIONAL/REVISED        D YES    form BMPs NECESSARY?              [] NO POTENTIAL POLLUTANT                                                                            Describe deficiencies in BMPs or BMP        Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA          HAVE ANY BMPs NOT BEEN        D YES                                    implementation                    corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?            XI NO    Ifyes, to either                                                            implementation question, 230 kV Switch Yard                                                                complete the next two columns of this ARE ADDITIONAL/REVISED        0] YES  form BMPs NECESSARY?              0i NO
 
2008-2009 Annual Report FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE:        06 / 02 / 09 INSPECTOR NAME:  Trevor Rebel    TITLE:      Environmental Coordinator        SIGNATURE:
POTENTIAL POLLUTANT                                                                    Describe deficiencies in BMPs or BMP  Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN    01 YES                                implementation            corrective actions and their date(s) of (as identified in your SWPPP)      FULLY IMPLEMENTED?        [9 NO    If yes, to either                                                implementation question, Remote 12 kV Electrical                                                    complete the Transformers                                                -next                two columns of this form ARE ADDITIONAL/REVISED    E0 YES BMPs'NECESSARY?          IZJ NO POTENTIAL POLLUTANT              HAVE ANY BMPs NOT BEEN    01 YES                    Describe deficiencies in BMPs or BMP  Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        FULLY IMPLEMENTED?        01 NO                                implementation            corrective actions and their date(s) of (as identified in your SWPPP)                                          If yes, to either                                                implementation question, complete the next two ARE ADDITIONAL/REVISED    [0 YES  columns of this BMPs NECESSARY?          01  NO    form POTENTIAL POLLUTANT              HAVE ANY BMPs NOT BEEN    0 YES                      Describe deficiencies in BMPs or BMP  Describe additionallrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        FULLY IMPLEMENTED?        0l NO                                  implementation            corrective actions and their date(s) of (as identified in your SWPPP)                                          If yes, to either                                                implementation question, complete the next two ARE ADDITIONAL/REVISED    0] YES    columns of this BMPs NECESSARY?          0] NO    form POTENTIAL POLLUTANT              HAVE ANY BMPs NOT BEEN    0l YES                    Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        FULLY IMPLEMENTED?        0l NO                                  implementation            corrective actions and their date(s) of (as identified in your SWPPP)                                          If yes, to either                                                implementation question, .
complete the next two ARE ADDITIONAL/REVISED    0] YES    columns of this BMPs NECESSARY?            01 NO    form
 
The following narrative comments provide explanation, where required, for the 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (DCPP),
Facility WDID No. 3401018248.
General Comments:
: 1. Sample and observation times throughout the report are reported in 24-hr clock format.
: 2. This report has been completed in accordance with DCPP's commitment to implement provisions of the State General Industrial Storm Water Permit (General Permit) as outlined in PG&E Letter DCL-2006-556 to the Central Coast Region dated November 09, 2006.
Section Specific Comments:
Comments are arranged by section and item number.
Section E. Number 2. - Did you collect storm water samples from the first storm of the wet season that produced a discharge during scheduled facility operating hours? (Section B.5 of the General Permit).
Checked "No":
A storm event on 10-04-08 produced 0.14 inches of precipitation between 01:00 and 05:00 hours in the morning. This storm generated unexpected rainfall at the plant site outside of normal facility operating hours in which support staff were available and staged to conduct sampling. The next qualifying storm event was sampled on 10-30-08.
Section E. Number 5. - Was the sample collection or analysis reduced in accordance with Section B.7.d of the General Permit?
Checked "Yes":
If "YES", attach documentation supporting your determination that two or more drainage areas are substantially identical.
The following text describes each discharge location and sample point. Additionally, substantially identical drainages, not sampled, are described as required by Section E, Number 5:
Boat - Marine Refueling Facility Runoff
 
==
Description:==
Storm water generated near and around the marine refueling facility.
Sample Point: Sample valve leading from concrete bermed area to final discharge approximately 10-ft away.
003 - Yard Storm Drain
 
==
Description:==
Storm water runoff from areas surrounding the seawater intake structure building.
Sample Point: Sampled at 003 culvert inlet as close to point of discharge as practicable. Storm water travels through the 003 culvert before combining with seawater discharge.
2008-2009 Annual Report Comments Sectiong                                                              Page]iof 5
 
004 - Yard Storm Drain to Retention Basin
 
== Description:==
Storm water drains to discharge 004 from the following areas on site:
  " Southeast side of the Unit 2 Turbine Building,
" Administration Building,
" Security Building,
" Training and Maintenance Shop Buildings,
" Parking lots 4 and 5,
" Meteorological tower area,
" A small area to the west side of the west plant access road,
" Hazardous Waste Storage Unit,
" Firewater storage tank,
" Truck bay, and
" Firewater pump building.
Sample Point: Sampled at the inlet to the 004 retention basin. When full, the retained water in the de-silting basin overflows a vertical riser then flows through approximately 100-ft of underground conduit to discharge.
005 - Yard Storm Drain
 
== Description:==
Storm Water drains to discharge 005 from the following areas on site:
" Independent Spent Fuel Storage Installation (ISFSI),
" Plant Yard on the Unit 2 side of Radioactive Waste Building,
" West side of the Turbine Building,
" Hazardous Materials Warehouse,
" Construction Offices,
" Parking lots 2, 3, 6, 7, and 8,
" Cold Machine Shop,
* Seawater Reverse Osmosis Facility,
" Biological Laboratory (not in service), and
" Fabrication Shop Sample Point: Located in large concrete drainage canal downstream of a de-silting weir. Water flowing past the sample point travels another 600-ft of concrete surface before entering a 4-ft diameter conduit leading to a final discharge location with limited access.
006 - Yard Storm Drain
 
== Description:==
Storm water drains to discharge 006 from the following areas on site:
* Pacific Ocean side of the ridge southeast of the power plant,
* Warehouse B,
* Shooting Range,
* Outdoor Abrasive Blast Facility,
* Fleet Vehicle Fueling Facility, and
* Parking Lot #1 Sample Point 006 at Discharge: Sampled from the culvert outlet as it enters a v-ditch. Storm water travels another 75-ft to discharge at a location with limited access.
Sample Point 006 Range Immediate Outlet: Sampled from culvert outlet immediately downstream of Diablo Canyon Shooting Range. Past the sampling point, storm water traverses 25-ft of concrete v-ditch, combining
*with upstream flows, before entering another underground culvert for 600-ft, then mixing with other 006 pathway flows listed above. Combined storm water then travels approximately 75-ft to outfall. This pathway undergoes significant dilution as all 006 flows combine prior to discharge from the plant site.
007- Storm Water Runoff
 
== Description:==
Storm water from watershed south and east of the facility. There are no industrial activities present in this path. Water discharges to an inaccessible rip-rap field west of the facility.
Sampling: This point is not sampled. The point is not downstream of industrial activities, and the underground conduit discharge location is not safely accessible.
2008-2009 Annual Report Coinnments Section                                                              Page 2 of 5
 
008 - Yard Storm Drain
 
==
Description:==
Storm water yard drains from the following areas:
" Northwest side of the Turbine Building,
" Technical Maintenance Building, and
" Watershed on the north side of Diablo Creek to the northwest of the power plant.
Sample Point: Sample is taken from culvert inlet directly, above discharge point. Note, this area has additional security requirements for access that may result in delayed sample times.
009 - Yard Storm Drain
 
==
Description:==
Storm water from the north and northeast side of the Unit 1 Auxiliary, Containment, Fuel Handling, and Turbine Buildings drains to the north side of the yard to discharge.
Sample Point: Sample is taken from an accessible sump nearest the point of discharge. From the sump, storm water then flows through an underground culvert 300-ft to a discharge location that is not safely accessible during storm events.
010 - Yard Storm Drain
 
==
Description:==
Runoff from the hillside between DCPP and the Raw Water Reservoirs drains into a concrete culvert that is routed to the north along steep inaccessible terrain prior to discharge.
Sample Point: This point is not sampled. Stonn water collected from discharge 013 is substantially identical to this discharge point.
011 -Yard Storm Drain
 
==
Description:==
Runoff from Diablo Creek Road and the north sides of the 230 kV and 500 kV Switchyards.
Sample Point: Sample is taken at the inlet of an accessible drop-in culvert nearest the point of discharge. Storm water then travels another 500-ft across a concrete surface to a steep metal conduit leading to the discharge point. The final discharge point is not safely accessible during a storm event and is in an area subject to restricted security access.
012 - Yard Storm Drain
 
==
Description:==
Runoff from the area between the 230 kV Switchyard and the 500 kV Switchyard drains to a vertical shaft leading to an underground culvert and discharge.
Sample Point: This point is not sampled. Storm water sampled from discharge 011 and 013 are substantially identical to this discharge point.
013 - Yard Storm Drain
 
==
Description:==
Storm water drains to 013 from the following areas:
E Raw Water Reservoirs, 0 Makeup Water Treatment Facility, and 0 230 kV Switchyard Sample Point: Sample taken from a sample well in the 013 concrete v-ditch. Water flows an additional 200-ft before entering an inaccessible metal conduit to discharge.
014 - Storm Water Runoff
 
==
Description:==
Storm water runoff from lay down areas and the hillside south and east of the 500 kV Switchyard is collected in a drainage ditch and routed to discharge.
Sample Point: This point is not sampled. Storm water sampled from discharge points 013 and 015 are substantially identical to this discharge point.
015 - Yard Storm Drain
 
==
Description:==
Storm water runoff from the area around the temporary auto facilities and adjacent roadway is collected in a drainage ditch and discharged.
Sample Point: Sample taken from drop-in culvert downstream of automotive facility. After the sampling point, water flows 100-ft through an inaccessible culvert to a rip-rap field and discharge.
2008-2009 Annual Report Comments Section                                                                Page 3 of 5
 
018 - Yard Storm Drain
 
==
Description:==
Storm water runoff from the east side of the Intake Structure Building.
Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.
020 - Intake Deck Storm Drain
 
==
Description:==
Storm water collected directly in front of the seawater traveling screen housings drains to the circulating water pump fore bays through open gratings.
Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.
021 - Yard Storm Drain
 
==
Description:==
Screen wash over spray drains and storm water from the east side of the traveling screen deck.
Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.
023 - Yard Storm Drain
 
==
Description:==
Storm water generated on the north and east sides of Intake Structure Building and Intake roadways is drained through discharge point 023.
Sample Point: Sampled at the drop-in box culvert inlet approximately 10-ft prior' to discharge.
Section E. Number 6. - Were all samples collected during the first hour of discharge?
Checked "No":
First storm event sample point 008 yard storm drain discharge started at 10-30-08, 22:00 hrs. The sample was collected at 23:46 hrs due to safety and security concern delays for personnel performing collection.
Second storm event sample point 008 yard storm drain discharge started at 02-22-09, 02:55 hrs. The sample was collected at 04:20 hrs due to safety and security concern delays for personnel performing collection.
Second storm event sample point 009 yard storm drain discharge started at 02-22-09, 02:25 hrs. The sample was collected at 03:28 hrs due to safety and security concern delays for personnel performing collection.
Section E. Number 9. - Did you collect and analyze samples of temporarily stored or contained storm water discharges from two storm events?
Checked, "Yes", with the following clarifying information:
Sample point 004 for both the first and second storm events were sampled as a pre-release. The 004 discharge path first fills a settling basin before flowing through a riser pipe to discharge.
Section E. Number 11. - Discharge Location and Sample Point Reference narrative comments for Section E. Number 5, above, for a description of discharge and sample point information.
2008-2009 Annual Report Comments Sectiong                                                              Page 4 of 5
 
Section G. Number 1. - Monthly Wet Season Visual Observations Attach an explanation for any "NO" answer months.
October 2008 - No qualifying storm events producing discharge to waters of the state during day light hours.
December 2008 - No qualifying storm events producing discharge to waters of the state during day light hours.
January 2009 - No qualifying storm events producing discharge to waters of the state during day light hours.
February 2009 - No qualifying storm events producing discharge to waters of the state during day light hours.
March 2009 - No qualifying storm events producing discharge to waters of the state during day light hours
*May2009 - Insufficient precipitation for May 2009.
2008-2009 Aniual Report Coinmments Section                                                          Page 5 of 5
 
Creek Environmental Laboratories, Ilnc.                                                                        4            Chain-of-Custody 141 Suburban Road, Suite C-5, San Luis Obispo,*CA 93401 phone (805) 545-9838 fax (805) 545-0107 www.creeklabs.com sales@creeklabs.com                    Order # F-:*1
.      Please Print inPen                  ,Di                              OW EDT              E  COFTEDF          LI    Custom EDD Client Name                                                  Contact t,          t-"o        _.e*N  o]                                                                  Phone      r[Due                              Date:
2L"                                                  3(7*                    24Hr        48Hr Other          NormalTAT Address                                        City                State        Zip                    Fax                                  Cell
                                      ,/*-,,L-A-- *  -Cf~/"--      off-                                      'S1/2._ S" 74 Project Name/Number                                                                                                                  -        Beeper . Y-4.)            ._*&#xfd;&#xfd;3-PO#                                  Copies-To:
Bill to: (if different from above)                          Address                                  City                                      State                Zip
[Sampler Name (Print)'                                  Comments-7-t3/.                  PI-
                              .*. P                                  4J--        *' Arl&#xfd;=A-C                                                  Matrix Key: DW Drinking Water
                                                                                                                /                              AQ = Aqueous            SL = Soil/Solid Date/Time                                                                # of Sample Description                                    Sam led            Analysis                                    Matrix  Bottles    Preservative I Type Bottles    Creek Lab Sample #
o'.                                  2z 0-      M JO'Y 0 71: ?-"1) 1.. y                        N07    0-2-7-N        _  _  _ _  _  _  _
Pr-"10 /                            ,*0                r q.M
                                                                                                                                        .j..          ..          1151.R.*. ..
A-&              IN                                            NNE'-
a                              gk 01~-    's  .Or    X (Sign)
RELINQUISHED BY
                            .        *o'<.
(Print)              (Organization)
DATE/TIME              RECEIVED BY (pint)                              .(Organization)
Creek Environmental              I T,ahoratorias. Inc
 
Creek Environmental Laboratories, Inc.                                                                                    Chain-of-Custod 141 Suburban Road, Suite C-5, San Luis Obispo, CA 9340)1 phone (805)545-9838 fax (805)545-0107 www.crelabs.com sales@creeklabs.com        Order #      1
* Please Print in Pen                !                                  DW EDT          ED LUFT EIF        El  Custom EDD C      lient NPhoneN                                                Cotact                                                          Due Date:
AT7/          -e24Hr.                                                              48Hr Other Normal TAT Address                  P        ~V/fy  S7city lt4~
1            State
                                                            -~Beepe*'/O'                    -            Fax*  -                Cell. 2 o'-
PCO#                  Copies To:
Project Name/Number Bill to: (if different from above)                          Address                                  City                        State        Zip Sampler Name (Print)                                    Comments:                                                                  Matrix Key: DW = Drinking Water 7'*      'O                          C-                    7,            ,"
A4    4-.j*i2S. 7  ft  /-                            AQ = Aqueous SL = Soil/Solid Date/Time                                                          # of Samole Descrintion                                    Sampled            Analysis                                Matrix Bottles
                                /7                        2*      -                          "AIL-"
0/7  _    ,  ,,
00>;'              z4-RELINQUISHED BY                                                  DATE/TIME              RECEIVED BY
 
Creek Environmental Laboratories, Inc.                                                                                      Chain-of-Custod 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 www.creeldabs.coin saes@creeklabs.com
                                                                                                                                                    ,Order #  .          [
0    01      DA&#xfd;+; 'D lr-~  =rl,+T M  ". Lr cnc          r- a-,ok      r Client Name Z*/>CL* c#-* /!    t -r*:,,,,,z-_z~espc -
Contact
                                                                                                      !1*"*      !*          7.i        Due Date:
                                                                                                                                        -l24,Hr  48Hr. Other" Vdress                                    City                                                                                                                Normal TAT State          ?Zip                                            __        Beeprll~
Project Name/Number PO#                                Copies To:
Bill to: (if different from above),                      Address Samer*      Name* (Print)Comments:                                                                City                                  State        Zip.
                                                                                -7"                'Matrix                                      Key: DW =:Drinking Water
                          -                                                      iAQ    *                              .    :..    .:        = Aqueous SL = Soil/Solid.
Date/Time.                                                        mat #of    :.i Sample Description                                    Sampled                                                      Matr~ix Bottles    Pbres, Analysis o R0  E LINQUIr-  Z        BY-                                    DATE/TME C              R.ECIE        B RELINQUISHED BY                                                DATEITIME            . RECEIVED BY :
 
Creek Environimental Laboratories, Inc.                                                                                                                        Chain-of-Custody 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 www.creeklabs.com sales@creeklabs.corn                                                      Order #                  -I.,4 Please Print in Pen                                                            LI-I  DW EDT                    0      LU FT'EDF            E-      Custom EDD Client Name                                  !                      contact                                                            Ph)[Due                  (_ O          24HrDate: 48Hr.: Other          NormalTA t'Q          L-*.-,
y                                771---1          ,!2..
Address                              /      i    C city                            State              Zip                                a                                    Cell FI            0)                                __f__*_-__-              CA-                          9b                                                    3' V*7            Beeper        (      .L-Project Name/Number                                                                                                                    PO#                                  Copies To:
    *-ro 9-w                              _._
Bill to: (if different from above)'                            Address                                                          City                                        State                Zip Sampler Name (Print)                                        Comments:                                                                                                          Matrix Key: DW = Drinking Water
                                              ,      -T                                          .AIAQ                                                                              = Aqueous SL = Soil/Solid Date/Time                                                                                          #of Sample Description                                          Sampled                  Analysis                                                      Matrix    Bottles Preservative/ Type Bottles    Creek Lab Sample #
N-7c--"-C)~'                                          ,..                                    -.
VOo /.-*R -L..1.-. *..        )*M &,), :01
                                                                                                                                                                                                          ''M,
______________________________________              ~          "~tJ          ~    Aa-~-        )~~  .~-'
IN-                1
                                                                                                                                                                                                              ~*-
                                    .~  ~~~~  "--T(Pit RELINUISHE                  BY--              DAE/M    ~            ~            ~
REEIE        ~      ~~~~~NO BY-      ..                                                    .7*.-..........
                                                                                                                                                                                                                          .(inf
                                                                                                                                                                                                                          .v*-*"f
                                                                                                                                                                                                                          .~*'-Ogaiain
                                                                                                                                                                                                                          .. .Organizati (Sign)~~~~~~      ~  ~          ~
(raiato)(ig)(rnt  ~        ~ (Pit                                                                                                  Ogniain I
1&#xfd;- i1--ox<%A1'A-1z-2                                V                  L~  J2J~bT Creek Environmental n~hnwrafn,4pe T-ni
 
Creek Environmental Laboratories, Inc.                                                                                                Chain-of-Custody 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 www.creeklabs.com salesccreeklabs.com                            Order # .V--*&#x17d;Dif S    PIease Print in Pen                                              M  MAI 1:11T              F-- I l    rT=r-          F      ,        n ClientQ> Name
          &#xfd;-/'_L__'* <n'=    C,-h-'1&#xfd;,    CAI/              Contact "1-"k-O,* 04&#xfd;      -I.-,*        t...          t Ph "      '---./=      "7            Due Date:
24r8Hr            Other          NormalTA Address                                        City                State          ZiG f*        6          Sk4                                                                                      Fax N-Cll3,..*/Cell PrJ "L.A- A    -                                  --
Project Name/Number                                                                                                                                    Beeper PO#                                    Copies To:
Bill to: (if different from above)                        Address                                        City                                          State              Zip Sa._r        Nae (Print)                              Comments:
2_.      i      lL----                                                                                                              Matrix Key: DW = Drinking Water
                                                              .. v&.n              /T        ...      ":          -AQ                                    = Aqueous SL = Soil/Solid Date/Time                                                                        # of Sample Description                                  Sampled          Analysis                                                Matrix  Bottles    Preservative Type Bottles    Creek Lab Sample #
I -,,**
                                                                                                                                                                                -                2 ,--
10-
                                                                                                                                      -                  k        Mg i
Tf 5*-Soil-ON RELINQUISHEDI YDA                      /TME                                    BYN&#xfd;'                                  7EEIE                        --
1170~            I'sCI I
i /Creek                                      Environmental I~                                                    IC %A          )    CJ'Q I TharnIripc Tn _
* CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 *(805')                                                    545-9838 - FAX (805) 545-0107 Page .8 Trevor Rebel                                                                                              Log Number:                    08-C15125 Diablo Canyon. Power Plant                                                                                Order:                          P5698 P.O. Box 56                                                                                                Project:                        Storm Water Set #1 Avila Beach, CA 93424                                                                                      Received:                      10/31/08 Printed:                        11/11/08 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                                                      Sampled By                                            Date @ Time                          Matrix Boat-2008-I                                                              Trevor Rebel                                          10/30/08@22:11.                            Aqueous
      =====
          ===== ====                -------------              ===
Anatyte                                                                    Result                    DLR              Dilution                    Units                  Method        Date      Date  Batch Factor                                                        Analyzed  Prepared 10/31/08  7 -      2723 Electrical Conductance                                                2,300                            1                        1              umhos/cm            SM 2510B 10/31/08            2723 pH                                                                            .6.9                      0.1                    1                pH units            SM 4500-H B Total Suspended Solids                                                    530                          5                      1              -mg/L                SM 2540D      11/05/08            2865 Total Organic Carbon                                                      100                        20                      100                mg/L                SM 5310B      11/06/08            2915 Iron                                                                        31                        0.2                    10                mg/L                EPA 200.7      11/10/08  11/07/08 3040 DLR= Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 14 1 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 - (805) 545-9838        FAX (805) 545-0107 Page 6 Trevor Rebel                                              Log Number:        08-C15123 Diablo Canyon Power Plant                                  Order:            P5698 P.O. Box 56                                                Project:          Storm Water Set #1 Avila Beach, CA 93424                                      Received:          10/31/08 Printed:          11/11/08 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                      Date.@ Time          Matrix 003-2008rl                            Trevor Rebel                      10/30/08@22:05            Aqueous Analyte                                Result        DLR        Dilution        Units          Method          Date      Date  Batch Factor                                      Analyzed    Prepared 10/31/08            2723 Electrical Conductance              4,400              -1              1        umhos/cm  -  SM 25108 10/31/08              2723 pH                                        6.7            0.1            1        pH units    SM 4500-H B 11/05/08 Total Suspended Solids                  520              5              1        mg/L          SM 2540D                              2865 11/06/08 Total Organic Carbon                    76              4            20        mg/L          SM 5310B                              2915 Iron                                    19              0.2          10        mg/L          EPA 200.7      11/10/08    11/07/08  3040 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER
* CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C
* SAN LUIS OBISPO, CA 93401 '- (805) 545-9838
* FAX (805) 545-0107 Page 9 Trevor Rebel                                              Log Number:        08-C15126 Diablo Canyon Power Plant                                  Order:            P5698 P.O. Box 56                                                Project:          Storm Water Set #1 Avila Beach, CA 93424                                      Received:          10/31/08 Printed:          11/11/08 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                  Sampled By                        Date @ Time          Mn*P*w 004-2008-1                          Trevor Rebel                      10/30/08@22:13            Aqueous Analyte                              Result          DLR        Dilution        Units          Method. Date      Date  Batch Factor                                    Analyzed  Prepared 10/31/08 Electrical Conductance              3,600                I              1        umhos/cm      SM 25108                        2723 10/31/08 pH -                                    6.9              0.1            1        pH units    SM 4500-H B                        2723 Total Suspended Solids                25O                5              *1        mg/L        SM 2540D    11/06/08            2933 Total Organic Carbon                                                    50        mg/L 120              10                                      SM 5310B    11/11/08            3055 10                                                      3056 Iron                                    7.5              0.2                      mg/L          EPA 200.7    11/11/08 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER
 
                      .CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C
* SAN LUIS OBISPO, CA 93401 -        (805) 545-9838 a FAX (805) 545-0107 Page  .0 Trevor Rebel                                                Log Number:        08-C15127 Diablo Canyon Power Plant                                    Order:.            P5698 P.O' Box 56                                                  Project:            Storm Water Set #1 Avila Beach, CA 93424                                        Received:          10/31/08 Printed:            11/11/08 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                        Date @ Time            Matrix 005-2008-1                            Trevor Rebel                      .10/30/08@22:23              Aqueous AnaLyte                                  Result          DLR        Dilution          Units            Method        Date      Date    Batch Factor                                        Analyzed  Prepared 10/31/08              2723 Electrical Conductance                1,400                1              1        umhos/cm      SM 2510B 10/31/08              2723 pH                                        7.0            0.1              1        pH units      SM 4500-H B    11/06/08 Total Suspended Solids                  160              5                1        mg/L          SM 2540D                            2933 11/06/08 Total Organic Carbon                      94              4              20        mg/L            SM 5310B                            2915 Iron                                      5.8            0.2            10        mg/L            EPA 200.7    11/11/08              3056 DLR = Detection Limit. for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng C) PRINTED ON RECYCLED PAPER
 
SCREEK              ENVIRONMENTALLABORATORIES, A Minority-owned Business Enterprise INC.
141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401      * (805) 545-9838 a FAX (805) 545-0107 Page 1 Trevor Rebel                                              Log Number:      C15118 Diablo Canyon Power Plant                                  Order:            P5698 P.O. Box 56                                                Project:          Storm Water Set #1 Avila Beach, CA 93424                                      Received:          10/31/08 Printed:          11/11/08 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                        Date @ Time            Matrix 006 Outlet-2008-1                    Trevor Rebel                      10/30/08@23:12              Aqueous Analyte                                Result          DLR.      Dilution        Units            Method        Date      Date  Batch Factor                                      Analyzed  prepared 10/31/08 Electrical Conductance                360                                        umhos/cm      SM 2510B                          2723 10/31/08 pH                                      7.1            0.1              1        pH units      SM 4500-H B                        2723 Total Suspended Solids                  28              5                1      mg/L            SM 2540D      11/05/08            2865 Total Organic Carbon                    52              4              20        mg/L            SM 53108      11/06/08            2915 Iron                                    2.1            0.2            10        mg/L            EPA 200.7    11/10/08  11/07/08 3040 DLR = Detection Limit for Reporting. Results of "Not Detected"' are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng C, PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 1 Trevor Rebel                                              Log Number: 08-C15115 Diablo Canyon Power Plant                                Order:              P5695, P.O. Box 56                                              Project:          Storm Water Avila Beach, CA 93424                                    Received:          10/31/08 Printed:          11/10/08 REPORT OF. ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                        Date @ Time        Matrix 006 Outlet-2008-1                    Trevor Rebel.                    10/30/08@23:12          Ac~ueous Analyte                                Result        DLR        Dilution        Units            Method  . Date        Date  Batch Factor                                Analyzed    Prepared 200.8  11/07/08    10/06/08 2940 Chromium                                0.008          0.001          1        mg/[        EPA                    10/06/08  2940 200.8  11/07/08 Lead                                    0.032          0.001          .1        mg/L        EPA                    10/06/08  2940 200.8  11/07/08 Nickel                                  0.018          0.001          1        mg/L        EPA 20.8.. 11/07/08...
DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES lab Director, Michael-Ng PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
C A  I                                    A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 - (805) 54.5-9838
* FAX (805) 545-0107 Page 1 TrevQr Rebel-                                              Log Number:        08-C15116 Diablo Canyon Power Plant                                  Order:              P5696 P.O. Box 56.                                            Project:            Storm Water Set #1 Avila Beach, CA          93424                            Receivedi          10/31/08 Printed:            11/11/08 REPORT OF ANALYTICAL RESULTS, Sampled Sample Description                    Sampled By                        Date @ Time          -Matrix
===== ---------- --------------  ===
006 Range-008-1                      T. Rebel                          10/30/08@23:01              Aqueous Anatyte                                Result          DLR        DilL ution        Units            Method          Date
* Date    Batch Fac :tor                                        Analyzed  Prepared
                                                                                                                  -10/31/08-ELectrical Conductance                520                1              1        umhos/cm      SM 2510B        10/31/08'            2723 pH                                      6.9              0.1            1        pH units      SM 4500-H B      10/31/08              2723 Total Suspended Solids                  54                5              1        mg/L    . SM 2540D        11/05/08              2865 Total Organic Carbon                    98              10              50        mg/L          SM 5310B        11/11/08            '3055 Iron                                    1.7              0.2            10        mg/L          EPA 200.7        11/10/08  11/07/08  3040.
DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER
 
SCREEKENVIRONMENTAL LABORATORIES, INC.
                          ~'L  --      -    .A                      Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 - FAX (805) 545-0107 Page I Trevor Rebel                                                          Log Number:          08-C15114 Diablo Canyon Power Plant                                              Order:              P5694 P.O. Box 56                                                            Project:            Storm Water Avila Beach, CA 93424                                                  Received:            10/31/08 Printed:            11/07/08 REPORT OF ANALYTICAL RESULTS Sampled .
Sample Description                            Sampled By                            Date @ Time          Matrix 006-Range-2008-1                              Trevor Rebel-                        10/30/08@23:01            Aqueous
    =================            .. . ==
                        ---------- -----  . .  . . .  .  . . . .  .  .  .    ...        = = == = ==  = =
AnaLyte                                        Result            DLR        Dilution          Units          Method  Date    Date  Batch Factor                                Analyzed Prepared Lead                                              0.30                0.001            1        mg/L        EPA 200.8 11/07/08 10/06/08  2940 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES
                                                                                    .011 Lab Director, Michael Ng
                                                                'PRINTED ON RECYCLED PAPER
 
SCREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 0141          SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 - (805) 545-9838
* FAX (805) 545-0107 Page 5 Trevor Rebel                                            Log Number:        08-C15122 Diablo Canyon Power Plant                                Order:            P5698 P.O. Box 56                                              Project:          Storm.Water Set #1 Avila Beach, CA 93424                                    Received:          10/31/08
                                                              .Printed:          11/11/08 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                  Sampled By                      Date @ Time          Matrix 008-2008-1                          Trevor Rebel                    10/30/08@23:.46          Aqueous Analyte                              Result        DLR        Dilution        Units          Method    Date      Date    Batch Factor                                  Analyzed    Prepared 10/31/08---            2723-------..
Electrical Conductance              5,800              1              &#xb6;        umhos/cm    SM 25108  10/31/08              2723 6.6                                      pH units  SM 4500-H B  10/31/0&"              2723 pH                                                    0.1            1 Total Suspended Solids                58              5              1        mg/L          SM 2540D  11/05/08              2865 Total Organic.Carbon                  93              4              20        mg/L          SM 5310B  11/06/08              2915 Iron                                    2.2            0.2            10        mg/L          EPA 200.7  11/10/08    11/07/08  3040 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng C PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C
* SAN LUIS OBISPO, CA 93401            - (805) 545-9838
* FAX (805) 545-0107 Page 11 Trevor Rebel                                                    Log Number:        08-C15128 Diablo Canyon Power Plant                                        Order:              P5698 P.O. Box 56                                                      Project:            Storm Water Set.#2 Avila Beach, C'A 93424                                          Received:          10/31/08 Printed:            11/11/08 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                      Sampled By                            Date ) Time            Matrix 009-2008-1                              Trevor Rebel                          10/30/08@22:45              Aqueous.
                                                    --------------==== ===                            ---------------        === == ==  ==  == == ==
Analyte                                  Result              DLR        Dilution        Units            Method          Date        Date    Batch Factor                                        Analyzed    Prepared
                                                                                                                        ... 0/31/08...........
Electrical Conductance                  740                    1              1        umhos/cm        SM 2510B      10/31/08                2723 pH                                        7. (r                0.1            1        pH units      SM 4500-H B      10/31/08                2723 Total Suspended Solids                    6                    5              1        mg/L            SM 2540D        11/06/08                2933 Total Organic Carbon                      16                    1              5        mg/L            SM 5310B        11/06/08                2915 Iron                                      1.7                  0.02            1.      mg/L            EPA 200.7      11/11/08                3056
                    -.-- for Repo DIR-----Detection L-mit      -- ting..Resu
                                  --    --        .ts" ot....Detected"
                                                    .of          ..        .
are-bo      ..                                ---------..-.---------
DLR = Detection Limit for Reporting. Resutts-of "1Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng C.1 PRINTED ON RECYCLED PAPER
 
ICREEK                ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C          *'SAN      LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 4 Trevor Rebel                                                          Log Number:          08-C15121 Diablo Canyon Power Plant                                              Order:              P5698 P.O. Box 56                                                            Project:            Storm Water Set #1 Avila Beach, CA 93424                                                  Received:            10/31/08 Printed:            11/11/08 REPORT OF ANALYTICAL RESULTS Sampled Sampte Description                    Sampled By                                    Date alTime          Matrix 011-2008-1                            Trevor Rebel                                    10/30/08@23:36            Aqueous Analyte                                  Result                  DLR            Dilution        Units        .Method      Date        Date    Batch Factor                                  Analyzed  Prepared 10/31/08 Electrical Conductance                  470                        1                1        umhos/cm    SM 2510B                          2723 10/31/08 pH
* 6.8                    0.1                1        pH units    SM 4500-H B                        2723 11/05/08 Total Suspended Solids                    33                      5                  1        mg/L          SM 2540D                          2865 11/06/08 Total Organic Carbon                      94                      4                20        mg/L          SM 5310B                          2915 Iron                                        1.9                    0.2              10        mg/L          EPA 200.7  11/10/08  11/07/08    3040 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng C) PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A                                          A Minority-owned Business Enterprise
                    'h      141 SUBURBAN ROAD, SUITE C - SAN LUI5 OBISPO, CA 93401 - (805) 545-9838 e FAX (805) 545-0107 Page 2 Trevor Rebel                                                Log Number:          08-C15119 Diablo Canyon Power Plant                                    Order:              P5698 P.O. Box 56                                                  Project:            Storm Water Set #1 Avila Bedch, CA 93424                                        Received:            10/31/0'8 Printed:            11/11/08 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                      Sampled By                        Date @ Time          Matrix
                                                                                                  -- Aqueo--us    ---------
013-2008-1                              Trevor Rebel                        10/30/08@23:25            Aqueous AnaLyte                                  Result          DLR        Diluution        Units          Method    Date              Date      Batch Fac tbr                                Analyzed            Prepared 10/31/08.............
Electrical Conductance                  350                1              1        umhos/cm    SM 2510B  10/31/08                        2723 pH                                        .7.0            0.1              1        pH units  SM 4500-H B  10/31/08                        2723 Total Suspended Solids                    48                5                1        mig/L        SM 2540D  11/05/08                        2865 Total  Organic Carbon                    70                4              20          mg/L        SM 5310B  11/06/08                          2915 Iron                                      2.7              0.2            10          mg/L        EPA 200.7 11/10/08            1-1/07/08    3040
------  Detection-L-it-for-Reportin. ResultsofNotDetected" are...........................
beow D........                      -.. - - - - - - - . . ------ ---
DLR =  Detection Limit for Reporting. Resul ts of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Q  PRINTED ON RECYCLED PAPER
* CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITrE C a SAN LUIS OBISPO, CA 93 401 o (805) 545-9838 o FAX (805) 545-0107 Page 3 Trevor Rebel                                              Log Number:        08-C15120 Diablo Canyon Power Plant                                Order:            P5698 P.O. Box 56                                              Project:          Storm Water Set #1 Avila Beach, CA 93424                                    Received:          10/31/08 Printed:          11/11/08 REPORT OF ANALYTICAL RESULTS Sampled
-Sample Description                    Sampled By                        Date @ Time          Matrix 015-2008-1                            Trevor Rebel                      10/30/08@23:28            AcIueous Analyte                                Result          DLR        Dilution        Units            lethod M          Date      Date  Batch Factor                                    Analyzed  Prepared 10/31/08            2723 Electrical Conductance                380                1              1      uinhos/cm    SM 2510B    10/31/08            2723 pH                                      7.2            0.1              1      pH units    SM 4 500-H B Total Suspended Solids                  97              5              1        mg/L        SM 2540D      11/05/08            2865 Total Organic Carbon                    64              4              20        mg/L          SM 531 OB    11/06/08            2915 I ron                                    5.3            0.2            10        mg/L        EPA 200.7    11/10/08  11/07/08  3040 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES.
Lab Director, Michael Ng Q? PRINTED ON RECYCLED PAPER
 
0    CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise -
141 SUBURBAN ROAD, SUITE C a SAN LUIS OBISPO, CA 93401 & (805) 545-9838
* FAX (805) 545-0107 Page 7 Trevor Rebel                                                Log Number:        08-C15124 Diablo Canyon-Power Plant                                  order:            P5698 P.O. Box 56                                                Project:          Storm Water Set #1 Avila Beach, CA 93424                                      Received:          i0/31/08 Printed:          11/11/08 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                        Date @ Time            Matrix 023-2008-1                            Trevor Rebel                        10/30/08@22:00            Aqueous Ana lyte                            I Result            DLR        Dilution        Units            Method  Date    Date  Batch Factor                                  Analyzed Prepared 10/31/08 Electrical Conductance              2,800                  I              I        umhos/cm      SM 2510B                    2723 10/31/08 pH                                      6.3              0.1              1        pH units    SM 4500-H B                    2723 Total Suspended Solids                550                5                I        mg/L          SM 2540D  11/05/08          2865 Total Organic Carbon                  120              20            100        mg/L          SM 53108  11/06/08          2915 Iron                                    29                0.2            10        mg/L          EPA 200.7  11/10/08 11/07/08 .3040 DIR _Detectin-Limi-for-Rportin....-
          -                          Results..--
of      -------- -Nt.etctd.ar .b D.---
DLR =Detection Limit for Reporting. Results of ".Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Q1  PRINTED ON RECYCLED PAPER
 
reek Environmental Laboratories, Inc.
141 Subu-rban'R6ad,Suite. C5, San Lu                is6bispo, CA 93401 'phone (805) 545-9838 fax (805) 545-0107 www.creeklabs.comrsales@cieeklabs
                                                                                                                                                    ,          Chain-of-Custody
                                                                                                                                                                .    -          corn
                                                                                                                                                                                -.. . .        Order.#            L'".
P 'leasePtrin tn.
n  Ien            .i uv  -    -_J r    LUPI- II    I " -.
r      -USIOm          -U U-Client Name.'-                                                                      Contact                                                o                                        Due Date:        :
              ..                    ,        .                .                  -r ,    \'  '
24H r "48Hr O ther          . ormI Address                                                -    iyState                                        Zip                      Fax'            :t$~                      CeLl-                      S-L rz..* .            .    ....    -J .: .      ...-.            .Beepe-          .,-.-                        .-                    * .  ...-                            B    e'.                              .
Project:Name/Number                                                                                                                      PO#                                .      Copies To:
Bill to: (if different from above)                                              Address                                          City                                              State+            Zip.+
Sampler Name (Print)                  .                                      Comments:                                                    "mple                                  IMatrix .Key: DW = Drinking Water
                                  - . . . . .- - ,- .      ..        ".              - '        /,        ,    /                .-                                            I .AQ -Aq u e o u s S L = S o il/So lid Date/Time                                                                          #.of Sample Description                                                  .      Sampled              Analysis                                            Matrix Bottles          Preservative Type Bottles    Creek Lab Sample#'
7                                            'M                                                                                                                                                            R 2-)2    '-
                  -              -            "-                "..                                                                                            .                                                          .N N
                  -          -      %    .. . .      ,J
: 0)      -2      .)  x                                                                                                                                                                              5T---~4
                                                                      *    .                                                                                --                                                          ,* z*
                                                                                                                                                                      . ..~. .                              N 1 L...MA ..'!
RELINQUISHED BY                                                                              DATE/TIME +            RECEIVED BY              -..
  &#xa3;4 (Sign)
                                    ,-L4*
                                              .:(Print).
:-L_--
(Organization)
(Sign)
I__
(Print)
(Organization)
I.
                                                                                                                                                                          . ../*
S!'            Creek'Environmental
                                                                                                                                                                                              ".t , ,;* X.*ST*,          " ..
I                          4~.w,
 
Creek Environmental Laboratories, Inc.                                                                                        Chain.of-Custody 141 Suburban'Road, Suite C-5,:'SanLuis"ObispoCA          phone (805) 545-9838 fax (805) 545-0107 www.creekiabs corn sales@creeklabs. cor:'
p93401"                                                                                    Order #
  - Plpae Print in Pen :-.                                                DW EDT              El] LU FT.EDF  ''            CustomEDD
      . Name .Client et.. .    ....                              Contact                                      Phone.                          D      te
                              .  .  ... ::"J    '" "                          ~            "                  .... :".*'    -3 7 :.24Hr        :48HrOther .6, Address                                        City                State        Zip                      Fax                              Cell
____________________________L                                                                                                  Beeper Project Name/Number                                                                                      PO#                              copies To:
Bill-to: (ifdifferent from above)                        Address                                    City                                State    -      Zip Sampe Name (Print)                                      Comments:                                                                          MatrixKey: DW= Drinking Water Sr IV                    -    .    ...        Cmens        .                                <J.      "                      I AQ='Aqueous" SL = Soil/Solid Date/Time                                                                #of Sampled
 
Creek Environmental                                            Laboratories,                          n.4                            Cano-utd 141 Suburban Road, Suite C5San          Luis Obispo, CA      93401 phoine.(80)  545-9838 fax (805) 545-0107  www creekiabs corn      sales@cre~eklabs corn            Order #
    *Please    Print in Pen  -Li                                                      DW EDT              LI  LU FT EDF:            LJ. .CustomED&
[Client Name-&#xfd;                                                            CnatjPhgn                                                                          Due. Date:
P.~t*~r                        7~~                  2Hr48Hr OtherNdmIAI Address                                          City          "              State        Zip                      Fax                                  Cell*e C          -              -i I    T-Project Name/Number                                                                                                  PO#                                  Copies-To:
Bill, to:.(if different from' above).                                Address                                    city                                      -State:              Zip."
:.SamplerK*#/**.
Name (Print). I Z_ f_->*,L--:              ..      Comments:.,L ,:A            ,-
                                                                                              <  ~"<*-                  ---  i-i- .,
                                                                                                                              ,,.-.*                ..      Matrix    Key: DW=Drinking AQ =Aqueous            SL =Soil/SolidWater Date/Time                                                                    #of Sample Description                                              Sampled          Analysis                                          Matrix Bottles. Preservative IType Bottles. Creek Lab Sample #
MJ-,
                                                .~i'                                                                                                                x.          U@...,
* RELINQUISHED,.BY.                        ",.                              DATE/TIME                RECEIVED BY.                -      .;U..:.          . *        :...::"*,.
(sign)        ..---.. - ----...-.--- .. (Print)'  -.    . '.  "  (O g nization)    .      "'(Sign).              ]  .            :  -. (Print)      . ;i.!:        .: .*o g nzain 4-A-*                                                                                  *
* CreekEnvironmental
 
Creek Environ en a.c-Chain-of-Custody                        Laboratories, I ncT.
141 Suburban' Road, Suite C-5, Sa'n.Luis.Obispo, CA .93401ophone. (805) 545-9838 fax (805) 545-0107 www.creekiabs. comrnsaLe@creeklabs.co.r                  Orderl#. ___
* a    non Print in Pan        .:IAI. "T            ..    .T          F"                    F."" iI-.
                                                                                                        ,                ]-,q" ',oiitA rirf,                  *'i Client Name.                                      -          Contact                                        P    ne                            Due.Date:                    -
_______,.____-_"__*______________-____"_'____________.                    ____-_--_N..._,u__L      _-_        ..                              24Hr_, .48Hr. Other:        .ormal TAT Address ..                                    .                      State        Zip                        Fa    4  .                        Beeper . L.    *
                                                                                    -77I,  2.__f_.
__Beeper._"L_._____
tName/Number                                                                                        P                                  Copies To:...
                          \'.
v.," v.                                                                                                            ".,        .    -
Bill to:,(if different.from .above)                          Address                                      City                                  State            Zip Sampler Name (Prii                                                                                                                                .Matrix Key:.DW =Drinking Water
            ,F.f . C .                                                                                                                            AQ ='Adueous SL-=Soil/Soiid 1le
:(Organization) i            -          . i K
                                                                                                                                                          ..cCreek Env'ronmental
 
Creek.Environmen talLaboratories, Inc*                                                                                                            Chain of Custody 141 Suburban Road,. Suite C-5,          San Luis  Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 www.creeklabs.comrsales@creeklabs.comr                              Order #.                  ..
F  n,.nr                  F      ~    n          FlI        .        n-                              K Client Name                                                                                                                PhoneP                                  Due Date' :
DueContact                .a. , . A. .
L~~i::.i
: t.    .... . .' i*% .. ,*i    i 4,*    .. -.    .    . T.    , ,1*            .
* tel                  2* N-        "      -:              .24Hr- 48Hr"Other: 1.ormal TAT Address  f>,...
        .f ,*f        .N/        ".        i~
1,    \ Clt city z,,.rl,/a            State
                                                                                ,ciA            Zip
                                                                                                *-,Z-LI;. L              F/"  ...                              C..- p r Be          .  .          *    \*--        -
Project Name/Number                                                                                                        PO#-                                    Copies To:.
Bill to: (if different from above) .                                    Address                                      City                                        State                Zip Sampler Name (Print)                                                Comments:.                                                                                    Matrix Key: DW          = Drinking Water
                                -.. .-.  .        -            -  ,                          , V                    -,-r            -AQ                                =Aqueous.          SL=Soil/Solid Date/Time                                                .of Sample Description    /~                                          Sam led.          Analysis                                              Matrix  B6ttles -Preservativel /Type Bottles      Creek Lab Sarmple #
                                                  ....        ~~~~                                                                                              ",:
* ON&#xa2;-*
                                                                                                                                                          ...          la' x
                                                                                                              /72                          _____________.___
RELINQUISHED BY,                                                            DATE/TIME                    RECEIVED BY.
(Sign).:                                    (Print)                      (Organization)                        (Sign)                                (Print).                            (Organization)
                .~"*d&deg;/7"2
                                                                                                                                        .                                      Creek EnVironmental
                                                                                          *'~.~1K ~-<                                                                      .
[T.ihnrntnripo:mno
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise ML          141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 * (805) 545-9838 - FAX (805) 545-0107 Page 1i Trevor Rebel                                              Log Number:        09-C2485 Diablo Canyon Power Plant                                Order:            Q1008 P.O. Box 56                                              Project:          Storm Water Set        #2 Avila Beach, CA 93424                                    Received:          02/23/09 Printed:            03/17/09 REPORT OF ANALYTICAL RESULTS sampled
.Sampte Description                  Sampled By                        Date 61Time          Matrix BOAT-2008-2                          Trevor Rebel                      02/22/09@02:34            Aqueous Analyte                              Result        DLR        Dilution        Units            Method      Date    Date  Batch Factor                                    Analyzed Prepared 6137 Electrical Conductance                238              1              1        umhos/cm      SM 25103    02/23/09 6137 pH                                      8.4            0.1            1        pH units    SM 4500-H B    02/23/09 Total Suspended Solids                379              5              1        mg/L          SM 2540D    02/26/09          6262 Total Organic Carbon                    8.7            2              10        mg/L          SM 53103    03/16/09          6754 Iron                                  140              .0.1            5        mg/L          EPA 200.7    02/27/09 02/26/09 6268 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng.
PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
C A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C &deg; SAN LUIS OBISPO, CA 93401 # (805) 545-9838
* FAX (805) 545-0107 Page .9 Trevor Rebel                                              Log Number: 09-C2483 Diablo Canyon Power Plant                                Order:              Q1008 P.O. Box 56                                              Project:            Storm Water Set #2 Avila Beach, CA 93424                                    Received:          02/23/09 Printed:            03/17/09 REPORT OF ANALYTICAL RESULTS Sampled '
Sample Description                  Sampled By                        Date @ Time          Matrix 003-2008-2                          Trevor Rebel                      02/22/09@02:25            Aqueous Analyte                              Result          DLR        Dilution          Units            Method        Date          Date    Batch Factor                                      Analyzed      Prepared T - ---- ----------....      ......
Electrical Conductance                251                1              1        umhos/cm          2510B      02/23/09                  6137 pH                                      7.3              0.1            1        pH units    SM 4500-H B      02/23/09                  6137 Total Suspended Solids                40                5              1        mg/L          SMI 2540D      02/26/09                  6262 Total Organic Carbon                  14                0              5        mg/L          SM 5310B      03/04/09                  6353 Iron                                                    0.02            1        mg/L          EP'A 200.7    02/27/09      02/26/09    6268 1.5 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng
                                                  %-) PRINTED ON REC.YCLEDPAPER I.
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 * (805) 545-9838 e FAX (805) 545-0107 Page 12 Trevor Rebel                                                Log Number:        09-C2486 Diablo Canyon Power Plant                                  Order:              Q1008-P.O. Box 56                                                Project:          Storm Water Set #2 Avila Beach, CA 93424                                      Received:          02/23/09 Printed:            03/17/09 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                        Date @ Time          Matrix 004-2008-2                            Trevor Rebel                      02/22/09@04:35.            Aqueous Analyte                                Result          DLR        Dilution        Units            Method  Date      Date  Batch Factor                                  Analyzed  Prepared 02/23/ 09 Electrical Conductance                212                1              1        umhos/cm      SM 2510B                      6137 02/23/09 pH                                      7.5              0.1            1        pH units    SM 4500-H B                      6137 Total Suspended Solids                  24                5              1        mg/L          SM 2540D  02/26/09            6262 Total Organic Carbon                    3.8              0.2            1        mg/L        SM 5310B  03/16/09            6754 Iron                                    0.86            0.1            5        mg/L        EPA 200.7  02/27/09  02/26/09  6268 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng C.- PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
                                                                                                        -A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 13 Trevor Rebel                                                                                          Log Number:        09-C2487 Diablo Canyon Power Plant                                                                              Order:            Ql008 P.O. Box 56                                                                                            Project:          Storm Water Set #2 Avila Beach, CA 93424                                                                                Received:          02/23/09 Printed:            03/17/09 REPORT.OF ANALYTICAL RESULTS Sampled Sample Description                                                                      Sampled By                        Date @ Time          Matrix 005-2008-2                                                                              Trevor Rebel                      02/22/09@02:40            Aqueous AnaLyte                                                                                  Result        DLR        Dilution        Units          Method          Date            Date        Batch Factor                                      Analyzed        Prepared 02/23/09..                        6137-------
Electrical Conductance                                                                  332              1              1        umhos/cm    SM 2510B        02/23/09                          6137 pH                                                                                        7.3            0.1                      pH units                    02/23/09                          6137 1                    SM 4500-H B Total Suspended Solids                                                                    60              5              1        mg/L        SM 2540D        02/26/09                          6262 Total Organic Carbon                                                                      20              2              10        mg/L        SM- 5310B        03/17/09                          6755 Iron                                                                                      3.4            0.1            5        mg/L        EPA 200.7        02/27/09        02/26/09          6268 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng C"- PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise k141                          SUBURBAN ROAD, SUITE C 9 SAN LUIS OBISPO, CA 93401 * (805) 545-9838 e FAX (805) 545-0107
                                                                                                                                                                                                  . Page 4 Trevor Rebel                                                                                        Log Number:                    09-C2478 Diablo Canyon. Power Plant                                                                          Order:                        Q1008 P.O. Box 56                                                                                        Project:                      Storm Water Set #2 Avila.Beach, CA 93424                                                                              Received:                    02/23/09 Printed:                      03/17/09.
REPORT OF ANALYTICAL RESULTS Sampled Sample Description                                                  Sampled By                                        Date @ Time                          Matrix 006 Outlet-2008-2                                                    Trevor Rebel                                      02/22/09@02:48                                Aqueous Analyte                                                                Result                DLR              Dilution                  Units                        Method            .Date      Date  Batch Factor                                                                  Analyzed  Prepared Electrical Conductance                                                139                        1                      1              umhos/cm                SM 25108              02/23/09            6137 pH                                                                        8.2                    0.1                    1              pH units              SM 450.0-H B            02/23/09            6137 Total Suspended Solids                            .228                                            5                      1              mg/L                    SM 2540D              02/24/09            6198 Total Organic Carbon                                                    12                    10                      50              mg/L                    SM 5310B              02/26/09            6256 Iron                                                                      8.0                    0.1                    5              mg/L                    EPA 200.7              02/27/09  02/26/09  6268 DLR        Detection limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng C1 PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
                          .  .      ...            . A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 * (805) 545-9838 9 FAX (805) 545-0107 Page 3 Trevor Rebel                                                Log Number: 09-C2477 Diablo Canyon Power Plant                                    Order:            Q1008 P.O. Box 56                                                  Project:          Storm Water Set #2 Avila Beach, CA. 93424                                      Received:          02/23/09 Printed:          03/17/09 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                      Sampled By                      Date @ Time          Matrix 006 OutLet-2008-2                        Trevor Rebel                    02/22/09@02:48            Aqueous
                                                                      --- ----------  ==  ===
Ana tyte                                  Result        DLR        Dilution        Units            Method    Date      Date    Batch Factor                                Analyzed    Prepared
                                      ---------------.-.--------.--.---------.--.-------                      02/2---/09 EPA 200.8            02/27/09  6261 Chromium                                    0.010          0.002          2      mg/L.                    02/27/09 EPA 200.8            02/27/09  6261 Lead                                        0.022          0.001          1      mg/L                    02/27/09 EPA 200.8 03/05/09 Nickel                                      0.009          0.001          1        mg/L                                02/26/09  6388 DLR = Detection Limit for Reporting. Result.s of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng e) PRINTED ON RECYCLED PAPER
 
CCREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 1 Trevor Rebel                                              Log Number:        09-C2475 Diablo Canyon Power Plant                                Order:            Q1008 P.O. Box 56                                              Project:          Storm Water Set #2 Avila Beach, CA 93424                                      Received:          02/23/09 Printed:          03/17/09 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                        Date @ Time          Matrix
====== --------------      === === ==
006 Range-2008-2                      Trevor Rebel                      02/22/09@02:58            Aqueous Analyte                                Result        DLR        Dilution        Units            Method  Date        Date  Batch Factor                                  Analyzed    Prepared 02/23/09              6137 Electrical Conductance                  96              1              1        umhos/cm      SM 2510B 02/23/09              6137 pH                                      7.7            0.1            1        pH units    SM 4500-H B 02/24/09            6198 Total Suspended Solids                  25              5              1        mg/L          SM 2540D Total Organic Carbon                    10              1              5        mg/L          SM 5310B  02/26/09            6256 Iron.                                    0.82            0.1            5        mg/L          EPA 200.7 02/27/09    02/26/09 6268 DLR = Detection Limit for-Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng
                                                    %- PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
                            ..    .    .              -    A Minority-owned Business Enterprise w141          SUBURBAN ROAD, SUITE C
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 2 Trevor Rebel                                                Log Number: 09-C2476 Diablo Canyon Power Plant                                  Order:            Q1008 P.O. Box 56                                                Project:          Storm Water Set #2 Avila Beach, CA 93424                                      Received:          02/23/09 Printed:          03/17/09 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                        Date @ Time          Matrix 006 Range-2008-2                      Trevor Rebel                      02122/09@02:58            Aqueous Analyte                                Result          DLR        Dilution        Units            Method  Date      Date  Batch Factor                                  Analyzed  Prepbred Lead                                      0.11            0.001          1        mg/L          EPA 200.8 02/2"7/09 02/27/09  6261 DILR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
                                                                    ' CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng
                                                      ,j PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
C A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 * (805) 545-9838 - FAX (805) 545-0107 Page 8 Trevor Rebel                                              Log Number:        09-C2482 Diablo Canyon Power Plant                                Order;              Q1008 P.O. BOX 56                                              Project:            Storm Water Set #2 Avila Beach, CA 93424                                    Received:          02/23/09 Printed:            03/17/09 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                  Sampled By                        Date @ Time          Matrix 008-2008-2                          Trevor Rebel                      02/22/09@04:20            Aqueous
                                                                                                ========= ----------------------------
                                                                                                                                  ===
Analyte                              Result          DLR        Dilution        Units          Method    Date      Date    Batch Factor                                  Analyzed    Prepared 02/23/09 Electrical Conductance                317                1              1        umhos/cm    SM 2510B                          6137 1                                02/23/09 pH                                      7.0              0.1                      pH units  SM 4500-H B                        6137 1                                02/26/09 Total Suspended Solids                22                5                        mg/L          SM 2540D                          6262 1
Total Organic Carbon                    3.7              0.2                      mg/L          SM 5310B  03/16/09              6754 1
Iron                                    0.27            0.02                    mg/L          EPA 200.7  02/27/09    02/26/09  6268 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng,
                                                    .I PRINTED ON RECYCLED PAPER
* CREEK ENVIRONMENTAL LABORATORIES, INC.
LA          Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 - (805) 545-9838 e FAX (805) 545-0107 Page 14 Trevor Rebel                                                Log Number:        09-C2488 Diablo Canyon Power Plant                                  Order:            Q1008 P.O. Box 56                                                Project:          Storm Water Set #2 Avila Beach, CA 93424                                      Received:          02/23/09 Printed:          03/17/09 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                        Date @ Time          Matrix 009-2008-2                            Trevor RebeL                      02/22/09@03:28            Aqueous AnaLyte                                Result        DLR        Dilution        Units            Method  Date      Date  Batch Factor                                  Analyzed  Prepared 02/23/09 Electrical Conductance                  114                1              1        umhos/cm      SM 25108                      6137 02/23/09 pH                                        7.1            0.1            1        pH units    SM 4500-H B                      6137 02/26/09 Total Suspended Solids                  19              5              1        mg/L          SM 2540D                        6262 Total Organic Carbon                      5.6            2              10        mg/L          SM 53108  03/17/09            6755 Iron                                      0.73            0.1            5        mg/L          EPA 200.7  02/27/09  02/26/09 6268 DLR = Detection Limit for Reporting. Results of "Not Detected" are beLow DLR.
CREEK ENVIRONMENTAL LABORATORIES
* Lab Director, Michael Ng PRINTED ON RECYCLED PAPER
* CREEK ENVIRONMENTAL LABORATORIES, INC.
                        .      .    .        .  . A Minority-owned Business Enterprise A          141 SUBURBAN ROAD, SUITE C
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 7 Trevor Rebel                                              Log Number:        09-C2481 Diablo'Canyon Power Plant                                  Order:            Qi008 P.O. Box 56                                                Project:          Storm Water Set #2 Avila Beach, CA 93424                                      Received:          02/23/09 Printed:          03/17/09 REPORT OF ANALYTICAL              RESULTS Sampled Sample Descriptfon                  Sampled By                        Date @ Time          Matrix 011-2008-2                          Trevor Rebel                      02122/09@03:40            Aqueous
                                                                        -----------    = ===
Analyte                                Result        DLR        Dilution        Units            Method          Date      Date    Batch Factor                                        Analyzed    Prepared Electrical Conductance                110              1              1        umhos/cm      SM 25101        02/23/09              6137 pH                                      7.9            0.1            1        pH units    SM 4500-H B        02/23/09              6137 Total Suspended Solids                  61              5              1        mg/L          SM 2540D        02/26/09              6262 Total Organic Carbon                    5.6            1              5        mg/L          SM 5310B        03/04/09              6353 Iron                                    2.9            0.1            5        mg/L        EPA 200.7        02/27/09    02/26/09  6268 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Cs PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C
* SAN LUIS OBISPO, CA 93401 - (805) 545-9838 - FAX (805) 545-0107 Page 5 Trevor Rebel                                            Log Number:      09-C2479 Diablo Canyon Power Plant                                Order:            Q1008 P.O. Box 56                                              Project:          Storm Water Set #2 Avila Beach, CA 93424                                    Received:        02/23/09 Printed:          03/17/09 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                  Sampled By                      Date @ Time            Matrix 01.3-2008-2                          Trevor Rebel                    02/22/09@03:13              Aqueous AnaLyte                              Result        DLR        Dilution        Units            Method    Date      Date  Batch Factor                                  Analyzed    Prepared 02/23/-09 Electrical Conductance                232              1            1        umhos/cm      SM-2510B                        6137 02/23/09 pH                                      8.4            0.1          1        pH units    SM 4500-H B                        6137 02/24/09 Total Suspended Solids                351              5            1        mg/L          SM 2540D                        6198 Total Organic Carbon                  17              2            10        mg/L          SM 5310B  03/04/09              6353 Iron                                  14              0.1          5        mg/L          EPA 200.7  02/27/09    02/26/09  6268 DLR = Detection Limit for Reporting. Results of "Not Detected" are below bLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng
                                                  %* PRINTED ON RECYCLEDPAPER~
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
                                                    -      A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C - SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 6 Trevor Rebel                                                  Log Number:        09-C2480 Diablo Canyon Power Plant                                    Order:              Q1008 P.O. Box 56                                                    Project:          Storm Water Set #2
    .Avila Beach, CA 93424                                        Received:          02/23/09 Printed:            03/17/09 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                      Sampled By                        Date @ Time          Matrix 015-2008-2                              Trevor Rebel                      02/22/09@03:18            Aqueous AnaLyte                                  ResuLt          DLR        Dilution        Units            Method          Date      Date  Batch Factor                                        Analyzed    Prepared 02/23/09--            6137------
ELectri caLtConductance                  145                1              1        umhos/cm      SM 2510B        02/23/09              6137 pH                                          8.2                                        pH units    SM 4500-H 8        02/23/09              6137 0.1            1 Total Suspended Solids                    289                5              1        mg/L          SM 2540D        02/26/09              6262 Total Organic Carbon                      12                1              5        mg/L          SM.531OB        03/04/09              6353 Iron                                      12                0.1            5        mg/L          EPA 200.7        02/27/09    02/26/09  6268 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng C's PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 10 Trevor Rebel                                                                                    Log Number:          09-C2484 Diablo Canyon Power Plant                                                                      Order:                QI008 P.O. Box 56                                                                                    Project:            Storm Water Set #2 Avila Beach, CA 93424                                                                          Received:            02/23/09 Printed:            03/17/09 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                                              Sampled By                                            Date @Time          Matrix 023-2008-2                                                      Trevor Rebel                                          02/22/09@02:28          Aqueous Analyte                                                            Result            DLR                          Dilution      Units          Method          Date        Date    Batch Factor                                      Analyzed    Prepared
  ----------------------------------.......                --------            ----------.........................                                              02/23/09--            6137-------...
Electrical Conductance                                            434                    1                            1        umhos/cm    SM 2510B        02/23/09              6137 02/23/09              6137 pH                                                                  7.0                  0.1                          1        pH units    SM 4500-H B Total Suspended Solids                                            161                    5                            1        mg/L        SM 2540D        02/26/09              6262 Total Organic Carbon                                                35                    2                            10        mg/L        SM 53108        03/16/09              6754 Iron                                                                7.5                  0.1                          5        mg/L        EPA 200.7        02/27/09    02/26/09  6268 DIR - Dete                                  or--------
Repor .... -----
                                  -t-on -li-it---          ..Res...l-..                                                      .
are-be ow-D-..                              ----------.-.---------.-.-
DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER}}