05000318/LER-1982-025: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000318/LER-1982-025, Forwards LER 82-025/01T-0]]
| number = ML20054J174
| issue date = 06/16/1982
| title = LER 82-025/01T-0:on 820602,emergency Diesel Generators 21 & 12 Tripped on Loss of Field & Declared Inoperable. Caused by Voltage Drift.Emergency Diesel Generator Voltage Regulator Assembly Replaced
| author name = Pavis G, Rizzo P
| author affiliation = BALTIMORE GAS & ELECTRIC CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000318
| license number =
| contact person =
| document report number = LER-82-025-01T, LER-82-25-1T, NUDOCS 8206280244
| package number = ML20054J171
| document type = LICENSEE EVENT REPORT (SEE ALSO AO,RO), TEXT-SAFETY REPORT
| page count = 3
}}
{{LER
| Title = 
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000318
| LER year = 2082
| LER number = 25
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:NRC FORM 366                                                                                                                                  U S. NUCLE AR REhULATORY COMMISSION (1 til
* LICENSEE EVENT REPORT CONTROL HLOCO l t
l      l      l      l  l lh b
(PLE ASE PRINT OQ TYDE J LL REQUIRfD INFORMATfCN) o i        l Ml Dl Cl Cl Nl p@l 0 l 0l -l 0 l 0 ] 0 l 0 l 0 l - l 0 l 0 l@[4_! 1 l 1 l 1 l 1 l@lb i L Al I b8l@
f          H 9            LICENSE E CODE                14      IS                      LICENSE NUYUEH                        2 *>      76        LICENSE TYPE JO CONr o i                ((g"E l T.j@l 0l 5l 0l 0 l 0l 3l l l 8 @] 0 l 6 l 0 l 2 l 8 l 2 @l 76 014 ~61 1 l 6 l 8 l 2 l@
i          a                      60            til                DOCKE T NOV8ER                  06    69      EV ENT t> ATE                                RE PORT 0 ATE          15 0 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h gl                              At 0632, #21 Emergency Diesel Generator (EDG) trippec..o_n loss of field                                                                                                I g,g l                            af ter being started for an outage of a service transf ormer, and was declared                                                                                          j ing4j l                          inoperable (T.S. 3.8.1.1.b). #12 EDG was started and paralleled but trip-                                    _                                                    _J  _
n s l                      ped on loss of field at 0705 (T.S. 3.0.3) . EDG's #12 and 21 were return-                                                                                                !
o n l                      ed to operability at 0735 and 0800. #21 EDG again tripped on loss of                                                                                                j                ,-
gl                              field at 1445 and it was returned to service at 1515. One offsite power                                                                                              j
                    ;              source remained operable during the event. Similar erenF.s: none.                                                                                                    J80 DE                  CODE        SUBL E                      COYPONENT COGE                        SUSCbD'F        S      DE o 9                              I El E l @ [A_j h l X l h l G l E l N l E l R l A lh [X_j h [Z_l h                                                                                                            '
    ;          e                      9            lu            ti              12              IJ                                18            19              10                          3 SE QUE N TI AL                      OCCUHRENCE                HEPORT                  .      HEVISION
                                      ,_EVENTVEAH                                      H E POH T NO.                            CODE                      TYPE                          NC.
                    @ ;LiH hog;l 812 l L_ J t          JJ l-l JJ 101215l 24              e6 Ld 27 1 01 il 28 ,        29 LT_]
Ju l-1 31 LOJ J2 TA EN AC T O                  ON PL A T              M TH                      HOURS            SB IT                FO 1      8.      SUPPL 1                MAN JF ACT F4R lJJ X l@[Aj@                    LZ_j@                  [ Z_jh          l 0l 0l Ol 01              LI_]@                L.N_jh            l43 A Ih          l44 Cl 4I 7I Olh J4                    J's                    Jb              3/                    40    41                  42                                                        47 CAUSE DESCRIPTION AND CORRECTIVC ACTIONS h i o        l            EDG #21 tripped when voltage drifted while_operatins paralleled to off-                                                                                              ;l Ii lii i                      site power. Reactive load change caused a I,oss of Field / Reverse Power                                                                                                  j l i 1 :, ; l                  trip. A caution will be added to operating instructions. As a prevent-                                                                                                      l lil3l l                        ive measure, the EDG voltage regulator assembly will be replaced in an                                                                                                      I il tal8 9L_
7 attempt to improve nominal regulation.
80 I
SINT $              % POWE R                            oTHER STATUS                  O S OV H    ,
DlSCOVERY DESCHiPTION                        i                      e i 5        [E_jh l1l0l0l@l                                            NA                    I      WOL                        Operator Observation                                                  l ,/
A flVITY      CO TENT HELEASED OF RE LE ASE                            AVOUNT OF ACTIVITY                                                              LOCATION oF RELE Afd                        '
i c LZJ @ LZJ@l                                      Na                              I          I                        NA                                                                b 7        8 9                10            11                                                44            4'a                                                                                  :P9  '
s PEHSONNEL f *POSUHES NUYt1EH            TYPE            DESCH1PTION I i I 71          1 Ol 0l Ol@l Zl@l"                                                        NA                                                                                                          l PEHSONNEl'imu'JIES N U,.m ot SCn . TION @                                                                                                '
i 7
H N 9 I O! 010l@l12  11 NA
                                                                                                                                                                                                      . B0 l
L OSS OF OH D AVAGE TO F ACILITY TYPk      D E SC DIP T ION                                                                                          ,              ,
7 i 9 8 9 Q@l        to NA 80 l
2 o      tSSUdE t_        l      @ DESCRIPTION                      NA                                                                                    l      l l l l'l l l l l l l l l j
* a    a          -
                                                                                                                                        -                      6P ' 69                                  80 &
B206280244 820616                                                        .G.S. Pavis/P.G. Rizzo                                                pggy[301-269-4742/4786                                              g PDR ADOCK 05000318 B                                      (P{C]                                                                                                                                                                      .
 
i J                                                                                                                                              4 I
I 1
                /
LER No.                  82-25/IT DOCKET No.                50-318 LICENSE NO.              DPR-69 EVENT DATE                06-02-82 REPORT DATE 06-16-82                                                                                ,
    ,                                      ATTACHMENT T
EVENT DESCRIPTION AND PROBALBE CONSEOUENCES E                                          During normal operation at 0632, #21 Emergency Diesel Generator (EDG) tripped on loss t
                                          'of field fifty-five minutes af ter being started for an outage on service transformer
;                                          P-13000-2 and was declared inoperable (T.S. 3.8.1.1.b). #12 EDG was then started and
  <                                        p.aralleled with offsite power but it tripped on loss of field at 0705 due to fluctuations in        -
500 KV system line voltage (T.S. 3.0.3). #12 EDG and #21 EDG were successfully restarted and paralleled at 0735 and 0800 respectively. #21 EDG again tripped at 1445 i                                        on loss of field during load reduction after a successful one-hour surveillance test run. It
                  ,                        was started and declared operable at 1515. One offsite power source remained operable
                                        . during the event. There are no similar events.
CAUSE DESCRIPTION AND CORRECTIVE ACTIONS; EDG #21 tripped due to failure of operating personnel to detect voltage regulator drif t .
and adjust voltage prior to EDG trip upon protective relays sensing a reverse power
;                                          condition.
Contributing to the two trips on June 2,1982, is the condition of #21 voltage regulation
                        <.                which has normally exhibited greater tendency to drif t than has EDG #11 or #12 when
                          -               operating in parallel with a source supplied through the off-site distribution grid. When acting as the single supply to a vital bus, each EDG exhibits adequate regulating
  ;                    :                  capability.
                            $              Background i                          , 1.              EDG #21'has exhibited reactive load drif t for some time. Maintenance records
            / ;                                            document attempts to improve its regulation when in parallel operation since late Q;                                  .<                    in 1980. These include:
q                                r p                    '
: 1.        Governor replacement with an overhauled unit,
: 2.        Load regulator replacement,
: 3.        Voltage regulator replacement,
: 4.        Continuity and condition checks in control circuits, and                  ,
: 5.        On-site consultation with the vendor's technical representative.
None of these activities have disclosed a correctable cause of voltage regulator drift.
1 nd
: 2. Because the grid interconnection from the plant utili7.es automatic voltage adjusting taps, perturbations in grid voltage may requ re unit generator adjustments on a periodic basis. These sources of voltage change have serious effect on EDG reactive load when EDG's are paralleled to an off-site source.
: 3. It is noteworthy that following the events of June 2,1982, EDG #21 was successfully operated f or one hour while paralleled and loaded to 2500 KW on thirteen occasions during the succeeding nine days. These operations were periormed ior surveillance purposes.
Preventive Action As reported in LER 50-317/82-27/3L a caution label will be affixed to the Control Room Control Panel alerting operators to monitor EDG reactive load when adjusting system line voltage. This permanent label will also serve to remind operators of the necessity to monitor reactive load during EDG parallel operation.
The voltage regulator assembly for EDG #21 will be replaced as an attec,pt to improve regulation. Replacement will be accomplished when EDG #21 can be removed from service upon completion of maintenance which is currently being performed on other emergency power source equipment.
.
}}
 
{{LER-Nav}}

Latest revision as of 22:24, 18 March 2020