ML070380505: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/01/2006
| issue date = 05/01/2006
| title = May 1, 2006, Letter to Stephen D. Floyd, Nuclear Energy Institute from Jesse L. Funches Fy 2007 Performance Budget
| title = May 1, 2006, Letter to Stephen D. Floyd, Nuclear Energy Institute from Jesse L. Funches Fy 2007 Performance Budget
| author name = Funches J L
| author name = Funches J
| author affiliation = NRC/OCFO
| author affiliation = NRC/OCFO
| addressee name = Floyd S D
| addressee name = Floyd S
| addressee affiliation = Nuclear Energy Institute (NEI)
| addressee affiliation = Nuclear Energy Institute (NEI)
| docket =  
| docket =  
Line 18: Line 18:


==Dear Mr. Floyd:==
==Dear Mr. Floyd:==
I received your March 15, 2006, request for information on the U.S. Nuclear Regulatory Commission's FY 2007 Performance Budget. The level of detail that is publicly available on the budget has been provided to the Congress in NUREG-1 100, Volume 22, which is available on the NRC web site located at www.nrc.qov.
I received your March 15, 2006, request for information on the U.S. Nuclear Regulatory Commission's FY 2007 Performance Budget. The level of detail that is publicly available on the budget has been provided to the Congress in NUREG-1 100, Volume 22, which is available on the NRC web site located at www.nrc.qov.
Enclosed is a detailed breakout of the FY 2006 budget, which was released to the public as part of the FY 2006 proposed fee rule. That information reflects the appropriations decision made by Congress on the NRC's FY 2006 budget and is provided to demonstrate how the budget will be charged to licensees.
Enclosed is a detailed breakout of the FY 2006 budget, which was released to the public as part of the FY 2006 proposed fee rule. That information reflects the appropriations decision made by Congress on the NRC's FY 2006 budget and is provided to demonstrate how the budget will be charged to licensees.
After the Congress has made its appropriations decision on the NRC's FY 2007 budget, I will provide you a more detailed breakout of the budget as part of the FY 2007 proposed fee rule.Sincerely,/RA/Jesse L. Funches Chief Financial Officer  
After the Congress has made its appropriations decision on the NRC's FY 2007 budget, I will provide you a more detailed breakout of the budget as part of the FY 2007 proposed fee rule.
Sincerely,
                                            /RA/
Jesse L. Funches Chief Financial Officer


==Enclosure:==
==Enclosure:==


As stated AGENCY BUDGET FOR FY 2006 Enclosure 02/01/2006 FY2006 BUDGET$,K FTE PROGRAM: NUCLEA'R REATRtSAFr:TYXý
As stated
$guB-UPROGRANiýRACO.JLCENSI.GAK C __PLANNED ACCOMPLISHMENTS:
 
Nuclear Safety Professional Development Program 0.0 18.0 External Training 543.0 0.0 General Information Technology 4103.0 6.3 Aging of Reactor Systems and Components 10610.0 18.9 Evaluation and Resolution of Generic Safety Issues 2433.0 5.5 Safety of Digital Instrumentation and Control Systems 2605.0 4.8 Codes, Standards, and Regulatory Guidance 15.01 5.5 Civil/Structural Engineering and Earth Sciences 2230.0 4.7 Fire Safety 1095.0 4.2 Risk Informing the Regulatory Process 6079.0 22.8 Testing, Development and Validation of Systems Analysis Regulatory and Licensing Tool 10687.0 13.1 Radiation Protection 1625.0 6.6 Evaluation and Resolution of Operational Issues 4884.0 20.7 Regulatory Infrastructure and Improvements Initiatives 821.0 7.2 Project Management and Licensing Assistants 0.0 33.7 Licensing Actions 344.0 94.0 Other Licensing Tasks 200.0 24.4 Improved Standard Tech Spec Program Development 0.0 6.0 Regulatory Licensing Improvements 1095.0 40.5 Rulemaking 430.0 17.5 Event Evaluation and Generic Communications 60.0 20.9 Research and Test Reactor Licensing Activities 1550.0 14.9 Vendor-Owners Activities/Technical Issues Resolution 1560.0 35.8 Legal Advice and Representation 57.0 11.0 Adjudicatory Reviews 80.0 4.0 Emergency Preparedness Licensing 114.0 20.0 Total Direct Resources 53,220 461.0 IT Overhead 0 5.0 Supervisory/Non-Supervisory Overhead 0 166.0 Travel 2,960 0.0 Total Direct Resources 53,220 461.0 Total Overhead 0 171.0 Travel 2,960 0.0 PLANNED ACTIVITIES:
AGENCY BUDGET                                         Enclosure FOR FY 2006 02/01/2006       FY2006 BUDGET
International Nuclear Safety and Safeguards 218 19.0 Nuclear Safety Professional Development Program 5 1.0 International External Training 10 0.0 International AID Support 700 2.0 International General Information Technology 12 0.0 Total Direct Resources 945 22.0_ _ _ _ _ _ _ _ _ _ _ _ I I I I AGENCY BUDGET FOR FY 2006 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 10.0 Travel 483 0.0 Total Direct Resources 945 22.0 Total Overhead 0 !0.0 Travel 483 0.0]PRGAM.~iLA-M -PLANNED ACTIVITIES:
                                                                $,K       FTE PROGRAM: NUCLEA'R REATRtSAFr:TYXý
HLS Threat Assessment 60 6.6 HLS Regulatory Improvements 1,260 18.6 HLS Mitigating Strategy 3,415 33.0 HLS Safeguards Licensing 0 4.3 HLS Security Infrastructure Improvement 1,716 5.0 HLS Legal Advice and Representation 0 2.0 HLS General Information Technology 150 0.0 HLS Nuclear Safety Professional Development Program 0 2.0 HLS External Training 180 0.0 Total Direct Resources 6,781 71.5 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 15.0 Travel 1,695 0.0 Total Direct Resources 6,781 71.5 Total Overhead 0 15.0 Travel 1,695 0.0 PLANNED ACTIVITIES, Renewal Application Reviews 4,745 51.6 License Renewal Regulatory Framework 1,000 6.2 General Information Technology 0 0.2 Legal Advice and Representation 0 3.0 Total Direct Resources 5,745 61.0 IT Overhead 01 0.0 Supervisory/Non-Supervisory Overhead 0 16.01 Travel 607 0.0 Total Direct Resources 5,745 61.0.Total Overhead 0 1 16.0 Travel 6071 0.0 PLANNED ACTIVITIES:
$guB-UPROGRANiýRACO.JLCENSI.GAK           C                     __
REarly Site Permits R w755 5.3 Licese enewl RgulaoryFramwor 1,00 62 AGENCY BUDGET FOR FY 2006 Design Certification 1 3,450 27.11 Pre-Application Reviews 400 13.41 Regulatory Infrastructure 10,137 65.7 New Reactor Licensing Independent Advice 0 0.0 Legal Advice and Representation 0 7.0 Combined Licenses 01 2.0 General information Technology 200 0.5 New Reactor Infrastructure 0 0.0 Internal Training 0 0.0 Adjudicatory Reviews 44 2.0 Internal Training & Employee Development 150 2.0 Total Direct Resources 15,136 125.0 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 31.0 Travel 139 0.0 Total Direct Resources 15,136 125.0 Total Overhead 0 31.0 Travel 139 0.0 PLANNED ACTIVITIES:
PLANNED ACCOMPLISHMENTS:
HLS Force-on-Force Program 3,100 16.9 HLS Safeguards Inspection Program 100 31.4 HLS External Training 0 0.0 HLS Internal Training and Development 100 0.0 Total Direct Resources 3,300 48.3 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 10.0 Travel 0 0.0 Total Direct Resources 3,300 48.3 Total Overhead 0 10.0 Travel 0 0.0 PLANNED ACTIVITIES:
Nuclear Safety Professional Development Program                     0.0       18.0 External Training                                                 543.0       0.0 General Information Technology                                   4103.0         6.3 Aging of Reactor Systems and Components                         10610.0       18.9 Evaluation and Resolution of Generic Safety Issues               2433.0         5.5 Safety of Digital Instrumentation and Control Systems           2605.0         4.8 Codes, Standards, and Regulatory Guidance                           15.01       5.5 Civil/Structural Engineering and Earth Sciences                 2230.0         4.7 Fire Safety                                                     1095.0         4.2 Risk Informing the Regulatory Process                           6079.0       22.8 Testing, Development and Validation of Systems Analysis Regulatory and Licensing Tool                                   10687.0       13.1 Radiation Protection                                             1625.0         6.6 Evaluation and Resolution of Operational Issues                 4884.0       20.7 Regulatory Infrastructure and Improvements Initiatives             821.0         7.2 Project Management and Licensing Assistants                         0.0       33.7 Licensing Actions                                                 344.0       94.0 Other Licensing Tasks                                             200.0       24.4 Improved Standard Tech Spec Program Development                     0.0         6.0 Regulatory Licensing Improvements                                 1095.0       40.5 Rulemaking                                                         430.0       17.5 Event Evaluation and Generic Communications                         60.0       20.9 Research and Test Reactor Licensing Activities                   1550.0       14.9 Vendor-Owners Activities/Technical Issues Resolution             1560.0       35.8 Legal Advice and Representation                                     57.0       11.0 Adjudicatory Reviews                                               80.0         4.0 Emergency Preparedness Licensing                                   114.0       20.0 Total Direct Resources                                     53,220       461.0 IT Overhead                                                             0       5.0 Supervisory/Non-Supervisory Overhead                                   0     166.0 Travel                                                             2,960         0.0 Total Direct Resources                                           53,220     461.0 Total Overhead                                                         0     171.0 Travel                                                             2,960         0.0 PLANNED ACTIVITIES:
License Renewal Inspections 0 4.2 Emergency Preparedness Inspection Program 0 12.0 Intemal Training and Development 1,367 19.0 Baseline Inspections 0 266.9 Supplemental/Reactive Inspections 2,550 33.2 Generic Safety Issue Inspections 0 3.8 Reactor Inspection -allegation folow-up 0_ 26.9 OE agency programs 01 1.0 Reactor Performance assessment 445 22.8 Reactor Inspection
International Nuclear Safety and Safeguards                         218       19.0 Nuclear Safety Professional Development Program                         5         1.0 International External Training                                       10         0.0 International AID Support                                           700         2.0 International General Information Technology                         12         0.0 Total Direct Resources                                       945       22.0
& assessment Program Devp & oversight 1,110 29.8 Licensing
_ _ _ __ _ _   _ _     _   _     _       I           I           I I
& Examination of Power Reactor Operators 330 22.0 Operator Licensing Program & Training Oversight 0 11.9 Research & Test Reactor Inspection 80 3.5 TTC-Information Technology 695 3.0"TC-Rental of Space 832 0.0 TTC-Other Administrative Services 310 0.0 General information technology 191 0.0 Reactor inspection
 
-State, Federal, & Tribal liaison Activities 0 4.0 3 AGENCY BUDGET FOR FY 2006 Legal Advice & Representation 0 2.01 Allegation
AGENCY BUDGET FOR FY 2006 IT Overhead                                               0     0.0 Supervisory/Non-Supervisory Overhead                       0   10.0 Travel                                                 483     0.0 Total Direct Resources                                 945   22.0 Total Overhead                                             0   !0.0 Travel                                                 483     0.0]
& Enforcement Actions 74 13.0 Reactor Investigations 10 24.0 Nuclear Safety Professional Development Program 0 12.0 External Training 424 1.0 Reactor Event Response 33 10.8 Reactor Event Readiness 3,2721 17.3 Reactor Incident Response Coordiantion 0 3.9 Reactor Incident Investigation 0 0.0 Total Direct Resources 11,723 548.0 IT Overhead 0 24.0 Supervisory/Non-Supervisory Overhead 0 225.0 Travel 8,603 0.0 Total Direct Resources 11,723 548.0 Total Overhead 0 249.0 Travel 8,603 0.0 gct-------,---
PRGAM.~iLA-                   M   -
NUCLEAR REACTOR SAFETY STRATEGY TOTALS:.,1z Mal- iliR" 3 AGENCY BUDGET FOR FY 2006 PRGRAM;NCERITR4 N V~S ESATY____-
PLANNED ACTIVITIES:
PLANNED ACTIVITIES:
Fuel Facilities Licensing 450 17.0 Allegations/Enforcement 13 1.0 HLS Threat Assessments 0 0.4 HLS Mitigating Strategies 0 1.2 HLS Regulatory Improvements 100 3.7 HLS Safeguards Inspection Program 0 10.3 HLS Safeguards Licensing 1,700 6.4 Fuel Facilities Inspection 0 15.6 HLS External Training 50 0.0 HLS Force-on-Force Program 10 1.6 Mixed Oxide Fuel Fabrication Facility Licensing and Inspectio 300 13.1 Fuel Facilities Environmental Reviews 845 3.0 Uranium Recovery Licensing and Inspection 82 8.2 Enrichment Facilities, Licensing and Inspection 175 16.7 Advanced Fuel Cycle Support 0 1.0 Legal Advice and Representation 0 6.0 Fuel Facilities Adjudication 81 4.0 General Information Technology 50 0.0 Nuclear Safety Professional Development Program 0 4.0 External Training 141 0.0 Internal Training & Employee Development 35 0.0 Total Direct Resources 4,032 113.2 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 45.0 Travel 951 0.0 Total Direct Resources 4,032 113.2 Total Overhead 0 45.0 Travel 951 0.0... .......-1. ..........  
HLS   Threat Assessment                                  60    6.6 HLS   Regulatory Improvements                        1,260    18.6 HLS   Mitigating Strategy                            3,415    33.0 HLS   Safeguards Licensing                                0     4.3 HLS   Security Infrastructure Improvement            1,716      5.0 HLS  Legal Advice and Representation                      0    2.0 HLS   General Information Technology                    150      0.0 HLS   Nuclear Safety Professional Development Program     0    2.0 HLS  External Training                                180      0.0 Total Direct Resources                        6,781    71.5 IT Overhead                                                0    0.0 Supervisory/Non-Supervisory Overhead                      0  15.0 Travel                                                1,695      0.0 Total Direct Resources                                6,781    71.5 Total Overhead                                            0   15.0 Travel                                                1,695      0.0 PLANNED ACTIVITIES, Renewal Application Reviews                          4,745    51.6 License Renewal Regulatory Framework                  1,000      6.2 General Information Technology                              0     0.2 Legal Advice and Representation                            0     3.0 Total Direct Resources                         5,745    61.0 IT Overhead                                                 01    0.0 Supervisory/Non-Supervisory Overhead                       0   16.01 Travel                                                   607      0.0 Total Direct Resources                               5,745    61.0.
... .... .. ...PLANNED ACTIVITIES:
Total Overhead       Licese enewl RgulaoryFramwor    1,000 1  16.0 62 Travel                                                   6071    0.0 PLANNED ACTIVITIES:
International Import/Export Licensing Reviews 0 4.0 International HLS Licensing Support 0 2.0 HLS International Activities 0 4.9 HLS Safeguards Inspection
REarly Site Permits    R    w755                                5.3
& Oversight 69 1.5 Internal Training & Development 90B 3.0 Materials Event Evaluation and Incident Response 1,095 11.0 HLS Mitigating Strategies 0 2.4 International Legal Advice and Representation 0 1.0 Risk-Informed Regulatory Framework 200 1.0 Radiation Exposure Assessment Methods 600 3.0 HLS Regulatory Improvements 465 12.2 HLS Control of Sources and Registry 450 1.0 HLS Information Technology
 
-Control of Sources 3,316 5.9 Materials Licensing 50 30.2 HLS Safeguards Licensing 0 0.8 HLS Legal Advide and Representation 0 1.0 HLS Coordination with States 16 1.0 Materials Users Environmental Reviews 0 1.0 Materials Inspections 806 28.1 Materials Rulemaking 688 18.1 HLS Unallocated 4,498 0.0 Allegations/Enforcement 38 18.1 4 AGENCY BUDGET FOR FY 2006 Materials Agreement States 230 24.4 Materials State Federal, and Tribal Liason 35 2.0 Materials Investigations 0 8.0 Legal Advice and Representation 0 4.0 Materials Adjudication 20 2.0 Information Technology
AGENCY BUDGET FOR FY 2006 Design Certification                                          1  3,450    27.11 Pre-Application Reviews                                            400    13.41 Regulatory Infrastructure                                        10,137    65.7 New Reactor Licensing Independent Advice                              0      0.0 Legal Advice and Representation                                        0      7.0 Combined Licenses                                                      01    2.0 General information Technology                                      200      0.5 New Reactor Infrastructure                                            0      0.0 Internal Training                                                      0      0.0 Adjudicatory Reviews                                                  44      2.0 Internal Training &Employee Development                              150      2.0 Total Direct Resources                        15,136    125.0 IT Overhead                                                            0      0.0 Supervisory/Non-Supervisory Overhead                                    0    31.0 Travel                                                              139      0.0 Total Direct Resources                                            15,136    125.0 Total Overhead                                                          0    31.0 Travel                                                              139      0.0 PLANNED ACTIVITIES:
-Materials 2,700 0.5 General Information Technology 465 0.0 Nuclear Safety Professional Development Program 0 3.0 External Training 205 0.0 Total Direct Resources 16,854 195.1 IT Overhead 0 5.0 Supervisory/Non-Supervisory Overhead 0 69.5 Travel 1,665 0.0 Total Direct Resources 16,854 195.1 Total Overhead 0 74.5 Travel 1,665 0.0
HLS  Force-on-Force Program                                      3,100    16.9 HLS  Safeguards Inspection Program                                  100    31.4 HLS  External Training                                                0      0.0 HLS   Internal Training and Development                              100      0.0 Total Direct Resources                          3,300    48.3 IT Overhead                                                            0      0.0 Supervisory/Non-Supervisory Overhead                                    0    10.0 Travel                                                                  0      0.0 Total Direct Resources                                            3,300    48.3 Total Overhead                                                          0    10.0 Travel                                                                  0      0.0 PLANNED ACTIVITIES:
:-I otI -1, 19--&-- -S 1E AT-.!VEWASTE PLANNED ACTIVITIES:
License Renewal Inspections                                            0      4.2 Emergency Preparedness Inspection Program                              0     12.0 Intemal Training and Development                                  1,367      19.0 Baseline Inspections                                                    0  266.9 Supplemental/Reactive Inspections                                  2,550      33.2 Generic Safety Issue Inspections                                        0     3.8 Reactor Inspection -allegation folow-up                                  0_  26.9 OE agency programs                                                      01    1.0 Reactor Performance assessment                                        445    22.8 Reactor Inspection &assessment Program Devp &oversight              1,110    29.8 Licensing & Examination of Power Reactor Operators                    330    22.0 Operator Licensing Program &Training Oversight                          0   11.9 Research & Test Reactor Inspection                                    80      3.5 TTC-Information Technology                                            695      3.0 "TC-Rental of Space                                                  832      0.0 TTC-Other Administrative Services                                    310      0.0 General information technology                                        191      0.0 Reactor inspection - State, Federal, &Tribal liaison Activities          0      4.0 3
Low-Level Waste Regulation and Oversight 10 3.7 Reactor Decommissioning Rulemaking
 
& Regulatory Guidanc 0 0.01 Nuclear Safety Professional Development Program 0 1.0 Reactor Decommissioning Project Management, Licensing
AGENCY BUDGET FOR FY 2006 Legal Advice & Representation                                    0  2.01 Allegation & Enforcement Actions                              74  13.0 Reactor Investigations                                         10  24.0 Nuclear Safety Professional Development Program                  0  12.0 External Training                                            424    1.0 Reactor Event Response                                        33  10.8 Reactor Event Readiness                                    3,2721  17.3 Reactor Incident Response Coordiantion                          0   3.9 Reactor Incident Investigation                                  0   0.0 Total Direct Resources                   11,723  548.0 IT Overhead                                                     0 24.0 Supervisory/Non-Supervisory Overhead                           0 225.0 Travel                                                     8,603    0.0 Total Direct Resources                                     11,723  548.0 Total Overhead                                                 0 249.0 Travel                                                     8,603    0.0 gct-------,---
& 570 6.4 Reactor Decommissioning Inspection 0 3.9 Materials and Fuel Facility Decommissioning Licensing 1,320 30.6 Materials and Fuel Facility Decommissioning Inspection 0 2.6 Formerly Licensed Sites 0 0.0 Decommissioning and Low-Level Waste Environmental Revi( 690 3.6 Information Technology
NUCLEAR REACTOR SAFETY STRATEGY TOTALS:
-Support of Scientific Code Activities 0 0.0 General Information Technology 225 0.0 Legal Advice and Representation 0 5.0 External Training 128 0.0 Assessment of Doses from Environmental Contaminants 2,230 7.0 HLS Decommissioning and Low-Level Waste Activities 0 0.0 Internal Training & Employee Development 121 0.2 Total Direct Resources 5,294 64.0 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 28.0 Travel 650 0.0 Total Direct Resources 5,294 64.0 Total Overhead 0 28.0 Travel 650 0.0.SUBPIOG RAM.SPENT IFU EL 6ATA AD RTATION-~ ~ Ny___ SPORTA 10N PLANNED ACTIVITIES:
                                  .,1z            Mal-iliR" 3
Licensing and Certification 2,720 37.3 Inspection and Event Response 50 11.7 Spent Fuel Environmental Reviews 0 0.0 Adjudicatory Reviews 50 1.0 Legal Advice and Representation 0 2.0 General Information Technology 2231 0.0 Nuclear Safety Professional Development Program 0 0.0 5 AGENCY BUDGET FOR FY 2006 External Training 121 0.0 Spent Fuel Storage Systems Safety Assessment 1,510 3.0 HLS Threat Assessments 0 0.2 HLS Regulatory Improvements 50 3.9 HLS Mitigating Strategies 200 0.3 HLS Security inspection and Oversight A 1.7 HLS Safeguards Licensing 0 3.7 HLS Security Infrastructure Improvements 0 0.0 HLS Assess Dispersal from Spent Fuel 0 0.0 HLS External Training 0 0.0 Total Direct Resources 4,924 64.8 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 27.0 Travel 374 0.0 Total Direct Resources 4,924 64.8 Total Overhead 0 27.0 Travel 3741 0.01 NUCLEAR MATERIALS SAFETY STRATEGY TOTALS: HIGH-LEVEL WASTE FUND 24,844 108.0 WASTE INCIDENTAL TO REPROCESSING
 
-GENERAL FU 1,363 8.9 GRAND TOTAL 60,951 7291 6 AGENCY BUDGET FOR FY 2006 02/01/2006i FY2006 BUDGET.. ... ..............  
AGENCY BUDGET FOR FY 2006 PRGRAM;NCERITR4                      N V~S        ESATY____-
......... --.. ... ... ...... ... ..... ............. .. ..... ........... ...Sheet H: Management and Support ..........  
PLANNED ACTIVITIES:
.... .................................
Fuel Facilities Licensing                                      450  17.0 Allegations/Enforcement                                          13    1.0 HLS Threat Assessments                                            0  0.4 HLS Mitigating Strategies                                          0  1.2 HLS Regulatory Improvements                                    100    3.7 HLS Safeguards Inspection Program                                  0 10.3 HLS Safeguards Licensing                                      1,700    6.4 Fuel Facilities Inspection                                        0 15.6 HLS External Training                                            50    0.0 HLS Force-on-Force Program                                      10    1.6 Mixed Oxide Fuel Fabrication Facility Licensing and Inspectio  300  13.1 Fuel Facilities Environmental Reviews                          845    3.0 Uranium Recovery Licensing and Inspection                        82    8.2 Enrichment Facilities, Licensing and Inspection                175  16.7 Advanced Fuel Cycle Support                                        0  1.0 Legal Advice and Representation                                   0   6.0 Fuel Facilities Adjudication                                    81    4.0 General Information Technology                                  50    0.0 Nuclear Safety Professional Development Program                    0  4.0 External Training                                              141    0.0 Internal Training & Employee Development                         35    0.0 Total Direct Resources                   4,032  113.2 IT Overhead                                                       0   0.0 Supervisory/Non-Supervisory Overhead                               0 45.0 Travel                                                         951    0.0 Total Direct Resources                                       4,032  113.2 Total Overhead                                                     0 45.0 Travel                                                         951    0.0
..........
: 1.              . .........        ... .... .. ...
........ ....... ..................................  
PLANNED ACTIVITIES:
.. .........................
International Import/Export Licensing Reviews                      0  4.0 International HLS Licensing Support                                0   2.0 HLS International Activities                                      0   4.9 HLS Safeguards Inspection & Oversight                            69    1.5 Internal Training & Development                                 90B    3.0 Materials Event Evaluation and Incident Response              1,095  11.0 HLS Mitigating Strategies                                          0   2.4 International Legal Advice and Representation                      0   1.0 Risk-Informed Regulatory Framework                              200    1.0 Radiation Exposure Assessment Methods                          600    3.0 HLS Regulatory Improvements                                     465  12.2 HLS Control of Sources and Registry                            450    1.0 HLS Information Technology - Control of Sources              3,316    5.9 Materials Licensing                                               50  30.2 HLS Safeguards Licensing                                          0   0.8 HLS Legal Advide and Representation                                0   1.0 HLS Coordination with States                                      16  1.0 Materials Users Environmental Reviews                              0   1.0 Materials Inspections                                          806  28.1 Materials Rulemaking                                            688  18.1 HLS Unallocated                                              4,498    0.0 Allegations/Enforcement                                          38  18.1 4
..........  
 
..........  
AGENCY BUDGET FOR FY 2006 Materials Agreement States                                                230  24.4 Materials State Federal, and Tribal Liason                                35    2.0 Materials Investigations                                                    0    8.0 Legal Advice and Representation                                            0     4.0 Materials Adjudication                                                    20    2.0 Information Technology - Materials                                      2,700    0.5 General Information Technology                                            465    0.0 Nuclear Safety Professional Development Program                            0    3.0 External Training                                                        205    0.0 Total Direct Resources                            16,854  195.1 IT Overhead                                                                0    5.0 Supervisory/Non-Supervisory Overhead                                        0  69.5 Travel                                                                  1,665    0.0 Total Direct Resources                                                16,854  195.1 Total Overhead                                                              0  74.5 Travel                                                                  1,665    0.0 S
.... ........ t...... ..............
PLANNED ACTIVITIES:
I....-.... -... .....- .......-....-..  
a,,r.a.*;U.e,.
-. ..--.- ..-. --...- .... 1*... '.............
                                        -             :-I otI      1, 19--&--
::::::::::::::PLANNED ACTIVITIES
AT
__ __ '__:___::::::::::::
                                                              -.!VEWASTE 1E      -
General Accounting and Financial Reporting 1,121 -8 .0-i IT Federal Financial Systems 850!Cost Analysis I Ol 2a01 Accounts Receivable 91 4. 01 Ucense Fees as 10.01 Informaion Tecnology-Lcono Fee 1,495 2.1 T Information Systems 4 B7 1i.0 Information Technology/Payroll System 1,120) 1.01 Information Technology
Low-Level Waste Regulation and Oversight                                    10    3.7 Reactor Decommissioning Rulemaking &Regulatory Guidanc                      0    0.01 Nuclear Safety Professional Development Program                              0      1.0 Reactor Decommissioning Project Management, Licensing &                  570    6.4 Reactor Decommissioning Inspection                                          0    3.9 Materials and Fuel Facility Decommissioning Licensing                    1,320  30.6 Materials and Fuel Facility Decommissioning Inspection                      0    2.6 Formerly Licensed Sites                                                      0    0.0 Decommissioning and Low-Level Waste Environmental Revi(                  690    3.6 Information Technology - Support of Scientific Code Activities              0    0.0 General Information Technology                                            225    0.0 Legal Advice and Representation                                              0    5.0 External Training                                                          128    0.0 Assessment of Doses from Environmental Contaminants                      2,230    7.0 HLS Decommissioning and Low-Level Waste Activities                          0      0.0 Internal Training & Employee Development                                  121      0.2 Total Direct Resources                              5,294  64.0 IT Overhead                                                                  0    0.0 Supervisory/Non-Supervisory Overhead                                        0  28.0 Travel                                                                    650      0.0 Total Direct Resources                                                  5,294  64.0 Total Overhead                                                                0  28.0 Travel                                                                    650      0.0
-Cost Analysis j 5411 1.0 Payment Services 1451 8O.Payment Policy and Obligatton 865 8.01 Time Labor and Payroll 0_1 6.0 Central Allowance J 351 5.0 General__Information__Technology 561, 0.0 Internal Training & Development I I I Financial Systems 0 .0 External Training 1 134.Planning J 1151 4.01
.SUBPIOGRAM.SPENT IFU EL              6ATA        AD      S*O RTATION
--...... ...... -.-.-..- .-... .... ..... .Budget Operations "00____ 100o 5.0O Program Analysis 10.0 Funds Control 41 8.0 Total Direct Resources i" 7,1461 84.08 IT Overhead 2.Supervisory/Nin-Supervisory Overhead: Travel 47j 0.0[Total Direct Resources
                          -  ~    ~                              SPORTA 10N Ny___
.7.146 84.0 Total Overhead I 0i 21.0 Travel j 47 o0o..~~~....... :! :...- ; ..- ...:
PLANNED ACTIVITIES:
I--~~~ ~ ~~~ ...............
Licensing and Certification                                              2,720    37.3 Inspection and Event Response                                              50    11.7 Spent Fuel Environmental Reviews                                              0    0.0 Adjudicatory Reviews                                                        50      1.0 Legal Advice and Representation                                              0    2.0 General Information Technology                                            2231    0.0 Nuclear Safety Professional Development Program                              0    0.0 5
i.... -... -'-PLANNED ACTIVITiES T 1, 1.General Informat ion Technology 1,10821 1.01[7 AGENCY BUDGET FOR FY 2006 02101120061 1F(2006 I BUDGET Sheet H: Management and Support I ..............................  
 
.................................  
AGENCY BUDGET FOR FY 2006 External Training                                  121    0.0 Spent Fuel Storage Systems Safety Assessment    1,510    3.0 HLS Threat Assessments                              0    0.2 HLS Regulatory Improvements                        50    3.9 HLS Mitigating Strategies                          200    0.3 HLS Security inspection and Oversight                A    1.7 HLS Safeguards Licensing                            0    3.7 HLS Security Infrastructure Improvements            0    0.0 HLS Assess Dispersal from Spent Fuel                0    0.0 HLS External Training                                0    0.0 Total Direct Resources        4,924  64.8 IT Overhead                                          0    0.0 Supervisory/Non-Supervisory Overhead                0  27.0 Travel                                            374    0.0 Total Direct Resources                          4,924  64.8 Total Overhead                                      0  27.0 Travel                                            3741  0.01 NUCLEAR MATERIALS SAFETY STRATEGY TOTALS:
...............  
HIGH-LEVEL WASTE FUND                          24,844  108.0 WASTE INCIDENTAL TO REPROCESSING - GENERAL FU    1,363    8.9 GRAND TOTAL                                    60,951    7291 6
......................  
 
.. .............  
AGENCY BUDGET FOR FY 2006 02/01/2006i                  FY2006
.. ..........  
            ..............   . ........     .   .. .--.... ...... ...     . . ...     .. .   . .     ..     . . . . .. .. .           . . .. . . .BUDGET Sheet H: Management                              Support..................................
...... .............  
and.......                                                                                               .......... .... .......
...........  
t......
.- 7 i -V ......S............  
I...
.............
                                                              .......-....-..         -.       ..--.-          ..-.             - -        ...-.   .   ..       1*...
*". ...t .Congressional Afairs 241 6.01.Sec'_retariat 0_ IzL EDO and Operational Staff -30 17.01...........  
::::::::::::::PLANNED      ACTIVITIES                                              5.:*::***5:.*..:::**
..................
* y$*.;::*.:*>            I***...:B;5.;:*:*`*':5 General Accounting and Financial Reporting                                                                                                                  1,121    i      -8 .0-IT Federal Financial Systems                                                                                                                                  850!
... ...... ....... ..............  
Cost Analysis                                                                                                                                      I              Ol          2a01 Accounts Receivable                                                                                                                                              91          4.01 Ucense Fees                                                                                                                                                    as            10.01 Informaion Tecnology-Lcono Fee                                                                                                                              1,495              2.1T Information Tecnoology/Budge*Systems                                                                                                                          4B7        1i.0 Information Technology/Payroll System Information Technology - Cost Analysis 1,120)              1.01 j          5411              1.0 Payment Services                                                                                                                                              1451            8O.
...........  
Payment Policy and Obligatton                                                                                                                                865              8.01 Time Labor and Payroll                                                                                                                                            0_1          6.0 Central Allowance                                                                                                                                  J            351            5.0 General__Information__Technology                                                                                                                            561, 0.0 Internal Training & Development                                                                                                                    I                I              I Financial Systems                                                                                                                                                 0              .0 External Training Planning
........ ........ .... ......... ...... .... ... ... .................................  
                                      --.......         .*.*.i*.....-..-.-..
...............  
J 1   134.
.... .. ...Public Affairs 451 l.Commission Appellate Adjudication 5 -4 .0'Commission 1,0251 22-0 Policy and Direction Legal Advice i 3751 7.01 Management Support Services Legal Advice 10.01...-..:- --. .............  
1151             4.01 Budget Operations                                                                                                                "00____                          100o        5.0O Program Analysis                                                                                                                                                              10.0 Funds Control                                                                                                                                                    41          8.0 Total Direct Resources                                                                    i"      7,1461            84.08 IT Overhead Supervisory/Nin-Supervisory Overhead:                                                                                                                                        2.
.. -..---- .... .-... -.. -..... -...... I........
Travel                                                                                                                                                          47j          0.0[
-Reactor Saftey Independent Advice ____________.____
Total Direct Resources                                                                    .7.146                                                                              84.0 Total Overhead                                                                                                                                      I            0i          21.0 Travel                                                                                                                                              j          47            o0o.
3851 10 Materials and flon-HLW Waste Saetey Independent Advice 1001 5.01 External Training ig Totlt Direct Resources 3,81 117.011 IT Overhead___________________J Supervisory/Non-Supervisory Overhead:
[
J 65.01 Travel 945{ I Total Direct Resources
                    * .             *            *    ~~~.......         *            :! :...-;        '*** .         .*.-
-3,1801 117.0 Total Overhead 0j1o [ .0 Travel 1 g45[ 0.01........ .. .. .. ..... .. .. .. .. .... ....... ..-.:. .. .....: :::::::: , PLANNED ACTIVITIES:
I--~~~            ~...............
Employee Change of Station Benefits 11,610 1.01 Employee Relocation Services I 2 ,5 5 3 1 I Total Direct Resources 14,2631 i.o 1 IT Overhead Supervisory/llon-Supervisory Overhead: Travel I 1 Total Direct Resources 1114,263 1.0..... .... ........ ....-. ...-. 0. ......Total Overhead 0 0.0o Travel 01 0.01... .. .. .. .... .. ..........
                                            ~~~                                                                                                     i....             -...       -'-
.. -U # i ... .... ... ... .. ... .... ............. ......QA 4 .. ...................
PLANNED ACTIVITiES                  T                                                                                                                      1,              1.
8 AGENCY BUDGET FOR FY 2006 0210li'2006 1 FY200S BUDGET Sheet H: Management and Support .............
General Informat ion Technology                                                                                                                        1,10821                1.01 7
-------------
 
.... .......................
AGENCY BUDGET FOR FY 2006 02101120061                        1F(2006 I            BUDGET Sheet H: Management and Support                        ...............
..............
                                                                                                                                                  . . 7 ......
..... .. .............................................
I.........           i- V S.. . . . . . .............
.... .............................
                                                                                                                                                                      .   .     .t    *".       .
...........
Congressional Afairs                                                                                                                                                        241            6.01.
..........
Sec'_retariat                                                                                                                                                                  0_          IzL EDO and Operational Staff                                            - .................... . . ............. .... ... ... ................................................ 30. . ..
.... ... ...; ..............
........... . .................... ....... ....... ............. ...........                                                                                                              ..17.01.. *. .
I .............
Public Affairs                                                                                                                                                              451          l.
-.............
Commission Appellate Adjudication                                                                                                                                              5      -4      .0' 0
Safeguards and Security Implementation Physical Security..... ..... ..... ... .... ..-....- .-........
Commission                                                                                                                                                              1,0251            22-Policy and Direction Legal Advice                                                                                                                            i            3751              7.01 Management Support Services Legal Advice                                                                                                                                                  10.01 Reactor Saftey Independent Advice                                            ____________.____                                                                            3851              10 Materials and flon-HLW Waste Saetey Independent Advice                                                                                                                            I........5.01 -
....-..-..
1001 External Training                                                                                                                                                          ig Totlt Direct Resources                                                                                      3,81            117.011 IT Overhead___________________J Supervisory/Non-Supervisory Overhead:                                                                                                                      J                              65.01 Travel                                                                                                                                                                    945{                      I Total Direct Resources                                                                                                                                              -3,1801            117.0 Total Overhead                                                                                                                                                                [ 0j1o .           0 Travel                                                                                                                                                        1            g45[              0.01 PLANNED ACTIVITIES:
.. ...-. .Total Direct Resources 0 0.0!IT Overhead J SupervisorylNon-Suporwisory Overhead:
Employee Change of Station Benefits                                                                                                                                    11,610                  1.01 Employee Relocation Services                                                                                                                                  I        2 ,5 5 3 1                  I 1
i I____ ___'Total Direct Resources 0.-.-.--.-
Total Direct Resources                                                                                    14,2631                i.o IT Overhead Supervisory/llon-Supervisory Overhead:
fo[ ____Total Overhead 0 0.01 Travel j ! 0.01........w.NIM MMV; ...........
Travel                                                                                                                                                        I                                  1 Total Direct Resources                                                                                                                                        1114,263                        1.0
              . ..... .......         ....-.               ...-. ....       ......                                                                                             0.
Total Overhead                                                                                                                                                                  0            0.0o Travel                                                                                                                                                                          01            0.01
              ... ............. .........                             ..-U    #... i 4                                                                                                            .QA 8
 
AGENCY BUDGET FOR FY 2006 0210li'2006 1            FY200S BUDGET Sheet H: Management and Support..... .. .............................................                       ....
I-.............   .............
Safeguards and Security Implementation Physical Security 0            0.0!
Total Direct Resources ITOverhead SupervisorylNon-Suporwisory Overhead:
J                  i              I Total Direct Resources                                                                                                                            fo[0.-.-.--.-____
Total Overhead                                                                                                                                                  0           0.01 0
Travel                                                                                                                                           j               !               .01 w.NIM                     MMV; .......... .
PLANNED ACTIVITIES:.__
PLANNED ACTIVITIES:.__
Rental of Space 24,Z70_Facilities Management f 8"1'31 ,0!Total Direct Resources I 32.433 9.IT Overhead ___________________
Rental of Space                                                                                                                                         24,Z70_
___ ___F Supervisory/Non-Supervisory Overhead:
Facilities Management                                                                                                                             f       8"1'31
j 3.0'Travel _ _1__________________________
                                                                                                                                                              ,0!
I p Total Direct Resources
Total Direct Resources                                                                 I       32.433               9.
______1 32.4331 9.01 Total Overhead 1 3l.0o Travel f 0f.0......................
ITOverhead                              ___________________                                                                                         ___               ___F Supervisory/Non-Supervisory Overhead:                                                                                                           j                           3.0' Travel                                                                                                                                               _         _1
.,.........
__________________________                                                                                                  I               p Total Direct Resources                                                                                                         ______1                   32.4331             9.01 Total Overhead                                                                                                                                     1                           3l.0o Travel                                                                                                                                             f                           0f.0 ve,                                                                                                         /         ** .....:.O....
..................
                                                                                                                                                                  ==..................
*.... .. ..-ve, / * .... .:.O........ ..................  
                                                                                          . .X..:'..$`:::*::.*$ ::1...:$ :G * .':           :.
.. .......==....  
PLANNED ACTIVITIES.,
.;.,
Administrative Support Services                                                                                                                             -i7,916 26.o General Information Technology                                                                                                                     i       1,2081 IT Staff   . . . . . . . . . . . . . . . . ...... I.. . . ....   ..................
...:...-.. .,.......  
                                                                                                                                            . ... . ...* ; ......- a.0 1                          ;o....
.... ... ... .. ........ ... ..:. ...
Security                                                                                                                           __                   5,2,25             -20 Acquisition of Goods and Seritces                                                                                                                               601eo       28.41 External Training                                                                                                                                     =       100 Internal Training & Employee Development Total Direct Resources                                                                           14,509             68.01 9
::. ::1...:$ :G .': .'. ...:. ..X..... ..........
 
PLANNED ACTIVITIES., Administrative Support Services -i7,916 26.o General Information Technology i 1,2081 IT Staff 1 a.0........ .. ............  
AGENCY BUDGET FOR FY 2006 02101,'20061             FY2008
...................
...   . .     .     ........           ..............       . .............     ......   . . . .   . ....     . .. r-       .. BUDGET Sheet H: Management and Supportt
...... I...... .... ..................
                                                                                                                          .$,K             I FTE IT Overhead                                                                                                                               i Supervtsory/Non- Supervisory Overhead:                                                                                                               22.0 Travel         ......         ... ................................................
..............
1            31                  ,-..
...... ..... .........
Total Direct Resources                                                                                                           14,509
.... .................  
                                                                                                                                    ,O                 ,01.
.... ....; ......- ; o ....Security __ 5,2,25 -20 Acquisition of Goods and Seritces 601eo 28.41 External Training = 100 Internal Training & Employee Development Total Direct Resources 14,509 68.01....... ....... ............................
Total Overhead                                                                                                             1             01           22[0 Travel                                                                                                                                 35             0.0
.....- .............
        *"
... ..9 AGENCY BUDGET FOR FY 2006 02101,'20061 FY2008 BUDGET... ........... ..............  
* f.;.** ........                 ..........
..............  
:...{*.-...*:..k*::*-:.-::.>.,*.~....!
...... ......... ...r- .. ..........Sheet H: Management and Support t.$,K I FTE------------------.............-
-IT Overhead i Supervtsory/Non-Supervisory Overhead:
22.0 Travel 1 31 ,-..........
....... ...... ... .. ..............................................  
..... ..... ..............  
-.. .... .....-- ..Total Direct Resources 14,509 ,O ,01.Total Overhead 1 01 22[ 0 Travel 35 0. 0.. ... .... .. .*.* .................................  
.. ..........  
...... ................................" ........ ..........
PLANNED ACTIVITIES.
PLANNED ACTIVITIES.
General Inlormatlon Technology 1 1,298 5ý01 Grants to Universities 200 2.0o Recruitment and Slafting 695 21.0 PolFc Development and Strategic Worklorce Planning f 100 5.01 Performance Management 479 5.0i Affirmative Employment 53 1.51 Civil Rights 176 3.0!Minority Serving Institutions 60 8 01 1.2 i Managing Diversity I 1221 0.5 Small Business 1 1 1.3 Workltfe Services 1,980 3.0L IT Ov erh ea d Supervisory/Non-Supervisory Overhead: " 17.5i Travel f 4255 Total Direct Resources 9,360 M4.01 Total Overhead 0 17.S_5 Travel C)0.-*..iiiiiiiiiýii  
General Inlormatlon Technology                                                                                             1       1,298             5ý01 Grants to Universities                                                                                                                 200             2.0o Recruitment and Slafting                                                                                                               695           21.0 PolFc Development and Strategic Worklorce Planning                                                                         f           100             5.01 Performance Management                                                                                                                 479             5.0i Affirmative Employment                                                                                                                 53             1.51 Civil Rights                                                                                                                           176             3.0!
..........
Minority Serving Institutions                                                                                                         860 01           1. 2i Managing Diversity                                                                                                         I           1221           0.5 Small Business                                                                                                                           1             1.3 Workltfe Services                                                                                                                   1,980               3.0L IT Overhea d Supervisory/Non-Supervisory Overhead:                                                                                                         "     17.5i Travel                                                                                                                     f           4255 Total Direct Resources                                                                                                             9,360             M4.01 Total Overhead                                                                                                                           0           17.S_5 Travel C)0.
.........
                                  **!!* *                        * **                                  i~~ii;*-*..iiiiiiiiiýii
.....................
                                                        ~r A ~o             l D............
....~r o l A ~ D............
PLANNED ACTtVITIES.
PLANNED ACTtVITIES.
Planning and Oversight 1901 3.0: HLS Information Security 1,8gI 15T-10 AGENCY BUDGET FOR FY 2006 02/01/20061 FY2006w BUDGET Sheet H: Management and Support .............
Planning and Oversight                                                                                                                 1901             3.0:
..H .- .............
HLS Information Security                                                                                                       1,8gI                 15T-10
.... .........
...... .._ .... ....................................
I............................................
-------:::::::: ------::::: :-$,K II FTE Computer Security 445 .Ex,ternal Training and Development 110 InenlTraintng and Development 1 2501 ........ ..,.....-5 ., .! ,+ ., ... !. .p , I ...... ..... ... .. .-.... ....... ..... ..... .. ..... .. .. ............
.... .. ... ..... ......... ... ... .... .... ... .... .. .... .Io ........ ... .. o .: + ......Totat Direct Resources 2,893.1 18D
_______ _______I T IT Overhead 'Supervisory/Non-Supervisory Overhead:
0 6.0 Travel J 751... ... ...........
.. ....................................
__Totae Direct Resources 1 .89f 18.0 Total Overhead "0 6.0 Travel 75 0.0....... .........................
..... ..........
W ..-............
...... .......PLANNED ACTIVITIES.
Desktop Support & Infrastructure, Development
& Integration 13509[ 18.0 Production Operations 3,5231 3.0 Telecommunications Services and Support 7,429 5.0 Desklop Support and Network Services 651 Total Direct Resources i 25,112i 26.0 IT Overhead -l z Supervlsory;Non-Supervlsory Overhead:


===9.0 Travel===
AGENCY BUDGET FOR FY 2006 02/01/20061                          FY2006w BUDGET Sheet H: Management and Support                                                                                                                                              .............
_Total Direct Resources 1 25,112 26.0j Total Overhead T 0 9.0[-Travel 0 0.0J................  
        .H.- .............
.............  
                              ......  .              ._ .... ....................................      I............................................
................  
K II-------    FTE:::::
................
Computer Security                                                                                                                                                      445                  .
... .T. ...PLANNED ACTIVITIES I Application Support and Integrationi 2990 Business Area Applications I 1,460 9.Enterprise Services1,5  
Ex,ternal Training and Development                                                                                                                                      110
    ,.....-5
                .!,+
InenlTraintng      * .Development
                    .,and      I....
                                    .!..*..p, . .......... -....          .......
                                                                    'o~oo'+"*'=''-I
                                                                                                  ................                                      1
                                                                                                                                                                    .. 2501
                                                                                                                                                                              .Io    .....o. .:
                                                                                                                                                                                                +......
Totat Direct Resources                                                                                                2,893.1 18D I                  T IT Overhead                                                                                                                                                                    '
Supervisory/Non-Supervisory Overhead:                                                                                                                                      0              6.0 Travel            ...        ...........        ....        ....................................                                                        J 751                          __
Totae Direct Resources                                                                                                                                    1              .89f            18.0 Total Overhead                                                                                                                                                                "0          6.0 Travel                                                                                                                                                                    75              0.0
            ..... ..........                                                                W      ..-.
PLANNED      ACTIVITIES.
Desktop Support & Infrastructure, Development & Integration                                                                                                        13509[                18.0 Production Operations                                                                                                                                                3,5231                3.0 Telecommunications Services and Support                                                                                                                              7,429                  5.0 Desklop Support and Network Services                                                                                                                                    651 Total Direct Resources                                                                                      i      25,112i                26.0 IT Overhead                                                                                                                                          -      l        z Supervlsory;Non-Supervlsory Overhead:                                                                                                                                                        9.0 Travel                                                                                                                                                         _
Total Direct Resources                                                                                                                                     1       25,112                 26.0j Total Overhead                                                                                                                                             T                 0             9.0[-
Travel                                                                                                                                                                       0             0.0J
                          ................                                               .............                           .             ................ .............             ....T.
PLANNED ACTIVITIES                                                                                                                                           I Application Support and Integrationi                                                                                                                                   2990 Business Area Applications                                                                                                                                 I         1,460                 9.
Enterprise Services1,5                                                                                                                                                                     1.0 Total Direct Resources                                                                                      I          5,909j              33.01 IT Overhead 11


===1.0 Total===
AGENCY BUDGET FOR FY 2006 02/01/2006 t             FY2006 BUDGET Sheet H: Management and Support 1............
Direct Resources I 5,909j 33.01 IT Overhead 11 AGENCY BUDGET FOR FY 2006 02/01/2006 t FY2006 BUDGET....................
Sheet H: Management and Support 1............
i.............
i.............
..................................................
FTE Supervisory/Non-Supervisory Overhead:                                                                                                                   T                                     i Travel                                                                                                                                                                                             i T                                                             ....       ............................
....................................................
ve....................................................................                         ..................     .           ................
............................
Total Direct Resources                                                                                                                                             5,9091                 33a0 Total Overhead                                                                                                                                                           01               11.01 Travel0                                                                                                                                                                                       00 PLAVýNED ACTIVITIES-Information Services                                                                                                                                               1,7171                   21.0f Publishing Services                                                                                                                                               2,857!                   17.oi Document and Records Management                                                                                                                                   5,944                   30.0 Total Direct Resources                                                                             10,518                     68.01 IT Overhead                                                                                                                                                               1         _
.................
SupervIsory/Non-Supervisory Overhead                                                                                                                     j                                 21.0 Travel Total Direct Resources                                                                                                                                           10,518                   68801 Total Overhead                                                                                                                                                             01               21.01 Travel                                                                                                                                                                   o0        O         .0" MANAGEMENT AND SUPPORT STRATEGY TOTALS:
...... ...... ... ..........
G3RAND TOTAL. HIGH- LEVEL WASTFJGene*T Fund                                                                                                             "j       3,280                   24.0 G~RAND TOTAL WITHOUT HiGH-LEVEL WASTE AND GENERAL FUND (FEE BAS*                                                                                              123,570                       530t 12
FTE Supervisory/Non-Supervisory Overhead:
T i Travel i T ve....................................................................  
.... ............................  
..................
.................  
................
.......................  
......Total Direct Resources 5,9091 33a0 Total Overhead 01 11.01 Travel0 00 PLAVýNED ACTIVITIES-Information Services 1,7171 21.0f Publishing Services 2,857! 17.oi Document and Records Management 5,944 30.0 Total Direct Resources 10,518 68.01 IT Overhead 1 _SupervIsory/Non-Supervisory Overhead j 21.0 Travel Total Direct Resources 10,518 68801 Total Overhead 01 21.01 Travel 0 o O .0" MANAGEMENT AND SUPPORT STRATEGY TOTALS: G3RAND TOTAL. HIGH- LEVEL Fund "j 3,280 24.0 G~RAND TOTAL WITHOUT HiGH-LEVEL WASTE AND GENERAL FUND (FEE 123,570 530t 12 AGENCY BUDGET FOR FY 2006 02/01/2006 FY2006 BUDGET Sheet I: Inspector General --------{$,K ____......... .. ...PLANNED ACTIVITIES:
Investigations 63 16.0 Audits 995 21.0 External Training 123 General Information Technology 141 1.0 Operational Support 55 3.0.S&B Adjustment Total Direct Resources 1,377 41.0 IT Overhead Supervisory/Non-Supervisory Overhead:


===8.0 Travel===
AGENCY BUDGET FOR FY 2006 02/01/2006          FY2006 BUDGET Sheet I: Inspector General
310 Total Direct Resources 1,377 41.0 Total Overhead 0 8.0 Travel 310 0.0 iNSPECTOR GENERAL STRATEGY TOTALS: _"..-. .13}}
{$,K          --------
PLANNED ACTIVITIES:
Investigations                                            63        16.0 Audits                                                  995        21.0 External Training                                        123 General Information Technology                          141          1.0 Operational Support                                      55          3.0.
S&B Adjustment Total Direct Resources                  1,377        41.0 IT Overhead Supervisory/Non-Supervisory Overhead:                                  8.0 Travel                                                   310 Total Direct Resources                                 1,377         41.0 Total Overhead                                             0           8.0 Travel                                                   310           0.0 iNSPECTOR GENERAL STRATEGY TOTALS:               .
13}}

Latest revision as of 20:24, 13 March 2020

May 1, 2006, Letter to Stephen D. Floyd, Nuclear Energy Institute from Jesse L. Funches Fy 2007 Performance Budget
ML070380505
Person / Time
Issue date: 05/01/2006
From: Funches J
NRC/OCFO
To: Floyd S
Nuclear Energy Institute
References
Download: ML070380505 (15)


Text

May 1,2006 Mr. Stephen D. Floyd, Vice President Regulatory Affairs Nuclear Generation Division Nuclear Energy Institute 1776 I Street NW, Suite 400 Washington, D.C. 20006-3708

Dear Mr. Floyd:

I received your March 15, 2006, request for information on the U.S. Nuclear Regulatory Commission's FY 2007 Performance Budget. The level of detail that is publicly available on the budget has been provided to the Congress in NUREG-1 100, Volume 22, which is available on the NRC web site located at www.nrc.qov.

Enclosed is a detailed breakout of the FY 2006 budget, which was released to the public as part of the FY 2006 proposed fee rule. That information reflects the appropriations decision made by Congress on the NRC's FY 2006 budget and is provided to demonstrate how the budget will be charged to licensees.

After the Congress has made its appropriations decision on the NRC's FY 2007 budget, I will provide you a more detailed breakout of the budget as part of the FY 2007 proposed fee rule.

Sincerely,

/RA/

Jesse L. Funches Chief Financial Officer

Enclosure:

As stated

AGENCY BUDGET Enclosure FOR FY 2006 02/01/2006 FY2006 BUDGET

$,K FTE PROGRAM: NUCLEA'R REATRtSAFr:TYXý

$guB-UPROGRANiýRACO.JLCENSI.GAK C __

PLANNED ACCOMPLISHMENTS:

Nuclear Safety Professional Development Program 0.0 18.0 External Training 543.0 0.0 General Information Technology 4103.0 6.3 Aging of Reactor Systems and Components 10610.0 18.9 Evaluation and Resolution of Generic Safety Issues 2433.0 5.5 Safety of Digital Instrumentation and Control Systems 2605.0 4.8 Codes, Standards, and Regulatory Guidance 15.01 5.5 Civil/Structural Engineering and Earth Sciences 2230.0 4.7 Fire Safety 1095.0 4.2 Risk Informing the Regulatory Process 6079.0 22.8 Testing, Development and Validation of Systems Analysis Regulatory and Licensing Tool 10687.0 13.1 Radiation Protection 1625.0 6.6 Evaluation and Resolution of Operational Issues 4884.0 20.7 Regulatory Infrastructure and Improvements Initiatives 821.0 7.2 Project Management and Licensing Assistants 0.0 33.7 Licensing Actions 344.0 94.0 Other Licensing Tasks 200.0 24.4 Improved Standard Tech Spec Program Development 0.0 6.0 Regulatory Licensing Improvements 1095.0 40.5 Rulemaking 430.0 17.5 Event Evaluation and Generic Communications 60.0 20.9 Research and Test Reactor Licensing Activities 1550.0 14.9 Vendor-Owners Activities/Technical Issues Resolution 1560.0 35.8 Legal Advice and Representation 57.0 11.0 Adjudicatory Reviews 80.0 4.0 Emergency Preparedness Licensing 114.0 20.0 Total Direct Resources 53,220 461.0 IT Overhead 0 5.0 Supervisory/Non-Supervisory Overhead 0 166.0 Travel 2,960 0.0 Total Direct Resources 53,220 461.0 Total Overhead 0 171.0 Travel 2,960 0.0 PLANNED ACTIVITIES:

International Nuclear Safety and Safeguards 218 19.0 Nuclear Safety Professional Development Program 5 1.0 International External Training 10 0.0 International AID Support 700 2.0 International General Information Technology 12 0.0 Total Direct Resources 945 22.0

_ _ _ __ _ _ _ _ _ _ _ I I I I

AGENCY BUDGET FOR FY 2006 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 10.0 Travel 483 0.0 Total Direct Resources 945 22.0 Total Overhead 0 !0.0 Travel 483 0.0]

PRGAM.~iLA- M -

PLANNED ACTIVITIES:

HLS Threat Assessment 60 6.6 HLS Regulatory Improvements 1,260 18.6 HLS Mitigating Strategy 3,415 33.0 HLS Safeguards Licensing 0 4.3 HLS Security Infrastructure Improvement 1,716 5.0 HLS Legal Advice and Representation 0 2.0 HLS General Information Technology 150 0.0 HLS Nuclear Safety Professional Development Program 0 2.0 HLS External Training 180 0.0 Total Direct Resources 6,781 71.5 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 15.0 Travel 1,695 0.0 Total Direct Resources 6,781 71.5 Total Overhead 0 15.0 Travel 1,695 0.0 PLANNED ACTIVITIES, Renewal Application Reviews 4,745 51.6 License Renewal Regulatory Framework 1,000 6.2 General Information Technology 0 0.2 Legal Advice and Representation 0 3.0 Total Direct Resources 5,745 61.0 IT Overhead 01 0.0 Supervisory/Non-Supervisory Overhead 0 16.01 Travel 607 0.0 Total Direct Resources 5,745 61.0.

Total Overhead Licese enewl RgulaoryFramwor 1,000 1 16.0 62 Travel 6071 0.0 PLANNED ACTIVITIES:

REarly Site Permits R w755 5.3

AGENCY BUDGET FOR FY 2006 Design Certification 1 3,450 27.11 Pre-Application Reviews 400 13.41 Regulatory Infrastructure 10,137 65.7 New Reactor Licensing Independent Advice 0 0.0 Legal Advice and Representation 0 7.0 Combined Licenses 01 2.0 General information Technology 200 0.5 New Reactor Infrastructure 0 0.0 Internal Training 0 0.0 Adjudicatory Reviews 44 2.0 Internal Training &Employee Development 150 2.0 Total Direct Resources 15,136 125.0 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 31.0 Travel 139 0.0 Total Direct Resources 15,136 125.0 Total Overhead 0 31.0 Travel 139 0.0 PLANNED ACTIVITIES:

HLS Force-on-Force Program 3,100 16.9 HLS Safeguards Inspection Program 100 31.4 HLS External Training 0 0.0 HLS Internal Training and Development 100 0.0 Total Direct Resources 3,300 48.3 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 10.0 Travel 0 0.0 Total Direct Resources 3,300 48.3 Total Overhead 0 10.0 Travel 0 0.0 PLANNED ACTIVITIES:

License Renewal Inspections 0 4.2 Emergency Preparedness Inspection Program 0 12.0 Intemal Training and Development 1,367 19.0 Baseline Inspections 0 266.9 Supplemental/Reactive Inspections 2,550 33.2 Generic Safety Issue Inspections 0 3.8 Reactor Inspection -allegation folow-up 0_ 26.9 OE agency programs 01 1.0 Reactor Performance assessment 445 22.8 Reactor Inspection &assessment Program Devp &oversight 1,110 29.8 Licensing & Examination of Power Reactor Operators 330 22.0 Operator Licensing Program &Training Oversight 0 11.9 Research & Test Reactor Inspection 80 3.5 TTC-Information Technology 695 3.0 "TC-Rental of Space 832 0.0 TTC-Other Administrative Services 310 0.0 General information technology 191 0.0 Reactor inspection - State, Federal, &Tribal liaison Activities 0 4.0 3

AGENCY BUDGET FOR FY 2006 Legal Advice & Representation 0 2.01 Allegation & Enforcement Actions 74 13.0 Reactor Investigations 10 24.0 Nuclear Safety Professional Development Program 0 12.0 External Training 424 1.0 Reactor Event Response 33 10.8 Reactor Event Readiness 3,2721 17.3 Reactor Incident Response Coordiantion 0 3.9 Reactor Incident Investigation 0 0.0 Total Direct Resources 11,723 548.0 IT Overhead 0 24.0 Supervisory/Non-Supervisory Overhead 0 225.0 Travel 8,603 0.0 Total Direct Resources 11,723 548.0 Total Overhead 0 249.0 Travel 8,603 0.0 gct-------,---

NUCLEAR REACTOR SAFETY STRATEGY TOTALS:

.,1z Mal-iliR" 3

AGENCY BUDGET FOR FY 2006 PRGRAM;NCERITR4 N V~S ESATY____-

PLANNED ACTIVITIES:

Fuel Facilities Licensing 450 17.0 Allegations/Enforcement 13 1.0 HLS Threat Assessments 0 0.4 HLS Mitigating Strategies 0 1.2 HLS Regulatory Improvements 100 3.7 HLS Safeguards Inspection Program 0 10.3 HLS Safeguards Licensing 1,700 6.4 Fuel Facilities Inspection 0 15.6 HLS External Training 50 0.0 HLS Force-on-Force Program 10 1.6 Mixed Oxide Fuel Fabrication Facility Licensing and Inspectio 300 13.1 Fuel Facilities Environmental Reviews 845 3.0 Uranium Recovery Licensing and Inspection 82 8.2 Enrichment Facilities, Licensing and Inspection 175 16.7 Advanced Fuel Cycle Support 0 1.0 Legal Advice and Representation 0 6.0 Fuel Facilities Adjudication 81 4.0 General Information Technology 50 0.0 Nuclear Safety Professional Development Program 0 4.0 External Training 141 0.0 Internal Training & Employee Development 35 0.0 Total Direct Resources 4,032 113.2 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 45.0 Travel 951 0.0 Total Direct Resources 4,032 113.2 Total Overhead 0 45.0 Travel 951 0.0

1. . ......... ... .... .. ...

PLANNED ACTIVITIES:

International Import/Export Licensing Reviews 0 4.0 International HLS Licensing Support 0 2.0 HLS International Activities 0 4.9 HLS Safeguards Inspection & Oversight 69 1.5 Internal Training & Development 90B 3.0 Materials Event Evaluation and Incident Response 1,095 11.0 HLS Mitigating Strategies 0 2.4 International Legal Advice and Representation 0 1.0 Risk-Informed Regulatory Framework 200 1.0 Radiation Exposure Assessment Methods 600 3.0 HLS Regulatory Improvements 465 12.2 HLS Control of Sources and Registry 450 1.0 HLS Information Technology - Control of Sources 3,316 5.9 Materials Licensing 50 30.2 HLS Safeguards Licensing 0 0.8 HLS Legal Advide and Representation 0 1.0 HLS Coordination with States 16 1.0 Materials Users Environmental Reviews 0 1.0 Materials Inspections 806 28.1 Materials Rulemaking 688 18.1 HLS Unallocated 4,498 0.0 Allegations/Enforcement 38 18.1 4

AGENCY BUDGET FOR FY 2006 Materials Agreement States 230 24.4 Materials State Federal, and Tribal Liason 35 2.0 Materials Investigations 0 8.0 Legal Advice and Representation 0 4.0 Materials Adjudication 20 2.0 Information Technology - Materials 2,700 0.5 General Information Technology 465 0.0 Nuclear Safety Professional Development Program 0 3.0 External Training 205 0.0 Total Direct Resources 16,854 195.1 IT Overhead 0 5.0 Supervisory/Non-Supervisory Overhead 0 69.5 Travel 1,665 0.0 Total Direct Resources 16,854 195.1 Total Overhead 0 74.5 Travel 1,665 0.0 S

PLANNED ACTIVITIES:

a,,r.a.*;U.e,.

-  :-I otI 1, 19--&--

AT

-.!VEWASTE 1E -

Low-Level Waste Regulation and Oversight 10 3.7 Reactor Decommissioning Rulemaking &Regulatory Guidanc 0 0.01 Nuclear Safety Professional Development Program 0 1.0 Reactor Decommissioning Project Management, Licensing & 570 6.4 Reactor Decommissioning Inspection 0 3.9 Materials and Fuel Facility Decommissioning Licensing 1,320 30.6 Materials and Fuel Facility Decommissioning Inspection 0 2.6 Formerly Licensed Sites 0 0.0 Decommissioning and Low-Level Waste Environmental Revi( 690 3.6 Information Technology - Support of Scientific Code Activities 0 0.0 General Information Technology 225 0.0 Legal Advice and Representation 0 5.0 External Training 128 0.0 Assessment of Doses from Environmental Contaminants 2,230 7.0 HLS Decommissioning and Low-Level Waste Activities 0 0.0 Internal Training & Employee Development 121 0.2 Total Direct Resources 5,294 64.0 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 28.0 Travel 650 0.0 Total Direct Resources 5,294 64.0 Total Overhead 0 28.0 Travel 650 0.0

.SUBPIOGRAM.SPENT IFU EL 6ATA AD S*O RTATION

- ~ ~ SPORTA 10N Ny___

PLANNED ACTIVITIES:

Licensing and Certification 2,720 37.3 Inspection and Event Response 50 11.7 Spent Fuel Environmental Reviews 0 0.0 Adjudicatory Reviews 50 1.0 Legal Advice and Representation 0 2.0 General Information Technology 2231 0.0 Nuclear Safety Professional Development Program 0 0.0 5

AGENCY BUDGET FOR FY 2006 External Training 121 0.0 Spent Fuel Storage Systems Safety Assessment 1,510 3.0 HLS Threat Assessments 0 0.2 HLS Regulatory Improvements 50 3.9 HLS Mitigating Strategies 200 0.3 HLS Security inspection and Oversight A 1.7 HLS Safeguards Licensing 0 3.7 HLS Security Infrastructure Improvements 0 0.0 HLS Assess Dispersal from Spent Fuel 0 0.0 HLS External Training 0 0.0 Total Direct Resources 4,924 64.8 IT Overhead 0 0.0 Supervisory/Non-Supervisory Overhead 0 27.0 Travel 374 0.0 Total Direct Resources 4,924 64.8 Total Overhead 0 27.0 Travel 3741 0.01 NUCLEAR MATERIALS SAFETY STRATEGY TOTALS:

HIGH-LEVEL WASTE FUND 24,844 108.0 WASTE INCIDENTAL TO REPROCESSING - GENERAL FU 1,363 8.9 GRAND TOTAL 60,951 7291 6

AGENCY BUDGET FOR FY 2006 02/01/2006i FY2006

.............. . ........ . .. .--.... ...... ... . . ... .. . . . .. . . . . .. .. . . . .. . . .BUDGET Sheet H: Management Support..................................

and....... .......... .... .......

t......

I...

.......-....-.. -. ..--.- ..-. - - ...-. . .. 1*...

PLANNED ACTIVITIES 5.:*::***5:.*..:::**
  • y$*.;::*.:*> I***...:B;5.;:*:*`*':5 General Accounting and Financial Reporting 1,121 i -8 .0-IT Federal Financial Systems 850!

Cost Analysis I Ol 2a01 Accounts Receivable 91 4.01 Ucense Fees as 10.01 Informaion Tecnology-Lcono Fee 1,495 2.1T Information Tecnoology/Budge*Systems 4B7 1i.0 Information Technology/Payroll System Information Technology - Cost Analysis 1,120) 1.01 j 5411 1.0 Payment Services 1451 8O.

Payment Policy and Obligatton 865 8.01 Time Labor and Payroll 0_1 6.0 Central Allowance J 351 5.0 General__Information__Technology 561, 0.0 Internal Training & Development I I I Financial Systems 0 .0 External Training Planning

--....... .*.*.i*.....-..-.-..

J 1 134.

1151 4.01 Budget Operations "00____ 100o 5.0O Program Analysis 10.0 Funds Control 41 8.0 Total Direct Resources i" 7,1461 84.08 IT Overhead Supervisory/Nin-Supervisory Overhead: 2.

Travel 47j 0.0[

Total Direct Resources .7.146 84.0 Total Overhead I 0i 21.0 Travel j 47 o0o.

[

  • . * * ~~~....... *  :! :...-; '*** . .*.-

I--~~~ ~...............

~~~ i.... -... -'-

PLANNED ACTIVITiES T 1, 1.

General Informat ion Technology 1,10821 1.01 7

AGENCY BUDGET FOR FY 2006 02101120061 1F(2006 I BUDGET Sheet H: Management and Support ...............

. . 7 ......

I......... i- V S.. . . . . . .............

. . .t *". .

Congressional Afairs 241 6.01.

Sec'_retariat 0_ IzL EDO and Operational Staff - .................... . . ............. .... ... ... ................................................ 30. . ..

........... . .................... ....... ....... ............. ........... ..17.01.. *. .

Public Affairs 451 l.

Commission Appellate Adjudication 5 -4 .0' 0

Commission 1,0251 22-Policy and Direction Legal Advice i 3751 7.01 Management Support Services Legal Advice 10.01 Reactor Saftey Independent Advice ____________.____ 3851 10 Materials and flon-HLW Waste Saetey Independent Advice I........5.01 -

1001 External Training ig Totlt Direct Resources 3,81 117.011 IT Overhead___________________J Supervisory/Non-Supervisory Overhead: J 65.01 Travel 945{ I Total Direct Resources -3,1801 117.0 Total Overhead [ 0j1o . 0 Travel 1 g45[ 0.01 PLANNED ACTIVITIES:

Employee Change of Station Benefits 11,610 1.01 Employee Relocation Services I 2 ,5 5 3 1 I 1

Total Direct Resources 14,2631 i.o IT Overhead Supervisory/llon-Supervisory Overhead:

Travel I 1 Total Direct Resources 1114,263 1.0

. ..... ....... ....-. ...-. .... ...... 0.

Total Overhead 0 0.0o Travel 01 0.01

... ............. ......... ..-U #... i 4 .QA 8

AGENCY BUDGET FOR FY 2006 0210li'2006 1 FY200S BUDGET Sheet H: Management and Support..... .. ............................................. ....

I-............. .............

Safeguards and Security Implementation Physical Security 0 0.0!

Total Direct Resources ITOverhead SupervisorylNon-Suporwisory Overhead:

J i I Total Direct Resources fo[0.-.-.--.-____

Total Overhead 0 0.01 0

Travel j  ! .01 w.NIM MMV; .......... .

PLANNED ACTIVITIES:.__

Rental of Space 24,Z70_

Facilities Management f 8"1'31

,0!

Total Direct Resources I 32.433 9.

ITOverhead ___________________ ___ ___F Supervisory/Non-Supervisory Overhead: j 3.0' Travel _ _1

__________________________ I p Total Direct Resources ______1 32.4331 9.01 Total Overhead 1 3l.0o Travel f 0f.0 ve, / ** .....:.O....

==..................

. .X..:'..$`:::*::.*$ ::1...:$ :G * .':  :.

PLANNED ACTIVITIES.,

Administrative Support Services -i7,916 26.o General Information Technology i 1,2081 IT Staff . . . . . . . . . . . . . . . . ...... I.. . . .... ..................

. ... . ...* ; ......- a.0 1 ;o....

Security __ 5,2,25 -20 Acquisition of Goods and Seritces 601eo 28.41 External Training = 100 Internal Training & Employee Development Total Direct Resources 14,509 68.01 9

AGENCY BUDGET FOR FY 2006 02101,'20061 FY2008

... . . . ........ .............. . ............. ...... . . . . . .... . .. r- .. BUDGET Sheet H: Management and Supportt

.$,K I FTE IT Overhead i Supervtsory/Non- Supervisory Overhead: 22.0 Travel ...... ... ................................................

1 31 ,-..

Total Direct Resources 14,509

,O ,01.

Total Overhead 1 01 22[0 Travel 35 0.0

  • "
  • f.;.** ........ ..........
...{*.-...*:..k*::*-:.-::.>.,*.~....!

PLANNED ACTIVITIES.

General Inlormatlon Technology 1 1,298 5ý01 Grants to Universities 200 2.0o Recruitment and Slafting 695 21.0 PolFc Development and Strategic Worklorce Planning f 100 5.01 Performance Management 479 5.0i Affirmative Employment 53 1.51 Civil Rights 176 3.0!

Minority Serving Institutions 860 01 1. 2i Managing Diversity I 1221 0.5 Small Business 1 1.3 Workltfe Services 1,980 3.0L IT Overhea d Supervisory/Non-Supervisory Overhead: " 17.5i Travel f 4255 Total Direct Resources 9,360 M4.01 Total Overhead 0 17.S_5 Travel C)0.

    • !!* * * ** i~~ii;*-*..iiiiiiiiiýii

~r A ~o l D............

PLANNED ACTtVITIES.

Planning and Oversight 1901 3.0:

HLS Information Security 1,8gI 15T-10

AGENCY BUDGET FOR FY 2006 02/01/20061 FY2006w BUDGET Sheet H: Management and Support .............

.H.- .............

...... . ._ .... .................................... I............................................

K II------- FTE:::::

Computer Security 445 .

Ex,ternal Training and Development 110

,.....-5

.!,+

InenlTraintng * .Development

.,and I....

.!..*..p, . .......... -.... .......

'o~oo'+"*'=-I

................ 1

.. 2501

.Io .....o. .:

+......

Totat Direct Resources 2,893.1 18D I T IT Overhead '

Supervisory/Non-Supervisory Overhead: 0 6.0 Travel ... ........... .... .................................... J 751 __

Totae Direct Resources 1 .89f 18.0 Total Overhead "0 6.0 Travel 75 0.0

..... .......... W ..-.

PLANNED ACTIVITIES.

Desktop Support & Infrastructure, Development & Integration 13509[ 18.0 Production Operations 3,5231 3.0 Telecommunications Services and Support 7,429 5.0 Desklop Support and Network Services 651 Total Direct Resources i 25,112i 26.0 IT Overhead - l z Supervlsory;Non-Supervlsory Overhead: 9.0 Travel _

Total Direct Resources 1 25,112 26.0j Total Overhead T 0 9.0[-

Travel 0 0.0J

................ ............. . ................ ............. ....T.

PLANNED ACTIVITIES I Application Support and Integrationi 2990 Business Area Applications I 1,460 9.

Enterprise Services1,5 1.0 Total Direct Resources I 5,909j 33.01 IT Overhead 11

AGENCY BUDGET FOR FY 2006 02/01/2006 t FY2006 BUDGET Sheet H: Management and Support 1............

i.............

FTE Supervisory/Non-Supervisory Overhead: T i Travel i T .... ............................

ve.................................................................... .................. . ................

Total Direct Resources 5,9091 33a0 Total Overhead 01 11.01 Travel0 00 PLAVýNED ACTIVITIES-Information Services 1,7171 21.0f Publishing Services 2,857! 17.oi Document and Records Management 5,944 30.0 Total Direct Resources 10,518 68.01 IT Overhead 1 _

SupervIsory/Non-Supervisory Overhead j 21.0 Travel Total Direct Resources 10,518 68801 Total Overhead 01 21.01 Travel o0 O .0" MANAGEMENT AND SUPPORT STRATEGY TOTALS:

G3RAND TOTAL. HIGH- LEVEL WASTFJGene*T Fund "j 3,280 24.0 G~RAND TOTAL WITHOUT HiGH-LEVEL WASTE AND GENERAL FUND (FEE BAS* 123,570 530t 12

AGENCY BUDGET FOR FY 2006 02/01/2006 FY2006 BUDGET Sheet I: Inspector General

{$,K --------

PLANNED ACTIVITIES:

Investigations 63 16.0 Audits 995 21.0 External Training 123 General Information Technology 141 1.0 Operational Support 55 3.0.

S&B Adjustment Total Direct Resources 1,377 41.0 IT Overhead Supervisory/Non-Supervisory Overhead: 8.0 Travel 310 Total Direct Resources 1,377 41.0 Total Overhead 0 8.0 Travel 310 0.0 iNSPECTOR GENERAL STRATEGY TOTALS: .

13